Skip navigation

DSpace JSPUI

DSpace preserves and enables easy and open access to all types of digital content including text, images, moving images, mpegs and data sets

Learn More
DSpace logo
English
中文
  • Browse
    • Communities
      & Collections
    • Publication Year
    • Author
    • Title
    • Subject
    • Advisor
  • Search TDR
  • Rights Q&A
    • My Page
    • Receive email
      updates
    • Edit Profile
  1. NTU Theses and Dissertations Repository
  2. 電機資訊學院
  3. 電機工程學系
Please use this identifier to cite or link to this item: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/29020
Title: 台灣電力防衛系統之研究
A Study on Taiwan Power Defense System
Authors: Yi-Jen Wang
汪以仁
Advisor: 劉志文
Keyword: 相量量測單元(PMU),單機無限匯流排系統,電力防衛系統,保護電驛設定限制等面積法則(Relay Setting Limited Equal-Area-Criterion, REAC),729事故,大停電,
Phasor Measurement Unit (PMU),One Machine Infinite Bus(OMIB),Power Defense System,Relay Setting Limited Equal-Area Criterion(REAC),729-event,Blackout,
Publication Year : 2007
Degree: 博士
Abstract: 摘 要
本論文提出一基於相量量測單元(PMU)的台灣電力防衛系統,來防止電力系統因一連串的保護電驛跳脫事故而造成電力系統崩潰。
在一個中央電腦控制中心,使用 PMU 監控電力系統中主要的發電機組以及超高壓輸電線,並且提供預測電力系統不穩定與否及防衛策略之演算法,來避免保護電驛的連續跳脫事故而造成的電力系統崩潰。當故障發生時,我們將所有一同搖擺發電機構成同一群,進而簡化成單機無限匯流排系統。並即時估測單機無限匯流排系統的參數,防衛策略是以保護電驛設定限定等面積法則(Relay Setting Limited Equal Area Criteria)來決定其控制行為的執行時機與矯正量的多寡,其中矯正行為包含負載卸載以及發電機跳機,。
此電力防衛系統是以台電系統來做為建構與測試對象,模擬狀況為台電系統在主要的超高壓輸電線有嚴重的事故,並且引起一連串的電驛跳脫時,而導致類似1999年七月二十九日台灣北部及中部大停電情形。電腦模擬結果顯示,若台電公司有此套電力防衛系統,則1999年之729大停電事件將不會發生。
Abstract
This dissertation proposes a phasor measurement units (PMUs) based power defense system to prevent power system blackout due to a cascading relay trip events..
The power defense system uses PMU’s to monitor the generators and the major EHV transmission lines of a power system, and apply an instability prediction algorithm for initiating the remedial control actions to avoid a sequence of relay trip events whenever necessary. When a fault happens, the power defense system group the generators swinging coherently and reduce the system to One-Machine-Infinite-Bus (OMIB) system equivalent. Then using real-time phasor measurements estimates the parameters of OMIB. The strategy for determining the timing and amount of remedial control actions is a proposed relay setting limited equal-area criterion for OMIB. The remedial control actions consist of load shedding and generation tripping.
The proposed scheme is tested with Taiwan power system, which experienced a severe fault at a major EHV and caused a successive relay trips resulting in system north and center area blackout on July 29,1999(729-event). According to the computer simulation results, if the Taiwan power system had implemented the power defense system then the blackout of 729-event could be avoided.
URI: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/29020
Fulltext Rights: 有償授權
Appears in Collections:電機工程學系

Files in This Item:
File SizeFormat 
ntu-96-1.pdf
  Restricted Access
14.38 MBAdobe PDF
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved