請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/92811完整後設資料紀錄
| DC 欄位 | 值 | 語言 |
|---|---|---|
| dc.contributor.advisor | 楊烽正 | zh_TW |
| dc.contributor.advisor | Feng-Cheng Yang | en |
| dc.contributor.author | 陳徐行 | zh_TW |
| dc.contributor.author | Hsu-Hsing Chen | en |
| dc.date.accessioned | 2024-07-01T16:13:19Z | - |
| dc.date.available | 2024-07-02 | - |
| dc.date.copyright | 2024-07-01 | - |
| dc.date.issued | 2024 | - |
| dc.date.submitted | 2024-06-26 | - |
| dc.identifier.citation | [1] Hsu-Hsing Chen and Feng-Cheng Yang. “A Comprehensive Survey of Metaheuristic Algorithms Applying in Mechanical Design Optimization Problems”. In: Proceedings of the International Symposium on Semiconductor Manufacturing Intelligence (ISMI 2022). Kinmen, Taiwan, 2022, pp. 11–13.
[2] Sanchoy K Das and Prashanth Nagendra. “Selection of routes in a flexible manufacturing facility”. In: International journal of production economics 48.3 (1997), pp. 237–247. [3] Ayşe Tuğba Dosdoğru, Mustafa Göçken, and Faruk Geyik. “Integration of genetic algorithm and Monte Carlo to analyze the effect of routing flexibility”. In: The International Journal of Advanced Manufacturing Technology 81 (2015), pp. 1379–1389. [4] Ghada El Khayat, Andre Langevin, and Diane Riopel. “Integrated production and material handling scheduling using mathematical programming and constraint programming”. In: European journal of operational research 175.3 (2006), pp. 1818–1832. [5] Patrick-Oliver Groß et al. “Evaluation of alternative paths for reliable routing in city logistics”. In: Transportation Research Procedia 27 (2017), pp. 1195–1202. [6] Rongge Guo et al. “Time-dependent urban customized bus routing with path flexibility”. In: IEEE Transactions on Intelligent Transportation Systems 22.4 (2020), pp. 2381–2390. [7] John H. Holland. Adaptation in natural and artificial systems: An introductory analysis with applications to biology, control, and artificial intelligence. Ann Arbor, MI: U Michigan Press, 1975. URL: https://psycnet.apa.org/record/1975-26618-000. [8] Amir Hosseini, Alena Otto, and Erwin Pesch. “Scheduling in manufacturing with transportation: Classification and solution techniques”. In: European Journal of Operational Research (2023). [9] Yixiao Huang et al. “Time-dependent vehicle routing problem with path flexibility”. In: Transportation Research Part B: Methodological 95 (2017), pp. 169–195. [10] OA Joseph and R Sridharan. “Effects of routing flexibility, sequencing flexibility and scheduling decision rules on the performance of a flexible manufacturing system”. In: The International Journal of Advanced Manufacturing Technology 56 (2011), pp. 291–306. [11] Oya E Kara san, Mustafa C Pinar, and Hande Yaman. “The robust shortest path problem with interval data”. In: (2003). [12] Damla Kizilay, Pascal Van Hentenryck, and Deniz T Eliiyi. “Constraint programming models for integrated container terminal operations”. In: European Journal of Operational Research 286.3 (2020), pp. 945–962. [13] Emilia Kondili, Constantinos C Pantelides, and Roger WH Sargent. “A general algorithm for short-term scheduling of batch operations—I. MILP formulation”. In: Computers & Chemical Engineering 17.2 (1993), pp. 211–227. [14] Ching-Jong Liao and Chii-Tsuen You. “An improved formulation for the job-shop scheduling problem”. In: Journal of the Operational Research Society 43.11 (1992), pp. 1047–1054. [15] Yi-Da Lin. “Fixed Material Transportation Network Job Scheduling Problem with Mathematical Programming Model and Heuristic Solving Methods”. MA thesis. National Taiwan University, 2023. DOI: 10.6342/NTU202302192. URL: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/88394. [16] Yun-Yuan Liu. “Solving Flexible Job and Material Delivery Scheduling Problems Using Constraint Programming”. MA thesis. National Taiwan University, 2020. DOI: 10.6342/NTU202002054. URL: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/8362. [17] Alan S Manne. “On the job-shop scheduling problem”. In: Operations research 8.2 (1960), pp. 219–223. [18] Andrea Rossi and Gino Dini. “An evolutionary approach to complex job-shop and flexible manufacturing system scheduling”. In: Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 215.2 (2001), pp. 233–245. [19] Andrea Rossi and Gino Dini. “Dynamic scheduling of FMS using a real-time genetic algorithm”. In: International Journal of Production Research 38.1 (2000), pp. 1–20. [20] Andrea Rossi and Gino Dini. “Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method”.In: Robotics and Computer-Integrated Manufacturing 23.5 (2007),pp. 503–516. [21] Roger L Sisson. “Methods of sequencing in job shops—a review”. In: Operations Research 7.1 (1959), pp. 10–29. [22] Rainer Storn and Kenneth Price. In: Journal of Global Optimization 11.4 (1997), pp. 341–359. ISSN: 0925-5001. DOI: 10.1023/a:1008202821328. URL: http://dx.doi.org/10.1023/A:1008202821328. [23] G Taguchi. Introduction to quality engineering: designing quality into products and processes. trid.trb.org, 1986. URL: https://trid.trb.org/View/1179550. [24] Hitoshi Tsubone and Mitsuyoshi Horikawa. “A comparison between machine flexibility and routing flexibility”. In: International Journal of Flexible Manufacturing Systems 11 (1999), pp. 83–101. [25] Pascal Van Hentenryck et al. “Constraint programming in OPL”. In: International Conference on Principles and Practice of Declarative Programming. Springer. 1999, pp. 98–116. [26] Hegen Xiong et al. “A survey of job shop scheduling problem: The types and models”. In: Computers & Operations Research 142 (2022), p. 105731. | - |
| dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/92811 | - |
| dc.description.abstract | 現代加工廠高度依賴自動化物料搬運系統(AHMS)來進行內部物流。本研究針對物料搬運網路中的排程問題進行探討,並定義了物料搬運網路排程問題(MaterialHandlingNetworkSchedulingProblem,MHNSP)。該問題的最佳化目標是最小化給定之搬運工作的總完工時間(makespan)。本研究的兩個特色,一是每個搬運工作具有多條候選路徑,二是搬運系統之間的輸送系統具有容量限制。
我們提出了三種求解MHNSP的模型:限制規劃(CP)模型、整數規劃(IP)模型和一種啟發式優化模型。其中,限制規劃模型採用多層次結構,以建構搬運工作、候選路徑及搬運作業(operation)間的限制式。而整數規劃模型則直接求解各搬運作業的開始時間;另外,整數規劃模型透過識別搬運作業間在時間上重疊的關係,以建構對於輸送系統容量限制的限制式。最後,我們的啟發式優化模型是透夠一個基於離散事件模擬的解碼程序,來找出各個搬運作業的開始時間。 為瞭解本研究問題在實務上的應用,及各個求解法在不同標竿問題的表現,我們通過四個數值測試對這些求解法進行評估。首先,我們使用田口方法找出啟發式優化模型的最佳參數。接下來,我們使用360個隨機生成的標竿問題來比較模型的性能。結果顯示,整數規劃模型適用於小型問題,而限制規劃和啟發式優化模型更適合大型問題。此外,測試結果顯示,在大型問題中,當每個搬運工作有多條候選路徑時,平均總完工時間約減少13%。我們還在超大型問題中測試了限制規劃和啟發式優化模型的表現,結果顯示限制規劃模型在給定充足求解時間的情況下,其求解品質皆優於啟發式優化模型。此測試應證了限制規劃模型在實際應用中的潛力。最後,我們透過「重複搬運任務測試」(IdenticalRequestTest),展示了在路徑選擇最佳化的情況下,相對於固定搬運路徑的策略,總完工時間減少了35.7%。透過對求解結果分析,可知其減少來源有二,一是搬運系統間有較平衡的工作附載,二是在物料在輸送系統中等待的時間大幅減少。 總之來說,本研究強調了物料搬運網路中路徑選擇和搬運作業排序的重要性,並提供了大量的數值測試結果以佐證。 | zh_TW |
| dc.description.abstract | Modern factories heavily rely on Automated Material Handling Systems (AHMSs) for internal logistics. This research aims to tackle the scheduling problem in the material handling network. We rigorously define the Material Handling Network Scheduling Problem (MHNSP) with the optimization goal of minimizing the makespan for a set of transportation jobs. The highlights of our research are that each job has path flexibility with multiple candidate paths, and the transfer (conveyor) systems between AHMSs have buffer capacity limits.
We propose three models to solve the MHNSP: a Constraint Programming (CP) model, an Integer Programming (IP) model, and a Metaheuristic model. The CP model employs a hierarchical structure to model the constraints between jobs, paths, and operations, while the IP model directly determines the start time of each operation. The IP model addresses site buffer constraints by identifying operation overlaps using pairwise relationships. Finally, the Metaheuristic model utilizes a discrete-event-based decoding procedure to determine the start time of each operation. The models are evaluated through four numerical tests. First, we identify the best parameters for the Metaheuristic model using the Taguchi method. Next, we compare the performance of our models using 360 randomly generated numerical test problems. The results reveal distinct strengths: the IP model is effective for small problems, while the CP and Metaheuristic models are better suited for larger problems. Additionally, test results show a significant average makespan reduction of about 13% in large-scale problems when each job has multiple candidate paths. We also evaluate the performance of the CP and Metaheuristic models in extra-large problems, finding that the CP model consistently provides better solutions than the Metaheuristic model given sufficient solving time, demonstrating the potential of CP in real applications. Finally, the identical request test highlighted that optimal path selection could lead to a 35.7% reduction in makespan by balancing node workloads and minimizing time spent at transfer sites. In conclusion, this research underscores the importance of path selection and operation sequencing in optimizing material handling networks, providing robust models and comprehensive evaluations to guide future applications. | en |
| dc.description.provenance | Submitted by admin ntu (admin@lib.ntu.edu.tw) on 2024-07-01T16:13:19Z No. of bitstreams: 0 | en |
| dc.description.provenance | Made available in DSpace on 2024-07-01T16:13:19Z (GMT). No. of bitstreams: 0 | en |
| dc.description.tableofcontents | Abstract v
Table of Contents ix List of Figures xiii List of Tables xv Glossary and Notations xvii 1 Introduction 1 1.1 Background and Motivation ............................................. 1 1.2 Research Objectives ..................................................... 3 1.3 Research Procedure ...................................................... 4 1.4 Organization of the Thesis............................................... 6 2 Literature Review 7 2.1 Transportation Network Job Scheduling Problem...................... 8 2.2 Importance of Path Flexibility in Transportation ....................... 9 2.3 Job-shop Scheduling Problem with Routing Flexibility................ 10 2.4 Job-shop Scheduling Problem Incorporating Material Handling Systems Using Constraint Programming..................... 12 2.5 CP Overview ............................................................. 13 2.6 Summary ................................................................. 17 3 Material Handling Network Scheduling Problem: Problem Description and Problem Generation 19 3.1 Problem Definition....................................................... 20 3.1.1 Problem Overview .............................................. 20 3.1.2 Mathematical Formulation...................................... 23 3.1.3 Data Structure of a Solution .................................... 31 3.1.4 Assumptions and Problem Scope .............................. 32 3.1.5 Summary ........................................................ 34 3.2 Numerical Test Problem Generation .................................... 39 3.2.1 User-defined Parameters ........................................ 40 3.2.2 Network Construction........................................... 41 3.2.3 Transportation Job Generation ................................. 44 3.2.4 ProblemScales,TypesandFileFormat........................ 50 3.2.5 Summary ........................................................ 57 4 Constraint Programming, Integer Programming, and Differential Evo- lution Models for Material Handling Network Scheduling Problem 59 4.1 CP Model for solving the MHNSP...................................... 59 4.1.1 Job Constraints .................................................. 60 4.1.2 Operation Constraints on Nodes................................ 68 4.1.3 Operation Constraints on Transfer Sites ....................... 74 4.2 IP Model for solving the MHNSP....................................... 76 4.2.1 Decision Variables and Optimization Goal .................... 77 4.2.2 Variable Constraints on Each Job .............................. 79 4.2.3 Operation Constraints on Nodes................................ 80 4.2.4 Transfer Operation Constraints on Transfer Sites.............. 83 4.3 Metaheuristic Model for solving the MHNSP .......................... 88 4.3.1 Solution Encoding and Decoding .............................. 89 4.3.2 Permutational Differential Evolution Solver ................... 102 4.4 Summary ................................................................. 106 5 Numerical Tests and Result Discussion 107 5.1 Solving Method Implementations ....................................... 107 5.2 Numerical Tests and Discussion......................................... 109 5.2.1 Differential Evolution Model Parameter-tuning Experiment via the Taguchi method................. 110 5.2.2 Model Performance Comparison Test.......................... 113 5.2.3 Extra-large Problem Test........................................ 116 5.2.4 Identical Request Test........................................... 117 5.3 Summary ................................................................. 121 6 Conclusion and Future Work Suggestion 123 6.1 Conlusion................................................................. 123 6.2 Future Work .............................................................. 125 6.2.1 Improvements in Modeling Techniques ........................ 125 6.2.2 Improvements in Research Problems........................... 126 Reference 129 A Different Type of Transportation Nodes 133 A.1 CP Model for Different Types of Transportation Nodes ............... 135 B Numerical Result Raw Data 141 | - |
| dc.language.iso | en | - |
| dc.subject | 物料搬運系統 | zh_TW |
| dc.subject | 彈性路徑 | zh_TW |
| dc.subject | 零工生產排程問題 | zh_TW |
| dc.subject | 整數規劃 | zh_TW |
| dc.subject | 限制規劃 | zh_TW |
| dc.subject | 啟發式優化模型 | zh_TW |
| dc.subject | Job-shop Scheduling Problem | en |
| dc.subject | Integer Programming | en |
| dc.subject | Constraint Programming | en |
| dc.subject | Path Flexibility | en |
| dc.subject | Metaheuristics | en |
| dc.subject | Material Handling System | en |
| dc.title | 物料搬運網路排程問題的數學規劃及啟發式優化求解法 | zh_TW |
| dc.title | Mathematical Programming and Metaheuristics for the Material Handling Network Scheduling Problem | en |
| dc.type | Thesis | - |
| dc.date.schoolyear | 112-2 | - |
| dc.description.degree | 碩士 | - |
| dc.contributor.coadvisor | 洪英超 | zh_TW |
| dc.contributor.coadvisor | Ying-Chao Hung | en |
| dc.contributor.oralexamcommittee | 周雍強;歐陽超;蔡瑞煌 | zh_TW |
| dc.contributor.oralexamcommittee | Yon-Chun Chou;Chao Ou-Yang;Rua-Huan Tsaih | en |
| dc.subject.keyword | 零工生產排程問題,物料搬運系統,限制規劃,整數規劃,啟發式優化模型,彈性路徑, | zh_TW |
| dc.subject.keyword | Job-shop Scheduling Problem,Material Handling System,Constraint Programming,Integer Programming,Metaheuristics,Path Flexibility, | en |
| dc.relation.page | 149 | - |
| dc.identifier.doi | 10.6342/NTU202401338 | - |
| dc.rights.note | 同意授權(全球公開) | - |
| dc.date.accepted | 2024-06-26 | - |
| dc.contributor.author-college | 工學院 | - |
| dc.contributor.author-dept | 工業工程學研究所 | - |
| 顯示於系所單位: | 工業工程學研究所 | |
文件中的檔案:
| 檔案 | 大小 | 格式 | |
|---|---|---|---|
| ntu-112-2.pdf | 2.06 MB | Adobe PDF | 檢視/開啟 |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。