Skip navigation

DSpace

機構典藏 DSpace 系統致力於保存各式數位資料(如:文字、圖片、PDF)並使其易於取用。

點此認識 DSpace
DSpace logo
English
中文
  • 瀏覽論文
    • 校院系所
    • 出版年
    • 作者
    • 標題
    • 關鍵字
    • 指導教授
  • 搜尋 TDR
  • 授權 Q&A
    • 我的頁面
    • 接受 E-mail 通知
    • 編輯個人資料
  1. NTU Theses and Dissertations Repository
  2. 工學院
  3. 土木工程學系
請用此 Handle URI 來引用此文件: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/98397
完整後設資料紀錄
DC 欄位值語言
dc.contributor.advisor曾惠斌zh_TW
dc.contributor.advisorHui-Ping Tserngen
dc.contributor.author劉昌煥zh_TW
dc.contributor.authorChang-Huan Liuen
dc.date.accessioned2025-08-05T16:12:42Z-
dc.date.available2025-08-06-
dc.date.copyright2025-08-05-
dc.date.issued2025-
dc.date.submitted2025-07-29-
dc.identifier.citation1.台北市都市更新處(2025)。113年度推動都市更新成果。取自https://uro.gov.taipei/News_Content.aspx?n=B649EEAA7A7E35DB&sms=3DCF9FD28E559058&s=F0E9E31078AF60FE。
2.內政部(2017)。《都市危險及老舊建築物加速重建條例》。
3.臺北市建築管理處(2010)。台北市建築管理處危老重建計畫審查核准案件統計。https://cmo.gov.taipei/cp.aspx?n=BD86021F233DC407。
4.臺北市建築管理處(2010)。《臺北市老舊公寓更新專案》報告。臺北市政府。
5.財團法人都市更新研究發展基金會(2010)。〈都市更新簡訊第47期〉。
6.內政部國土管理署(2022年7月7日)。《都市更新與危老重建成果新聞稿》。取自 https://www.nlma.gov.tw/。
7.內政部國土管理署(2025)。《立法院第11屆第3會期內政委員會第18次全體委員會會議報告:都市更新與危老重建之執行成效及未來展望》。
8.內政部國土署(2023)。《危老重建計畫受理及核准件數統計表(截至113年10月31日)》。取自 https://www.nlma.gov.tw/。
9.內政部不動產資訊平臺(2011–2024)。《住宅價格季指數》。取自 https://pip.moi.gov.tw。
10.新北市都市更新處(2022)。《危老條例執行成效探析及策進作為》。新北市政府。
11.林根旺(2024)。《113年虛坪改革之檢討與修正芻議》。建築世代,103,25–34。
12.臺灣地區房地產年鑑(2012–2023)。《101年至112年全國不動產價格變動年鑑》。臺北市:建築經理協會。
13.中信房屋、信義房屋、住商不動產(2024)。《113年臺北市12行政區平均房價實價登錄資料彙整》。
14.內政部不動產時價登錄網(2024)。〈住宅大樓五年內屋齡時價查詢(110年1月至114年4月)〉。取自https://lvr.land.moi.gov.tw/。
15.梁晴(2019)。《危老條例執行與制度檢討》。國立成功大學都市計畫研究所碩士論文。
16.許乃夫(2022)。《危老條例政策推動因素分析:以DEMATEL方法探討》。國立政治大學公共行政研究所碩士論文。
17.黃于晅(2022)。《臺中市危老條例推動影響因素之研究》。東海大學都市計畫研究所碩士論文。
18.王炳偉(2023)。《危老條例修法建議初探》。國立中興大學法律與政策研究中心報告。
19.林雯薏(2022)。《危老重建下居民參與意願與感受分析》。國立臺灣師範大學社會學研究所碩士論文。
20.沈欣潔(2024)。《危老條例下零星開發與都市景觀影響研究》。國立臺灣大學都市設計研究所碩士論文。
21.林郁瑋(2023)。《危老重建案中建商參與行為之探討:以AHP方法為例》。國立中興大學地政學系碩士論文。
22.陳宏宇(2023)。《小基地危老重建可行性研究與效益分析》。國立中山大學建築與城鄉設計研究所碩士論文。
23.陳葑檡(2024)。《臺北市危老建造執照開發特性與環境因素之統計分析》。國立臺灣大學都市與環境學系碩士論文。
24.吳佩晨(2019)。《危老重建中的信託制度應用研究》。東吳大學法律研究所碩士論文。
25.廖嘉成(2021)。《容積獎勵與室內一坪換一坪之制度落差分析》。國立成功大學都市計劃系碩士論文。
26.江青穂(1997)。《土地開發之財務分析》。國立政治大學地政學系碩士論文。
27.許正航(1998) 。《土地開發之財建築投資業投資報酬評估模式建立之研究務分析》。國立台灣科技大學營建工程系碩士論文。
-
dc.identifier.urihttp://tdr.lib.ntu.edu.tw/jspui/handle/123456789/98397-
dc.description.abstract近年來,臺灣都市地區建築物老化問題日益嚴重,尤以臺北市大量存在的四樓及五樓老舊公寓最具代表性。此類建築普遍存在結構安全不足、防災設施匱乏及居住品質劣化等問題,已成為當前都市更新政策的重要挑戰。政府自民國106年(2017)施行《都市危險及老舊建築物加速重建條例》(簡稱危老條例),希望透過容積獎勵及程序簡化等政策誘因,加速老舊建築改建。然而,由於此類建築多採用建築技術規則之建蔽率檢討量體,原有樓地板容積遠高於現行臺北市土地使用管制的法定容積率,導致即便給予容積獎勵,仍難以達成原有樓地板面積重建之目標,進而造成重建後開發效益不足,難以產生規模經濟,整體財務可行性偏低。建商因獲利空間有限而缺乏合建意願,地主也難以接受分回面積縮減或需額外出資之現實,逐漸轉向自主重建模式。
自主重建模式雖能提高地主對重建過程之主導性,實務上卻面臨產權整合困難、市場價格波動、營建成本攀升及財務風險增加等多重挑戰,使地主期望之「室內一坪換一坪且免出資」的理想難以達成,進一步降低地主的重建意願與成效。
本研究以臺北市第三種住宅區內典型之四樓及五樓老舊公寓為研究對象,探討自主重建模式之財務可行性,並採取「量化財務模型分析」結合「質性深度訪談」之混合研究方法。首先,透過Excel建立參數化財務模型,依據基地規模(小型、中型、大型)進行損益平衡及敏感度分析,並創新提出「造價比(市場售價/營建造價)」作為輔助財務指標,系統性評估市場售價、營建造價、容積獎勵及全案管理費用等關鍵變數對重建財務結果之影響;其次,透過深度訪談政府官員、開發業者、建築師、營造廠、地主代表與專家學者,驗證模型參數之實務適切性,並進一步釐清自主重建推動過程中的制度障礙與資源缺口,包括財務規劃不確定性、資訊不對稱、融資限制及全案管理(PCM)與信託制度未臻完善等問題。
研究結果指出,基地規模、市場售價、營建成本與容積獎勵為影響自主重建財務可行性的四大關鍵變數,其中市場售價與營建成本對財務績效之影響尤為顯著。特別是小型基地之財務可行性門檻極高,其重建成效高度依賴市場售價穩定性及成本控管能力。此外,本研究所提出之「造價比」指標具備良好的實務應用潛力,可協助地主與政策制定者快速掌握財務門檻,成為評估重建可行性與利害關係人溝通之有效工具。
最後,本研究依據分析結果提出以下政策建議:(1) 提升小型基地之差異化容積獎勵與稅務優惠措施;(2) 強化重建前期財務規劃補助及低利貸款融資制度;(3) 建立公開透明之財務資訊平台與營造廠履歷查詢機制;(4) 完善信託與全案管理(PCM)制度的法規及操作標準,以有效提升自主重建模式之財務穩定性及實務推動成效。本研究成果可作為未來危老自主重建政策規劃與制度設計的重要參考,期能促進政策目標與市場條件之有效接軌,實現都市安全、更新與永續發展的整體願景。
zh_TW
dc.description.abstractIn recent years, Taiwan’s urban areas have faced increasingly severe problems related to aging residential buildings, particularly exemplified by the prevalent four- and five-story old apartment buildings in Taipei City. Such buildings commonly suffer from structural safety deficiencies, inadequate disaster prevention facilities, and declining living quality, posing significant challenges for current urban renewal policies. Since 2017, the Taiwanese government has implemented the "Statute for Expediting Reconstruction of Urban Unsafe and Old Buildings" (commonly known as the Dangerous and Old Buildings Ordinance), aiming to accelerate reconstruction through incentives such as floor-area-ratio (FAR) bonuses and simplified procedures. However, as these buildings were initially constructed under older building coverage regulations, their existing floor areas substantially exceed current legal FAR limitations in Taipei. Consequently, even with FAR incentives, redevelopment projects frequently fail to achieve the original floor-area replacement goals, leading to insufficient development benefits, lack of economies of scale, and overall low financial feasibility. With limited profit potential, developers have little incentive for joint reconstruction projects, while property owners resist reduced floor-area returns or additional financial contributions, increasingly shifting towards autonomous (self-managed) reconstruction.
Although autonomous reconstruction enhances landowners' control over redevelopment processes, it faces numerous practical challenges, including fragmented property rights, market price volatility, rising construction costs, and elevated financial risks. These issues make achieving landowners' ideal of “one-for-one indoor floor area replacement without additional contributions” highly challenging, further diminishing their willingness to pursue redevelopment.
This study evaluates the financial feasibility of autonomous reconstruction through a mixed-method approach, combining quantitative financial modeling and qualitative in-depth interviews, focusing on typical four- and five-story old apartment buildings located in Taipei’s third residential zones. First, a parameterized financial model was constructed using Excel, analyzing breakeven points and conducting sensitivity analyses based on plot sizes (small, medium, large). Additionally, this study introduces an innovative financial metric, the "Price-to-Cost Ratio" (market price/construction cost), systematically assessing how critical variables such as market prices, construction costs, FAR incentives, and comprehensive project management (PCM) fees impact redevelopment financial outcomes. Second, the study validated model parameters and practical applicability through interviews with Taipei City government officials, real estate developers, architects, contractors, landowner representatives, and scholars, further identifying institutional barriers and resource gaps, including financial uncertainties, information asymmetries, financing constraints, and inadequacies in PCM and trust systems.
The results reveal four critical determinants of autonomous reconstruction financial feasibility: plot size, market price, construction cost, and FAR incentives. Among these, market prices and construction costs demonstrated the highest sensitivity and significant impact on financial performance. Small-scale plots face particularly high financial feasibility thresholds, with redevelopment outcomes heavily dependent on stable market prices and effective cost management. Additionally, the proposed "Price-to-Cost Ratio" exhibits strong practical potential, allowing landowners and policymakers to rapidly identify financial thresholds, serving as an effective tool for feasibility evaluation and stakeholder communication.
Finally, based on these findings, the study proposes specific policy recommendations: (1) Enhance differentiated FAR bonuses and tax incentives for small-scale plots; (2) Strengthen financial planning subsidies and low-interest financing during early redevelopment stages; (3) Establish a transparent financial information platform and a database of construction company performance records; (4) Improve regulatory frameworks and operational standards for trust and PCM mechanisms, effectively enhancing financial stability and practical implementation outcomes for autonomous reconstruction projects. The findings of this study serve as an important reference for future policy planning and institutional design, facilitating alignment between policy goals and market realities, ultimately contributing to comprehensive urban safety, renewal, and sustainable development.
en
dc.description.provenanceSubmitted by admin ntu (admin@lib.ntu.edu.tw) on 2025-08-05T16:12:42Z
No. of bitstreams: 0
en
dc.description.provenanceMade available in DSpace on 2025-08-05T16:12:42Z (GMT). No. of bitstreams: 0en
dc.description.tableofcontents口試委員審定書 i
致謝 ii
中文摘要及關鍵詞 iii
英文摘要及關鍵詞 v
目次 vii
圖次 xi
表次 xii
第一章 緒論 1
1.1 前言 1
1.2 研究動機與背景 3
1.3 研究目的 4
1.4 研究方法與邏輯架構 5
1.5 研究範圍與限制 6
1.6 研究流程 8
第二章 文獻回顧 10
2.1 都市更新及危老重建制度沿革與政策背景 10
2.2 危老重建政策之執行成效與政府統計資料回顧 13
2.3 臺北市老舊公寓更新專案之限制與成效分析 14
2.4 原容積認定制度對自主重建財務可行性之影響 15
2.5 臺北市不同行政區房價 18
2.6 相關論文探討 23
2.7 本章小結 26
第三章 危老重建核准案件現況分析 28
3.1 前言 28
3.2 不同使用分區vs重建計畫核准率 28
3.3 基地申請面積vs建照核准率 30
3.4 重建前樓層數vs報開工 32
3.5 本章小結 33
第四章 研究方法 35
4.1 前言 35
4.2 法令最大可建面積預估 37
4.3 財務計畫(成本預估) 37
4.4 財務計畫(利潤預估) 39
4.5 分析工具與指標 40
4.6 本章小結 41
第五章 個案模擬比較分析 43
5.1 前言 43
5.2 個案A (四樓小基地) 44
5.2.1 基地位置 44
5.2.2 財務計畫暨造價敏感度分析 44
5.2.3 售價敏感度分析 47
5.2.4 全案管理費用敏感度分析 48
5.2.5 融資利率敏感度分析 48
5.2.6 最大獎勵額度敏感度分析 49
5.2.7 造價比敏感度分析 50
5.3 個案B (四樓中基地) 51
5.3.1 基地位置 51
5.3.2 財務計畫暨造價敏感度分析 51
5.3.3 售價敏感度分析 53
5.3.4 全案管理費用敏感度分析 54
5.3.5 融資利率敏感度分析 55
5.3.6 最大獎勵額度敏感度分析 55
5.3.7 造價比敏感度分析 56
5.4 個案C (四樓大基地) 57
5.4.1 基地位置 57
5.4.2 財務計畫暨造價敏感度分析 57
5.4.3 售價敏感度分析 59
5.4.4 全案管理費用敏感度分析 60
5.4.5 融資利率敏感度分析 61
5.4.6 最大獎勵額度敏感度分析 62
5.4.7 造價比敏感度分析 62
5.5 個案D (五樓小基地) 63
5.5.1 基地位置 63
5.5.2 財務計畫暨造價敏感度分析 64
5.5.3 售價敏感度分析 66
5.5.4 全案管理費敏感度分析 67
5.5.5 融資利率敏感度分析 67
5.5.6 最大獎勵額度敏感度分析 68
5.5.7 造價比敏感度分析 69
5.6 個案E (五樓中基地) 70
5.6.1 基地位置 70
5.6.2 財務計畫暨造價敏感度分析 70
5.6.3 售價敏感度分析 72
5.6.4 全案管理費敏感度分析 73
5.6.5 融資利率敏感度分析 74
5.6.6 最大獎勵額度敏感度分析 74
5.6.7 造價比敏感度分析 75
5.7 個案F (五樓大基地) 76
5.7.1 基地位置 76
5.7.2 財務計畫暨造價敏感度分析 76
5.7.3 售價敏感度分析 79
5.7.4 全案管理費費用敏感度分析 79
5.7.5 融資利率敏感度分析 80
5.7.6 最大獎勵額度敏感度分析 81
5.7.7 造價比敏感度分析 82
5.8 比較分析 83
5.9 敏感度比較分析 83
5.9.1 營建造價敏感度比較 83
5.9.2 房屋售價敏感度比較 85
5.9.3 全案管理費用敏感度比較 86
5.9.4 融資利率敏感度比較 87
5.9.5 最大獎勵敏感度比較 88
5.9.6 造價比比較 90
5.10 本章小結 91
第六章 深度訪談 93
6.1 前言 93
6.2 訪談對象 93
6.3 代號A訪談(政府官員) 94
6.4 代號B訪談(政府官員) 97
6.5 代號C訪談(開發業者) 99
6.6 代號D訪談(建築師) 102
6.7 代號E訪談(營造廠) 104
6.8 代號F訪談(曾參與重建的地主) 107
6.9 代號G訪談(曾參與重建的地主) 109
6.10 代號H訪談(專家學者) 111
6.11 本章小結 113
第七章 結論與建議 115
7.1 研究結論 115
7.2 政策建議 116
7.3 未來研究建議 118
7.4 研究貢獻 120
參考文獻 122
-
dc.language.isozh_TW-
dc.subject危老自主重建zh_TW
dc.subject造價比zh_TW
dc.subject危老條例zh_TW
dc.subject室內一坪換一坪zh_TW
dc.subject財務可行性分析zh_TW
dc.subject敏感度分析zh_TW
dc.subjectOld Building Reconstruction Statuteen
dc.subjectSelf-Initiated Reconstructionen
dc.subjectPrice-to-Cost Ratioen
dc.subjectSensitivity Analysisen
dc.subjectIndoor Area Replacementen
dc.subjectFinancial Feasibility Analysisen
dc.title危老自主重建財務可行性評估及分析 -以臺北市重建計畫為例zh_TW
dc.titleThe Financial Feasibility Assessment and Analysis of Autonomous Reconstruction of Urban Unsafe and Old Buildings - A Case Study of Reconstruction Plans in Taipeien
dc.typeThesis-
dc.date.schoolyear113-2-
dc.description.degree碩士-
dc.contributor.oralexamcommittee詹瀅潔;林偲妘;林利國zh_TW
dc.contributor.oralexamcommitteeYing-Chieh CHAN;Szu-Yun LIN;Lee-Kuo Linen
dc.subject.keyword危老條例,危老自主重建,財務可行性分析,室內一坪換一坪,敏感度分析,造價比,zh_TW
dc.subject.keywordOld Building Reconstruction Statute,Self-Initiated Reconstruction,Financial Feasibility Analysis,Indoor Area Replacement,Sensitivity Analysis,Price-to-Cost Ratio,en
dc.relation.page123-
dc.identifier.doi10.6342/NTU202502922-
dc.rights.note同意授權(全球公開)-
dc.date.accepted2025-07-31-
dc.contributor.author-college工學院-
dc.contributor.author-dept土木工程學系-
dc.date.embargo-lift2025-08-06-
顯示於系所單位:土木工程學系

文件中的檔案:
檔案 大小格式 
ntu-113-2.pdf2.9 MBAdobe PDF檢視/開啟
顯示文件簡單紀錄


系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved