Skip navigation

DSpace JSPUI

DSpace preserves and enables easy and open access to all types of digital content including text, images, moving images, mpegs and data sets

Learn More
DSpace logo
English
中文
  • Browse
    • Communities
      & Collections
    • Publication Year
    • Author
    • Title
    • Subject
    • Advisor
  • Search TDR
  • Rights Q&A
    • My Page
    • Receive email
      updates
    • Edit Profile
  1. NTU Theses and Dissertations Repository
  2. 工學院
  3. 土木工程學系
Please use this identifier to cite or link to this item: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/49004
Title: 不確定性分析方法之改良及其於水利工程問題之應用
Development of Improved Uncertainty Analysis Methods for Hydrosystem Engineering Problems
Authors: Long-Chen Lee
李隆成
Advisor: 蔡宛珊
Keyword: 不確定分析,點估計法,水利工程,
uncertainty analysis,PEM,hydrosystem engineering problem,
Publication Year : 2016
Degree: 碩士
Abstract: Point estimate methods (PEMs) are one of uncertainty analysis methods, which are proved to be more computationally efficient than the Monte-Carlo simulation. Application of uncertainty analysis and risk assessment has gained more popularity these days. In the first part of this study, we apply uncertainty analysis to discrete time Markov chain with an attempt to improve the discrete time Markov chain from a deterministic model to a stochastic model. And in the second part, the traditional output(s) of a stochastic model are often expressed using a region of expected value plus and minus a standard deviation. The above expression is based on an underlying assumption that the output distribution is symmetric. To extend the output distribution to an asymmetric distribution, we introduce the Gram-Charlier (GC) type-A series. The GC type-A series utilizes the statistical moments of a random variable to determine an appropriate distribution. It is more straightforward to use GC type-A series to revise the shape of distribution. Additionally, the third and fourth order statistical moments of the Perturbance moments method are made available for the use of the GC type-A series. An example of the hydraulic jump problem is presented to analyze the stochastic output of the flow depth after the jump. Finally, the PMM is improved to consider the correlation of each uncertain variable using the orthogonal transformation to the principal axis of uncertain variables. An example of particle settling is proposed to quantify the uncertainty of settling velocity of a particle.
URI: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/49004
DOI: 10.6342/NTU201603157
Fulltext Rights: 有償授權
Appears in Collections:土木工程學系

Files in This Item:
File SizeFormat 
ntu-105-1.pdf
  Restricted Access
2.45 MBAdobe PDF
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved