請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/10809
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 郭斯傑 | |
dc.contributor.author | Chih-Nien Chu | en |
dc.contributor.author | 朱志年 | zh_TW |
dc.date.accessioned | 2021-05-20T22:00:44Z | - |
dc.date.available | 2010-07-27 | |
dc.date.available | 2021-05-20T22:00:44Z | - |
dc.date.copyright | 2010-07-27 | |
dc.date.issued | 2010 | |
dc.date.submitted | 2010-07-15 | |
dc.identifier.citation | 1、丁永聖,「單元式帷幕牆於設計階段施工性之改善」,中華大學建築與都市計劃學系碩士論文,1990
2、小野寺勝重原著,張書文編譯,「實踐FMEA手法-提升產品或系統的可靠性、維護性、安全性」,財團法人中衛發展中心,2001 3、史文成,「單元式金屬帷幕牆開放式接頭防水設計之研究」,國立成功大學建築研究所碩士論文,2008 4、江英二,「高層建築帷幕牆系統之基本設計與專案管理」,建築師雜誌,6/7月,1991,pp.119-125 5、何錦忠,「以風險分析為概念的失效模式與效應分析之發展與應用-以汽車零組件業之個案研究」,大葉大學資訊管理學研究所碩士論文,2004 6、李政儒,「應用FMEA在建築物中央空調與煙控系統風險評估之研究」,國立台灣科技大學自動化及控制研究所碩士論文,2006 7、李浩氶,「失效模式與效應分析(FMEA)應用於營造業品質管理系統之研究」,國立台灣科技大學營建工程學系碩士論文,2004 8、邱宏達,「台灣區單元式帷幕牆施工精度控制之研究」,國立成功大學建築研究所碩士論文,1996 9、林仁德,「台灣地區帷幕牆建築技術發展之研究」,淡江大學建築學系碩士論文,1999 10、林盈忠,「風險評估技術應用於工程界面問題之預防-以變電工程為例」,國立交通大學工學院產業安全與防災學程碩士論文,2008 11、周錫英、張起明,「實施失效模式、效應與關鍵性分析之功能、需求與步驟」,品質管制月刊,第三十卷第12期,1994,pp.75-83 12、紀志旻,「帷幕牆不同構法間介面整合之研究-以單元式構法為主體探討之」,國立成功大學建築研究所碩士論文,2003 13、洪誌佑,「專案品質管理系統分析與規劃-以鋼構業為例」,國立高雄應用大學工業工程與管理系碩士論文,2003 14、洪顯宗,「捷運工程施工風險評估模式之研究」,國立中央大學營建管理研究所碩士論文,2009 15、記明伸,「ISO 9002品保文件執行施工改善計畫初步研究-以營造廠施工階段之施工性改善為例」,中華大學建築與都市計劃學系碩士論文,1990 16、高宗正、宋永鑾、李順敏、羅瑞雪,「FMEA於潛盾隧道工程風險管理之應用」,中華技術,77期,2008, pp.143~151 17、許芳勳、彭鴻霖,「失效模式、效應與關鍵性分析結果之應用」,中華民國第二屆可靠度與維護度技術研討會論文集,1997,pp.169-174 18、許盛堡,「建構一個QFD 與FMEA 之整合架構」,元智大學工業工程與管理學系碩士論文,2002 19、黃利民,「以失效模式與效應分析(FMEA)評估防洪抽水站管理模式之研究」,國立台北科技大學土木與防災研究所碩士論文,2009 20、陳志宏,「高品質建築外牆GPC、TPC 施工介面管理及工法效益之研究」,國立中央大學土木工程研究所碩士論文,2005 21、陳相如、吳貴彬,「失效模式與效應分析-QS9000之預防分析工具 」品質管理月刊,六月號,2002,pp.55~59 22、陳俊維,「FMEA應用於提昇潔淨室H.V.A.C.系統可靠度之研究」,國立成功大學資源工程學系碩士論文,2004 23、陳紹興,「失效模式及效應分析作業手冊」,經濟部工業局中心衛星工廠制度推動小組,1988 24、曹建齡、楊義明,「失效模式與效應分析的作業方式 」品質管理月刊,四月號,1997,pp.55~59 25、黃清賢,「危害分析與風險評估」,三民書局,1996 26、黃清毅、謝志勤、王琇雄, 「單元式金屬帷幕牆設計、製作、安裝研討會」,中華民國帷幕牆技術發展協會,2000 27、黃清毅、徐金水、陳文樹、謝志勤,「建築物預製金屬帷幕施工安裝研討會」,中華民國帷幕牆技術發展協會,2003 28、郭榮沛,「失效模式與效應分析及其應用案例討論」,機械工業雜誌,第一四二期,1995,pp.137-148。 29、張耀文,「複合式讀卡機之疲勞失效分析與可靠度評估」,國立交通大學工學院精密與自動化工程學程碩士論文,2006 30、葉文凱,「預鑄混凝土帷幕牆等壓防水原理PC版之開放式接合」,土木技術,第一卷第三期, 1998,pp.98~105 31、葉祥海、黃清毅、徐金水、陳文樹、謝志勤、王琇雄、林清斐,「金屬帷幕牆製造技術手冊之編訂」,內政部建築研究所委託研究報告,2004 32、楊朝鈞,「建構航空站硬體設施風險架構之研究~FMEA之應用」,國立成功大學交通管理學系碩士論文,2002 33、鈴木順二郎、牧也鐵治、石版茂樹,先鋒可靠度研究小組譯,「FMEA、FAT 實施法」,先鋒企管,1981 34、劉來旺,「建築外裝工程施工品質管理之研究-以預鑄混凝土帷幕牆工程為例」,國立台灣工業技術學院營建工程技術研究所碩士論文,1993 35、謝財源、張忠孝、鍾清章、邱柏松、王英一等譯,「可靠度管理手冊」,中華民國品質管制學會,1990,pp. 195-235 36、關季明,「失效模式與效應關鍵分析與品質機能展開之正確應用方法-全面品質經營(TQM)之利器」,品質管制月刊, 5月,1999,pp.83~85 37、羅瑞雪,「FMEA於潛盾隧道工程風險管理之應用」,中國科技大學土木與防災應用科技研究所碩士論文,2007 38、羅應浮,「專案管理的失效模式與效應分析」,中華大學工業工程與管理研究所碩士論文,2000 39、內政部建築研究所委託研究報告,「金屬帷幕牆施工安裝手冊」,2002 40、行政院研究發展考核委員會,「風險管理及危機處理作業手冊」,2009 41、Gilchrist, Warren.「Modelling failure modes and effects analysis」 International Journal of Quality and Reliability Management,vol. 10,no.5,1993,pp 16-23. 42、Nashed, fred.「Time-Saver Details for Exterior Wall Design」,McGraw-Hill,1995 43、Stamatis, D.H.「 Failure Mode and Effect Analysis: FMEA from Theory to Execution」Second Edition, Milwaukee, Wisconsin: ASQ Quality Press, 2003 44、Chrysler, Ford, General, and Plexus QS-9000 Training System,「Potential Failure mode and Effects Analysis (FMEA)」, PlexusCorporation, 2000 45、MIL-STD-1692A,「Military Standard Procedure for Performing a Failure Modes and Effect and Criticality Analysis,」Department of Defense, Washington DC, 1980. | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/10809 | - |
dc.description.abstract | 帷幕牆系統發展越來越複雜與精細,台北101之外牆玻璃帷幕,從系統設計、結構及地震與風力計算、選定材料、工廠加工組裝、乃至於現場吊裝等,全部施工過程必須符合設計需求,達到相關氣密及水密之規範要求,在生產或組裝過程發生問題都會對該專案工期及成本產生重大影響,而這都需要帷幕牆施工團隊於事前的縝密規劃,所以對於帷幕牆製造及安裝過程中相關潛在缺失能否及早發現問題與缺失進而進行防制措施,以及相關缺失如何改善以避免系統失效而產生損失。藉由失效模式與效應分析 (Failure Model and Effects Analysis,FMEA)之量化分析模式,進行評估施工中缺失改善之優先順序,以達到預防及改善施工問題之發生。
經由專家顧問問卷與資料彙整,制定成242項失效模式與原因(包括:工廠製造階段、工地吊裝階段等共計2階段、13個項次、242項),並據以擬定單元式帷幕牆之失效模式與效應分析表。依據FMEA風險優先數計算與分析,先行制訂風險優先指數>125或嚴重度>7(等級Ⅲ以上)之項目應列為加強管控項目以為重點查核、解決、改善處理對象。經風險指數分類與分析結果等級Ⅲ以上為加強管控項目共有76項,分別為等級Ⅰ計有12項,等級Ⅱ計有14項,等級Ⅲ計有50項,另等級Ⅳ及Ⅴ計有166項可依既有品質管制之管制方法與查核頻率進行管理。 242項失效模式中,風險優先法評點計算出76項加強管制項目,其中以材料進場檢驗所佔項次最多,顯見施工前與施工過程必須確認材料品質必須符合規範,才能達到帷幕牆耐久的需求。 在FMEA應用上,於規劃或製程施工前利用失效模式與效應分析法來進行施工階段作業上之潛在缺失檢討,並制定防治與改善措施,將有效降低缺失發生機率,從案例中可明確顯示風險優先數之降低。 | zh_TW |
dc.description.abstract | The development of curtain wall systems is getting more complex and exquisite. Take the facade of the Taipei 101, the tallest building in the world, for example. All the system designs, structural calculations for earthquake and wind load, material selections and the fabrication/assembly at shop and election at site should meet the design requirements of certain water- tightness and air-tightness during the process of construction. Any problems occurred during the process of production or assembly will cause a serious impact to the schedule and cost of the project. Therefore, it is necessary that the whole team of curtain wall works maps out meticulously and previously to identify potential defects and take necessary measurements to prevent such defects during the process of curtain wall construction. By means of quantitative analysis model of Failure Model and Effects Analysis (FMEA), this study aims to evaluate the priority of defect amendment for the curtain wall construction to prevent and solve problems.
242 items of failure and cause, including two stages (production and construction stages), 13 categories and 242 items are summarized through questionnaires and data collections from experts and consultants in curtain wall field. Thus, failure mode and effects analysis for unitized curtain wall are prepared. According to the calculations and analysis of risk priority number of FMEA, items with risk priority number > 125 or acuity > 7 (Level III and above) are rated as enhanced ones for primary auditing, problem-shooting, and improvement. The result of classification and analysis via danger index is that totally 76 items are rated Level III above, which are 12 items of Level I, 14 items of Level II and 50 items of Level III; the other 166 items of Level IV and Level V could be managed in accordance with existing method and auditing frequency for better quality control. Among the 76 enhanced items out of 242 items of failure model, there are material inspection upon arrival share the highest portions. This is obvious that it’s curial that the material should meet the specification requirement prior to production and construction in order to satisfy façade performance. In the application of FMEA, using the Failure Model and Effects Analysis to identify potential defects at the stage of planning and pre-construction stages to set up control and improvement measurements will effectively reduce probability of occurrence of defects. The reduction of risk priority number is apparent from the case studies. | en |
dc.description.provenance | Made available in DSpace on 2021-05-20T22:00:44Z (GMT). No. of bitstreams: 1 ntu-99-P96521701-1.pdf: 3011886 bytes, checksum: 9e48e13d6cedf88b7040fe226fa02abb (MD5) Previous issue date: 2010 | en |
dc.description.tableofcontents | 口試委員會審定書……………………………………………………i
誌謝……………………………………………………………ii 中文摘要……………………………………………………………iii 英文摘要……………………………………………………………iv 目錄……………………………………………………………vi 圖目錄……………………………………………………………ix 表目錄……………………………………………………………xi 第一章 緒論 ……………………………………………………………1 1.1研究動機 .…………………………………………………………1 1.2研究目的 .…………………………………………………………2 1.3研究範圍與限制 .…………………………………………………2 1.4研究方法與流程 .…………………………………………………2 第二章 文獻回顧 …………………………………………………………5 2.1風險管理與評估 ….………………………………………………5 2.1.1風險辨識………………………………………………………7 2.1.2風險分析………………………………………………………9 2.1.3風險評量……………………………………………………10 2.2帷幕牆工程與施工風險 ….…………………………………10 2.2.1帷幕牆的定義………………………………………………10 2.2.2帷幕牆的起源與發展………………………………………10 2.2.3帷幕牆的構成與形式 ………………………………………12 2.2.4帷幕牆之施工風險 …………………………………………14 2.3失效模式與效應分析(FMEA) …………………………………15 2.3.1 FMEA的起源與發展………………………………………17 2.3.2 FMEA相關名詞與定義……………………………………17 2.3.3 FMEA的實施對象與應用時機……………………………18 2.3.4 FMEA的實施步驟…………………………………………20 2.3.5 FMEA評價方法……………………………………………23 第三章 帷幕牆施工階段之管理…………………………………………26 3.1單元式帷幕牆工廠製造階段……………………………………26 3.1.1 材料進場檢驗………………………………………………28 3.1.2 加工裁切……………………………………………………30 3.1.3 框架組裝……………………………………………………34 3.1.4 背襯板安裝及防水施工……………………………………39 3.1.5 玻璃及石材安裝……………………………………………41 3.1.6 包裝與運輸…………………………………………………45 3.1.7 單元式帷幕牆工廠組裝階段施工程序照片………………47 3.2單元式帷幕牆工地吊裝階段……………………………………48 3.2.1 外牆結構測量………………………………………………49 3.2.2 預埋件施工…………………………………………………52 3.2.3 二次件施工…………………………………………………53 3.2.4 單元吊裝與調整……………………………………………54 3.2.5 版片擋塊安裝與接頭防漏施工……………………………63 3.2.6 層間塞施工…………………………………………………64 3.2.7 拆紙清潔……………………………………………………66 3.2.8單元式帷幕牆工地吊裝階段施工程序照片………………67 第四章 FMEA於單元式帷幕牆工程之應用……………………………68 4.1 FMEA於單元式帷幕牆工程之應用模式建構…………………68 4.1.1 實施內容……………………………………………………68 4.1.2 實施流程……………………………………………………69 4.1.3 專家訪談名單………………………………………………71 4.1.4 應用模式建構………………………………………………71 4.1.5失效模式風險指數分類……………………………………74 4.2單元式帷幕牆工程施工階段FMEA分析成果…………………75 4.2.1等級Ⅰ風險因子分析 ………………………………………77 4.2.2等級Ⅱ風險因子分析 ………………………………………82 4.2.3等級Ⅲ風險因子分析 ………………………………………87 4.3加強管制項目處理因應對策..…………………………………102 4.4案例檢討分析…………………………………………………109 4.4.1案例甲之FMEA檢核成果………………………………109 4.4.2案例乙之FMEA檢核成果………………………………113 第五章 結論與建議……………………………………………………117 5.1結論……………………………………………………………117 5.2建議……………………………………………………………118 參考文獻………………………………………………………………119 附錄……………………………………………………………………123 附錄一 第一階段問卷…………………………………………………123 附錄二 第二階段問卷…………………………………………………126 | |
dc.language.iso | zh-TW | |
dc.title | 失效模式與效應分析應用於單元式帷幕牆施工風險之探討 | zh_TW |
dc.title | Risk Analysis of Unitized Curtain Wall System―Application of Failure Mode and Effects Analysis | en |
dc.type | Thesis | |
dc.date.schoolyear | 98-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 鄭明淵,王隆昌 | |
dc.subject.keyword | 風險分析,失效模式與效應分析,風險優先數,單元式帷幕牆, | zh_TW |
dc.subject.keyword | risk analysis,Failure Model and Effects Analysis,risk priority number,unitized curtain walls, | en |
dc.relation.page | 139 | |
dc.rights.note | 同意授權(全球公開) | |
dc.date.accepted | 2010-07-16 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-99-1.pdf | 2.94 MB | Adobe PDF | 檢視/開啟 |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。