Skip navigation

DSpace JSPUI

DSpace preserves and enables easy and open access to all types of digital content including text, images, moving images, mpegs and data sets

Learn More
DSpace logo
English
中文
  • Browse
    • Communities
      & Collections
    • Publication Year
    • Author
    • Title
    • Subject
    • Advisor
  • Search TDR
  • Rights Q&A
    • My Page
    • Receive email
      updates
    • Edit Profile
  1. NTU Theses and Dissertations Repository
  2. 管理學院
  3. 管理學院企業管理專班(Global MBA)
Please use this identifier to cite or link to this item: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/69122
Title: 探討印度AEC行業在設計公司套用BIM關鍵成功因素
Identifying the factors that are critical for successful delivery of BIM by design organizations in Indian AEC industry
Authors: Hamsaja Channagiri Harish
何漢莎
Advisor: Chialin Chen
Keyword: CSFs-Critical Success Factors,Organization management,BIM-Building Information Modeling,Indian AEC-ArchitecturalEngineering & Construction Industry.,
Publication Year : 2018
Degree: 碩士
Abstract: This study focuses on identifying the factors that are critical for successful delivery of BIM projects by design organizations in the Indian AEC Industry. A research methodology is outlined in this study to identify critical success factors (CSFs) for design organizations by adopting an empirical approach. A questionnaire is designed by studying the influencing factors (IFs) identified from literature and domain experts. Questionnaire surveys and focus group meetings were performed among Indian BIM experts. Statistical analysis such as respondents’ data summary, reliability analysis, and t-test are employed to examine the collected data. In this research, thirty-seven CSFs are identified for successfully delivering BIM by design organizations in Indian AEC industry. These CSFs can be used by Indian design organizations directly to align their teams towards common definition of success. The CSFs identified in this study can help the new projects and its design teams in understanding the BIM priorities, overlaps and pain points in advance and accordingly derive insights into addressing them. This research output can be used to develop the performance assessment tool to evaluate the stakeholders in the organization by clearly defining the factors and its importance in delivering the BIM projects. This research is not only capable of helping small teams of experts in India to identify CSFs, but also generally applicable for identifying CSFs in other countries.
URI: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/69122
DOI: 10.6342/NTU201801818
Fulltext Rights: 有償授權
Appears in Collections:管理學院企業管理專班(Global MBA)

Files in This Item:
File SizeFormat 
ntu-107-1.pdf
  Restricted Access
3.07 MBAdobe PDF
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved