Skip navigation

DSpace

機構典藏 DSpace 系統致力於保存各式數位資料(如:文字、圖片、PDF)並使其易於取用。

點此認識 DSpace
DSpace logo
English
中文
  • 瀏覽論文
    • 校院系所
    • 出版年
    • 作者
    • 標題
    • 關鍵字
  • 搜尋 TDR
  • 授權 Q&A
    • 我的頁面
    • 接受 E-mail 通知
    • 編輯個人資料
  1. NTU Theses and Dissertations Repository
  2. 工學院
  3. 工業工程學研究所
請用此 Handle URI 來引用此文件: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/65445
標題: 工件組合對生產效率之影響與上下游排程整合
The Effect of Work-in-process Mix on the Efficiency and the Integration of Upstream and Downstream Scheduling
作者: Tzu-Chien Kao
高子健
指導教授: 周雍強(Yon-Chun Chou)
關鍵字: 機台能力矩陣,工件組合,上下游排程整合,
machine capability matrix,work-in-process mix,integration of upstream and downstream scheduling,
出版年 : 2012
學位: 碩士
摘要: 機台製程能力的限制可由機台能力矩陣表示,當工作站面對的WIP到達組合與機台能力矩陣不一致時,機台之間工作負載分配會不均,工作站Throughput受到限制。本研究提出WIP分配方法,可推測最佳的WIP分配概率,使機台工作負載平衡,從中發現工作負載平衡存在極限,故WIP到達組合與機台能力矩陣不一致可能發生;並可利用此方法得到機台能力矩陣偏好的WIP組合。
  因上下游工作站機台能力矩陣相異,下游工作站面對的WIP到達組合為上游工作站排入排程的WIP組合,若此組合與下游工作站的機台能力矩陣不一致時,上游的排程限制了下游的Throughput,導致上游的Throughput較下游的Throughput高。本研究針對上下游Throughput失衡的問題,提出排程整合方法,整理上下游排程資訊,發展集合運算模型能協助找到所有改進途徑,可供下游工作站選擇成為改進方案以要求上游工作站微調排程的WIP組合,以改進下游工作站的Throughput。利用只考慮WIP到達為隨機過程的實驗,數據顯示原先上游的Throughput較下游的Throughput高;經由改進方案後,上游僅降低些微的Throughput,而下游的Throughput明顯改進,表示此方法可消弭上下游Throughput失衡的問題。
Machine capability matrix can be used to express the differences in capability between parallel machines. When the WIP arrival mix does not match the machine capability matrix, the workload of parallel machines cannot be balanced. Thus, the throughput of the shop composed of parallel machines is constrained. This research proposes WIP allocation method which can conjecture the optimal WIP allocation likelihood. However, there’s limit that the balanced workload cannot be reached. This method can help to derive the WIP mix preferred by the machine capability matrix.
  Belonging to different processes, shops have difference in machine capability matrix. The WIP arrival mix downstream shop faced with are what upstream shop scheduled to process. If the WIP mix that upstream shop scheduled does not match the machine capability matrix of downstream shop, the throughput is constrained by the schedule of upstream shop. Thus, the throughput in upstream shop is higher than that in downstream shop. This research points out the problem and proposes an integration method on upstream and downstream scheduling. It can help to find the way to improve the throughput of downstream shop. The downstream shop can select the improving policy to request the upstream shop to change the scheduled WIP mix.
We performed an experiment by considering only the stochastic processes of WIP Arrivals. The results indicate that the throughput of upstream shop is higher than that in downstream shop before using the improving policy. It also shows that the throughput of upstream shop may be decreased slightly by using improving policy. However, the throughput of downstream shop may be increased significantly. Thus, this method can mitigate the imbalanced throughput between upstream and downstream shop.
URI: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/65445
全文授權: 有償授權
顯示於系所單位:工業工程學研究所

文件中的檔案:
檔案 大小格式 
ntu-101-1.pdf
  目前未授權公開取用
1.35 MBAdobe PDF
顯示文件完整紀錄


系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved