Skip navigation

DSpace JSPUI

DSpace preserves and enables easy and open access to all types of digital content including text, images, moving images, mpegs and data sets

Learn More
DSpace logo
English
中文
  • Browse
    • Communities
      & Collections
    • Publication Year
    • Author
    • Title
    • Subject
  • Search TDR
  • Rights Q&A
  • Help
    • My Page
    • Receive email
      updates
    • Edit Profile
  1. NTU Theses and Dissertations Repository
  2. 工學院
  3. 土木工程學系
Please use this identifier to cite or link to this item: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/31596
Title: 水庫操作對於短期洪災與長期缺水風險分析之研究
A Risk Analysis Study: Management of Short-term Flood Events and Long-term Water Needs via Reservoir Operation
Authors: Wen-Ming Cheng
鄭文明
Advisor: 徐年盛
Keyword: 風險分析,優化調配模式,水庫防洪操作,蒙地卡羅模擬,
Optimization model,Reservoir flood operation,Monte Carlo simulation,
Publication Year : 2011
Degree: 博士
Abstract: 本研究之目的在於提出一方法及研究分析步驟,以供評估水庫防洪操作在不同之起始水位下,對長期枯水期間缺水及短期颱風期間下游控制點溢流之風險。本研究蒐集歷史颱風期間之水庫洪水入流歷線,藉由蒙地卡羅模擬法合成大量之水庫入流量歷線,放入防洪操作模式模擬得到防洪操作結束之水庫水位,並以此為起始條件由水庫優化調配模式,計算枯水期間之供水情形;颱風期間模擬防洪操作時之水庫放水量,則由倒傳遞類神經模式計算河道下游之水位變化,進而求得間下游控制點颱風期間之最高水位。最後經由風險分析之方法以考量安全邊際之方式,計算得到不同水庫防洪起始下,枯水期間之缺水及颱風期間下游溢流風險。本研究以台灣大漢溪流域石門水庫作為研究區域,研究結果顯示不同之水庫防洪起始水位,對於需水點枯水期缺水風險之變化影響甚大,且缺水風險隨著水庫上限值之增加而明顯降低,但對於颱風期間下游控制點溢流風險之變化影響甚小,且溢流風險隨著水庫上限值之增加而些微升高。由上述分析結果,建立洪災與缺水風險關係圖,以此作為水庫操作者及決策者,制訂洪汛期間水庫最佳起始水位之參考。
This study proposes a methodology to assess the risk of the water shortage during a drought period and the risk of the downstream over-levee flows during a flood period based on the reservoir operation rules for flood control. These rules are defined by upper limits (or flood control storage zone). Through a Monte Carlo simulation, a series of hydrographs are generated to represent the reservoir inflow during a flood period based on historic typhoon events. This series of generated hydrographs are then applied to a reservoir flood operation simulation model. The simulation model calculates the water levels of reservoir at the end of a flood period and the reservoir release during the typhoon events. Reservoir release is used to calculate the water level at downstream control locations for evaluation of a short-term over-levee risk. The ending water level of the reservoir is used as the initial condition for a water distribution optimization model that evaluates drought conditions for long-term water supply. By applying risk analysis, an assessment is made on the risk of both the water shortage during a drought and over-levee flows during flooding seasons. Based on the results of the risk analysis, we evaluate the relationship among upper-limit sets, shortage risk, and over-levee risk and also provide reservoir operation suggestions based on the risk evaluation.
URI: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/31596
Fulltext Rights: 有償授權
Appears in Collections:土木工程學系

Files in This Item:
File SizeFormat 
ntu-100-1.pdf
  Restricted Access
1.51 MBAdobe PDF
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved