Skip navigation

DSpace JSPUI

DSpace preserves and enables easy and open access to all types of digital content including text, images, moving images, mpegs and data sets

Learn More
DSpace logo
English
中文
  • Browse
    • Communities
      & Collections
    • Publication Year
    • Author
    • Title
    • Subject
    • Advisor
  • Search TDR
  • Rights Q&A
    • My Page
    • Receive email
      updates
    • Edit Profile
  1. NTU Theses and Dissertations Repository
  2. 工學院
  3. 工業工程學研究所
Please use this identifier to cite or link to this item: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/46806
Title: 設備動態配置與預防保養之整合研究
Coordination of Dynamic Preventive Maintenance and Resource Allocation
Authors: Chih-Ching Yang
楊芷晴
Advisor: 吳政鴻
Keyword: 隨機動態規劃,可靠度,需求不確定,動態設備配置,動態預防保養規劃,
stochastic dynamic programming,reliability,demand uncertainty,dynamic resource allocation,dynamic preventive maintenance scheduling,
Publication Year : 2010
Degree: 碩士
Abstract: 本研究整合串連式生產系統(serial production systems)內的動態預防保養及動態多功能設備配置決策。由於生產系統多面臨外部的需求不確定,及系統內部的加工時間與設備可靠度不確定,因此如何整合預防保養與多功能設備配置有其必要性。本論文結合動態規劃(dynamic programming)與啟發式演算法(heuristic algorithm),發展有效的預防保養與動態配置決策工具,並利用離散事件模擬(discrete event simulation)進行驗證。
本論文主要可分為兩階段,第一階段利用動態規劃求解出小型兩階段系統的最佳動態資源配置方法,並以此為基礎發展啟發式動態設備配置與動態啟發式預防保養策略;第二階段將結果延伸至大型四階段串連式系統,並將結果與過去文獻之動態配置方法相較,系統產出(throughput)提升約10%,平均等候成本(average holding cost)大幅降低約20%,在製品在系統平均時間(average cycle time)也降低約22%,發現結合動態配置和預防維修可以更有效率的使用設備提生產出,並且改善系統阻塞的情況。
This paper combines dynamic resource allocation and preventive maintenance to solve “Demand uncertainties” and “Resource reliability” in a serial production system. Because of demand uncertainties and resource reliability, when and how to do preventive maintenance and allocate resource is very important. In this paper, we use dynamic programming and heuristic algorithm to develop an effective preventive maintenance and dynamic resource allocation strategy.
This paper can be divided into two stages. In the first stage, we use dynamic programming to solve a Markov decision Process in a two-stage system. Then we use the result of two-stage system to develop dynamic heuristic resource allocation and dynamic heuristic preventive maintenance method. In the second stage, we apply the result to more complex system and compare the result with other allocation method. We find that throughput is increasing around 10%. Average holding cost and average cycle time are decreasing over 20%. To sum up, the combination of dynamic resource allocation and dynamic preventive maintenance can use resource in a more effective way and also decrease bottlenecks in a system.
URI: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/46806
Fulltext Rights: 有償授權
Appears in Collections:工業工程學研究所

Files in This Item:
File SizeFormat 
ntu-99-1.pdf
  Restricted Access
1.84 MBAdobe PDF
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved