請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/98478完整後設資料紀錄
| DC 欄位 | 值 | 語言 |
|---|---|---|
| dc.contributor.advisor | 曾惠斌 | zh_TW |
| dc.contributor.advisor | Hui-Ping Tserng | en |
| dc.contributor.author | 林筱菁 | zh_TW |
| dc.contributor.author | HSIAO-CHING LIN | en |
| dc.date.accessioned | 2025-08-14T16:16:18Z | - |
| dc.date.available | 2025-08-15 | - |
| dc.date.copyright | 2025-08-14 | - |
| dc.date.issued | 2025 | - |
| dc.date.submitted | 2025-07-31 | - |
| dc.identifier.citation | 中文參考文獻
1.王建立(2018),設計與施工階段導入BIM於機電佈線優化之研究,朝陽科技大學營建工程系碩士論文 2.王旭斌、黃世昌、王世旭、王維志(2022),台灣BIM應用現況之案例分析,營建管理季刊,第113期,1-33,DOI: 10.6505/CMJ.202212_(113).0001 3.李孟星(2012),BIM應用於營建工程施工性分析之研究,臺北科技大學土木與防災研究所碩士論文 4.李炯興(2013),結合BIM及時程資訊以偵測建築營建階段軟衝突之研究,國立臺灣大學工學院土木工程學系碩士論文 5.李德三(2024),機電工程執行專案之BIM管理模式探討-以A公司為例,國立臺北科技大學管理學院資訊與財金管理EMBA專班碩士論文 6.周鴻霖(2015),建築資訊模型(BIM)於營造施工階段之介面衝突檢討研究-以鋼骨構造大樓為例,國立臺灣海洋大學河海工程學系碩士論文 7.施植明,劉芳嘉(2015),路易斯.康建築師中的哲學家: 建築是深思熟慮的空間創造,商周出版 8.許雅婷(2019),建置建築工程BIM機電整合協同作業模式之研究,國立臺北科技大學土木工程系碩士論文 9.許雅婷(2024),建築工程BIM模型規劃與建置模式之研究,國立臺北科技大學土木工程系博士論文 10.張家安(2017),BIM軟碰撞衝突檢查應用於營建檢討流程之研究,逢甲大學建築專業學院碩士論文 11.陳韋如(2011),建築資訊模型導向營造廠流程再造之研究,國立臺灣科技大學營建工程系碩士論文 12.陳其豐(2017),建築資訊模型(BIM)的專案整合管理之應用研究,淡江大學管理科學學系碩士論文 13.陳善婷(2019),擴增實境於營建施工介面管理之研究,淡江大學土木工程學系碩士論文 14.莊玉苹(2022),BIM應用於建築工程工序檢討模式之研究,國立臺北科技大學土木工程系碩士論文 15.康思敏,莫仁維,曾雅愉(2014),BIM於建物全生命週期各階段之導入及運用,Vol.41,No.3 June 2014,土木水利,第四十一卷,第三期 16.楊智斌,李怡青(2016),國內營建產業BIM應用現況分析,營建管理季刊,105期,71-82,DOI:10.6505/CMJ-2016-105-71-12 17.楊智斌,周慧瑜(2017),台灣與其他國家BIM應用調查之比較研究,營建管理季刊,107期,1-18,DOI:10.6505/CMJ-2017-107-1-18 18.蔡協南(2023),日本營造廠在臺灣建築工程BIM規劃與執行模式之研究,國立臺北科技大學土木工程系碩士論文 19.戴期甦,陳曉晴,郭斯傑(2007),建築工程機電系統施工界面整合之探討,中華民國建築學會「建築學報」,第61期,43-6,DOI:10.6377/JA.200709.0043 20.蘇永平(2024),建設公司品牌價值提升策略探討之研究-應用AHP層級分析法,國立臺灣大學工學院土木工程學系碩士論文 21.蘇美茹(2017),運用BIM技術進行機電設計與整合探討-以捷運新建案為例,國立臺灣大學工學院土木工程學系碩士論文 22.建築法,第4條,(2022.05.11修正) 23.建築法,第8條,(2022.05.11修正) 24.建築法,第10條,(2022.05.11修正) 25.建築技術規則,建築設計施工編第162條,(2019.11.04修正) 英文參考文獻 1.Jeffrey Chiu(2024),”BIM Adoption:True? Fake? And Why ?”,Department of Civil Engineering College of Engineering National Taiwan University Master Thesis 2.Min Deng,Carol C.Menassa,Vineet R. Kamat(2021),”From BIM to digital twins: a systematic review of the evolution of intelligent building representations in the AEC-FM industry.”,Journal of Information Technology in Construction(ITcon), Special issue:‘Next Generation ICT-How distant is ubiquitous computing?’,Vol.26, pg.58-83,DOI:10.36680/j.itcon.2021.005 3.Chia-Pei Hsu(2023),”An Organizational Strategy for Developing and Managing BIM Talents in Design Firms”,Department of Civil Engineering College of Engineering National Taiwan University Master Thesis 4.Robert K.Yin.(2018).”Case study research and applications: Design and methods(6th ed.).”,Thousand Oaks,CA: SAGE Publications. | - |
| dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/98478 | - |
| dc.description.abstract | 隨著建築產業邁向數位化發展,建築資訊模型(Building Information Modeling, BIM)已成為全球推動智慧建築與永續施工之關鍵技術。惟臺灣建設產業在BIM技術導入與應用實踐層面仍處於相對初階之階段,面臨初期投資成本高昂、技術專才供給不足、標準體系與政策規範尚未完備,以及組織內部變革阻力等多重挑戰。
本研究以臺灣某上市建設公司為實證對象,採用混合研究方法,結合專家訪談、問卷調查與個案分析,探討BIM應用過程中之主要衝突疑義與應對策略。研究結果顯示,常見介面衝突類型有:(1)尺寸干涉建築空間,導致現場施工需調整或重作;(2)圖面標註錯誤,造成設計判讀分歧;(3)圖資版本不一致,導致2D圖說與3D模型資訊落差,影響施工準確性與圖資信賴度。這些問題反應出目前在圖資一致性與跨專業協作方面仍有改進空間。 本研究建議建設公司應從三個層面同步強化BIM應用基礎:(1)制度層面,建立圖資同步更新機制與跨部門檢討流程,以提升資訊透明度與模型一致性;(2)技術層面,推動以模型為基礎的圖面繪製,落實衝突檢查、法規檢核與施工模擬;(3)人力層面,加強BIM教育訓練與協作模式標準化。透過這些策略,有助於解決介面衝突問題,發揮BIM在協同設計與專案整合管理上之潛能,可作為未來建設公司導入BIM技術之策略依據與實務參考。 | zh_TW |
| dc.description.abstract | As the construction industry moves towards digital development,Building Information Modeling(BIM) has become a key technology for promoting smart buildings and sustainable construction worldwide.However,the construction industry in Taiwan is still in the relatively early stages of adopting and applying BIM technology.It faces multiple challenges,such as high initial investment costs,an insufficient supply of technical professionals,incomplete standards and policy regulations,and organizational resistance to change.This study examines a publicly listed construction company in Taiwan as an empirical case and adopts a mixed methods research,combining expert interview method,survey research method,case study research-to explore the main conflicts and coping strategies in the BIM implementation process.The research results indicate that common types of interface conflicts include:(1)spatial interferences caused by dimensional clashes,which lead to on-site adjustments or rework;(2)drawing annotation errors,resulting in differences in design interpretation;and(3)inconsistencies between drawing and model versions, causing information discrepancies between 2D drawings and 3D models,thereby affecting construction accuracy and reducing trust in the deliverables.
These issues reflect ongoing challenges related to drawing and data consistency,as well as cross-disciplinary collaboration.This study suggests that construction companies should strengthen the foundation of BIM application from three aspects:(1)Institutional level-establish mechanisms for the synchronous updating of drawings and data,along with a cross-departmental review process to enhance information transparency and model consistency;(2)Technical level-promote model-based drawing generation,implement clash detection,code compliance checks,and construction simulations;(3)Human resources level-enhance BIM education and training, and standardize collaboration models.These strategies can help resolve interface conflict issues and enable BIM to realize its full potential in collaborative design and integrated project management.The results of this study can serve as a strategic basis and practical reference for future construction companies to introduce BIM technology. | en |
| dc.description.provenance | Submitted by admin ntu (admin@lib.ntu.edu.tw) on 2025-08-14T16:16:18Z No. of bitstreams: 0 | en |
| dc.description.provenance | Made available in DSpace on 2025-08-14T16:16:18Z (GMT). No. of bitstreams: 0 | en |
| dc.description.tableofcontents | 論文口試委員審定書 I
中文摘要 II 英文摘要 III 目次 V 圖次 VIII 表次 X 第一章、緒論 1 1.1研究背景與動機 1 1.2研究目的 2 1.3 研究範圍 3 第二章、文獻探討 4 2.1建築資訊模型BIM的概念與應用 4 2.2建築資訊模型BIM工程衝突分析 5 2.3建築資訊模型BIM疑義分類 6 2.3.1建築設計與施工疑義 6 2.3.2機電設計與施工疑義 6 2.3.3建築與機電整合疑義 7 2.3.4營運與維護疑義 7 2.4臺灣營建產業與建設公司應用BIM之現況 7 2.5本章結論 9 第三章、研究方法 11 3.1研究方法 11 3.1.1專家訪談法 11 3.1.2問卷調查法 12 3.1.3個案分析法 12 3.2 研究流程與架構 12 3.3 類型定義 15 3.3.1建築定義 15 3.3.2機電定義 15 3.3.3建築與機電影響類別定義 16 3.3.4重要類別與次重要類別定義 19 3.3.5 BIM七大衝突疑義定義 19 3.4專家訪談及問卷設計 23 3.4.1專家訪談 24 3.4.2問卷設計 26 3.5本章結論 28 第四章 專家訪談與問卷調查分析 30 4.1 專家訪談彙整分析 30 4.1.1 BIM技術應用價值 31 4.1.2 BIM應用挑戰與衝突疑義 35 4.1.3對未來發展方向與產業建議 42 4.2 問卷調查分析 47 4.3建設公司BIM應用之挑戰與效益 56 4.4本章結論 59 第五章、BIM案例分析與因應對策 62 5.1案例基本資料與介紹 64 5.1.1新鼻案介紹 64 5.1.2大新案介紹 65 5.1.3青平案介紹 66 5.1.4鶯歌案介紹 67 5.2 BIM執行成果統整 68 5.2.1新鼻案執行成果分析 69 5.2.2大新案執行成果分析 76 5.2.3青平案執行成果分析 84 5.2.4鶯歌案執行成果分析 90 5.3 BIM執行成果總分析 97 5.4 建議因應對策建議 110 第六章、結論 114 6.1研究結果 114 6.2研究限制與後續研究建議 118 中文參考文獻 120 英文參考文獻 122 附錄一 專家訪談表 123 附錄二 專家應用BIM問卷調查表 125 | - |
| dc.language.iso | zh_TW | - |
| dc.subject | 問卷調查法 | zh_TW |
| dc.subject | 個案研究法 | zh_TW |
| dc.subject | 類型定義 | zh_TW |
| dc.subject | 建築資訊模型(BIM) | zh_TW |
| dc.subject | 專家訪談法 | zh_TW |
| dc.subject | 衝突疑義 | zh_TW |
| dc.subject | 建設公司 | zh_TW |
| dc.subject | construction companies | en |
| dc.subject | type definition | en |
| dc.subject | Case Study Research | en |
| dc.subject | Survey Research Method | en |
| dc.subject | Expert Interview Method | en |
| dc.subject | Building Information Modeling(BIM) | en |
| dc.subject | conflicts and disputes | en |
| dc.title | 建設公司應用BIM整合營建工種介面之現況分析與對策 | zh_TW |
| dc.title | BIM Application and Integration of Construction Engineering Trades in Construction Companies : Current Status and Strategies | en |
| dc.type | Thesis | - |
| dc.date.schoolyear | 113-2 | - |
| dc.description.degree | 碩士 | - |
| dc.contributor.coadvisor | 林偲妘 | zh_TW |
| dc.contributor.coadvisor | Szu-Yun Lin | en |
| dc.contributor.oralexamcommittee | 詹瀅潔;楊亦東 | zh_TW |
| dc.contributor.oralexamcommittee | Ying-Chieh Chan;I-Tung Yang | en |
| dc.subject.keyword | 建築資訊模型(BIM),建設公司,衝突疑義,專家訪談法,問卷調查法,個案研究法,類型定義, | zh_TW |
| dc.subject.keyword | Building Information Modeling(BIM),construction companies,conflicts and disputes,Expert Interview Method,Survey Research Method,Case Study Research,type definition, | en |
| dc.relation.page | 129 | - |
| dc.identifier.doi | 10.6342/NTU202502643 | - |
| dc.rights.note | 同意授權(全球公開) | - |
| dc.date.accepted | 2025-08-02 | - |
| dc.contributor.author-college | 工學院 | - |
| dc.contributor.author-dept | 土木工程學系 | - |
| dc.date.embargo-lift | 2025-08-15 | - |
| 顯示於系所單位: | 土木工程學系 | |
文件中的檔案:
| 檔案 | 大小 | 格式 | |
|---|---|---|---|
| ntu-113-2.pdf | 3.9 MB | Adobe PDF | 檢視/開啟 |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。
