請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/9280
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 曾惠斌 | |
dc.contributor.author | Pei-Chun Chen | en |
dc.contributor.author | 陳佩君 | zh_TW |
dc.date.accessioned | 2021-05-20T20:15:46Z | - |
dc.date.available | 2016-08-18 | |
dc.date.available | 2021-05-20T20:15:46Z | - |
dc.date.copyright | 2011-08-18 | |
dc.date.issued | 2011 | |
dc.date.submitted | 2011-08-12 | |
dc.identifier.citation | 1. Russell, J.S. and Jaselskis, E.J. (1996),“Continuous assessment of project performance”, Spec. Publ. 107-1, The Construction Industry Institution
2. Chang, Andrew Shing-Tao and P.E.,Member, ASCE(2001),“Defining cost/schedule performance indices and their ranges for design projects”, 122-130, Journal of Management in Engineering 3. Cheng, Min-Yuan, Peng, Hsien-Sheng, Wu, Yu-Wei and Chen, Te-Lin (2010),“Estimate at completion for construction projects using evolutionary support vector machine inference model”, 619-629, Automation in Construction 19 4. Corbett, Charles J. and Pan, Jeh-Nan (2002),“Evaluating enviromental performance using statistical process control techniques”, 68-83,European Journal of Operational Research 139 5. Walt Lipke, Ofer Zwikael, Kym Henderson and Frank Anbari(2009),“ Prediction of project outcome The application of statistical methods to earned value management and earned schedule performance indexes”, 400-407, International Journal of Project Management 6. Lewin,A.Y.& J.W.Minton(1986),“Determining organizational effectiveness:Another look, and an agenda for research”, Management Science, Vol. 32, No. 5, pp.514-538 7. Chang,A.S.(1998),“Development of Consultant Performance Measures for Design Projects”, pp39-54, No.2, Vol.29, Project Management Journal 8. 李得璋(1996),”公共工程執行績效評估系統之研究”,行政院國家科學委員會研究報告 9. 李誠修(2000),”策略具體行動化的整合性管理架構—以計畫性生產工廠為例”,國防管理學院碩士論文 10. 袁玉珠(2001),”公共工程預算執行績效評估指標之研究—平衡計分卡之應用”,中原大學碩士學位論文 11. 何正文(2004),“ 工程顧問公司設計專案績效評估之研究 — 應用平衡計分卡觀念”, 國立臺灣大學碩士學位論文 12. 王偉嘉(2005),“ PCM專案施工階段服務績效評估系統之研究”, 國立台灣科技大學碩士學位論文 13. 呂明芬(2004),“ 代辦工程專案執行成效評估之研究-以現行工程為例”, 國立中央大學碩士學位論文 14. 李旭哲(2005),“ 公共工程執行機關績效評估模式之建立”, 國立臺北科技大學碩士學位論文 15. 邱文杰(2002),“ 施工專案績效指標與機制之建立”, 國立成功大學碩士學位論文 16. 陳進樹(2005),“ 專案管理績效模式建構之研究”, 國立台灣科技大學碩士學位論文 17. 劉加麗(2009),“ 營造廠施工階段專案績效評估指標之研究”, 國立臺灣大學碩士學位論文 18. 劉智遠(2005),“ 公共工程進度計算方式之認定研究”, 國立中央大學碩士學位論文 19. 翁慶發(2007),“ 公共工程監造品質之管理機制研究”,國立台北科技大學碩士學位論文 20. 行政院公共工程委員會(1999), “公共建設執行績效信號機制之研究” 21. 行政院公共工程委員會(2009), “品管班教材” 22. 行政院公共工程委員會(2002), “建置公共工程施工績效評估機制” | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/9280 | - |
dc.description.abstract | 當工程進行中,完成工程最希望之結果為如期完工、不超支、及具有良好品質,其中又以公共工程此種有關公眾利益之工程更須符合此種需求。公共工程為國家發展之重大指標,因而公共工程品質好壞除了對工程本身有重大影響,對於國家發展也有舉足輕重的地位,因此,對公部門而言,有效管控工程專案之表現為一重要課題。目前國內績效評估文獻大多偏重於評分機制,而傳統的工程專案控制大多仰賴工程專案管理人員的經驗觀察,系統化模式管理並不多見。目前評估工程專案績效的研究眾多,但著重進度與成本之績效評估,品質績效僅止於概念描述,無法作有效的評量。
為了建立一個客觀之績效評估管理機制,本研究以公部門業主的角度解析,並將已完工的工程專案導入資料庫,使用CAPP (Continuous Assessment Project Performance)績效管控理論發展成本與進度績效管控機制;並加入品質績效概念,以查核分數作為工程品質之代表,利用相關性分析找出指標與查核分數的關係,定義出工程品質績效評估標準。績效評估機制建立後,將執行中專案導入評估機制應用,可對執行中之工程專案進行績效評估管控,並建立一套績效評估建置流程與架構原則,以滿足其他單位執行績效評估之需求。 研究成果除了以業主角度利用CAPP對工程專案進行績效評估,找出分別標竿與警示的方程式,可判斷執行中案例目前屬於標竿抑或是警示,更以查核分數為品質績效評估基礎,針對工程專案之變更設計與進度進行相關性分析,求得重要之工程專案時程百分比,以及建立績效評估建置之步驟可套用於其他績效評估之需求。 | zh_TW |
dc.description.abstract | When the project is in progress, our best hope is that the project is completed on schedule, does not have cost overrun and has excellent quality. Public constructions, which are related to public interest, conform with those demands mostly than other constructions. Public constructions are significant indicators to national development and the quality of public constructions has a great impact on it. Because of that, controlling the constructions projects effectively is important for the government institutions. However, references of project performance evaluation emphasize mostly on scoring the construction projects and traditional project management depends on the experiences of project manager. Researches on project performance are numerous. Most of them focuses on schedule and cost. As for quality performance, it has been not evaluated effectively.
To build an objective performance evaluation mechanism, this research uses CAPP (Continuous Assessment Project Performance) theory to develop performance evaluation mechanism on schedule and cost from owner’s viewpoint and add quality performance concept that uses checking points for evaluation This study finds the equations that can separate good cases and bad cases to evaluate executing case after bringing the continuous indicators into the performance evaluation mechanism. This study also uses relevant analysis to find the relation between change orders and checking points and between schedule variance and checking points to find the important time interval. | en |
dc.description.provenance | Made available in DSpace on 2021-05-20T20:15:46Z (GMT). No. of bitstreams: 1 ntu-100-R98521715-1.pdf: 1291370 bytes, checksum: eaeb13f9231aab29ee46c35bb854d225 (MD5) Previous issue date: 2011 | en |
dc.description.tableofcontents | 第一章 緒論 1
1.1 研究動機 1 1.2 研究目的 1 1.3 研究範圍與限制 2 1.4 研究流程 2 1.4.1第一階段:指標分析 3 1.4.2第二階段:完工案例建立績效評估機制 3 1.4.3第三階段:執行中案例實際演練 3 1.5 小結 5 第二章 文獻回顧 6 2.1 公共工程之定義 6 2.2 績效評估 7 2.2.1 績效評估之定義 7 2.2.2績效評估方法 8 2.2.3 工程績效指標 10 2.3 績效評估管控系統CAPP 11 2.3.1 連續性績效指標 13 2.3.2 CAPP參數判讀 14 2.4 小結 15 第三章 績效評估機制之建置方法 16 3.1 績效評估機制建置之架構 16 3.2 績效評估指標確立 17 3.2.1 篩選文獻中指標 18 3.2.2 公部門既有指標 19 3.2.3 可用指標篩選 22 3.3 連續性指標CAPP管控區間建立方法 25 3.3.1 區別分析 25 3.3.2 模糊區間 26 3.3.3 CAPP管控區間建立流程 26 3.4 非連續性指標相關性分析方法 28 3.5小結 30 第四章 績效評估機制之建置 32 4.1 連續性指標CAPP績效管控機制 32 4.1.1 案例分類 33 4.1.2 建立案例資料 35 4.1.3 數據正規化 35 4.1.4 指標顯著差異分析 36 4.1.5 管控區間建立結果 46 4.2 非連續性指標之相關性分析 52 4.3績效管控機制之視覺化 58 4.3.1 視覺化管控設定 58 4.3.2 警示燈號設定 59 4.4 績效評估機制之驗證 60 4.4.1 查核分數與進度差異之關係 60 4.4.2 查核分數預測後續進度差異之驗證 63 4.5 績效評估機制之建置架構 67 4.6 實際績效評估 69 4.7小結 73 第五章 結論與建議 74 5.1 結論 74 5.2 後續研究建議 75 參考文獻 76 附錄A、詳細案例分類表 79 | |
dc.language.iso | zh-TW | |
dc.title | 建構公共工程施工階段績效評估機制之研究-以建築工程為例 | zh_TW |
dc.title | Establishing Performance Evaluation Mechanisms during Construction Phase for Public Constructions-An Example on Building Construction Projects | en |
dc.type | Thesis | |
dc.date.schoolyear | 99-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 林利國,周慧瑜,賴宇亭 | |
dc.subject.keyword | 績效評估,CAPP,品質績效, | zh_TW |
dc.subject.keyword | performance evaluation,CAPP (Continuous Assessment Project Performance),quality performance, | en |
dc.relation.page | 81 | |
dc.rights.note | 同意授權(全球公開) | |
dc.date.accepted | 2011-08-12 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-100-1.pdf | 1.26 MB | Adobe PDF | 檢視/開啟 |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。