請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/84228完整後設資料紀錄
| DC 欄位 | 值 | 語言 |
|---|---|---|
| dc.contributor.advisor | 曾惠斌(Hui-Ping Tserng) | |
| dc.contributor.author | Zi-Wen Li | en |
| dc.contributor.author | 酈梓文 | zh_TW |
| dc.date.accessioned | 2023-03-19T22:06:41Z | - |
| dc.date.copyright | 2022-07-05 | |
| dc.date.issued | 2022 | |
| dc.date.submitted | 2022-06-27 | |
| dc.identifier.citation | 黃維焄(2006)。以承包商觀點研析價值工程於鐵路地下化工程之個案研究。國立中央大學土木工程學系碩士論文。 丘仕礽(2007)。基礎開挖工法之研究。國立台北科技大學土木與防災研究所碩士論文。 黃俊(2020)。制定大型工程專案價值工程實施規範指引之研究—以捷運工程為例。國立中央大學土木工程學系營建管理組碩士論文。 常岐德 (2006)。 國內價值工程(管理)發展歷史、願景與策略。捷運技術半年刊(34期),頁 1-12。 郭仕欣(2007)。價值工程在營造業應用之探討。國立台北科技大學土木與防災研究所碩士論文。 林培元(2018)。營造業價值工程之關鍵成功因子日系營造廠之個案研究。國立臺灣大學工學院土木工程學系博士論文。 黃文隆(1997)。建築基礎工程採用壁樁及其他工法成效之分析研究。國立中央大學土木工程學系碩士在職專班。 楊承珉(2016)。逆打工程實務探討─以新北市板橋某商業大樓為例。中華大學營建管理學系碩士論文。 李培華(2020)。逆打與雙順打工法應用於 SRC 結構之工期探討。國立中央大學土木工程學系營建管理碩士論文。 陳易一(2010)。臺北都會區逆打開挖工程變形趨勢之研究。國立台北科技大學土木與防災研究所碩士論文。 張家齊、鄭清江 (2015)。 逆打與順打之影響比較-以台北信義計畫區某基地為例。技師期刊, 71期,頁 76-85。 柯宇薇(2014)。台中市高層建築以逆打工法為基礎開挖工程之研究。逢甲大學建築學系碩士論文。 陳乃城(2005)。 價值工程之應用。 營建管理淺論 戴家勝(2006)。評估交通運輸建設運用價值工程之研究-以台北捷運新莊線為例。逢甲大學交通工程與管理學系碩士論文。 林聰能、林國源 (2021)。 價值工程研析台电线路规划。價值管理期刊,頁 1-17。 趙志堅(2008)。價值工程機能分析編碼系統之研究—以臺北捷運工程為例 。國立臺灣大學土木工程學系碩士論文。 朱以帆(2006)。價值工程資訊管理系統分析與實作—以台北市捷運工程為例。國立臺灣大學土木工程學研究所碩士論文。 陳義明(2007)。價值管理於鐵路改建工程之應用研究。國立台北科技大學土木與防災研究所碩士論文。 林勳杰(2021)。捷運土地聯合開發用地規劃評估模式研究。中國文化大學環境設計學院建築及都市設計學系博士論文。 林聰能(2015)。價值工程執行暨案例說明。台灣世曦工程顧問有限公司。 蘇世章、徐震宇、鄧慶蘭(2003)。替代方案可行性之研究。國立中央大學營建管理研究所學士論文。 陳介豪、黃維焄 (2011)。 明挖覆蓋隧道工程之價值工程研析。價值管理, 18期,頁 14-28。 doi: 10.30070/vm.201109.0003 鄧振源、曾國雄 (1989)。 層級分析法(AHP)的內涵特性與應用(上)。中國統計學報, 27卷(6期),頁 13707-13724。 黃堂展(2006)。山區道路設計運用生態工法與傳統工法比較之研究。逢甲大學交通工程與管理學系碩士論文。 林坤田(2006)。統包工程進度之因素分析—以建築工程為例。國立臺灣大學土木工程學研究所碩士論文。 陳藝文(2017)。层级分析法与模糊层级分析法之探究及应用。國立高雄師範大學數學系碩士論文。 王耀輝(2009)。建築工程基礎開挖工法評選模式之研究。國立台北科技大學土木與防災研究所碩士論文。 陳紹釗(2007)。山區道路修復運用加勁擋土工法與傳統工法比較之研究。逢甲大學交通工程與管理學系碩士論文。 謝旭昇、冀樹勇、程日晟、洪世勳 (2010)。 TORSA3-使用手冊, 財團法人地工技術研究發展基金會 (第 1-32頁)。 李易昌(2013)。圓桶形配置JSG地盤改良應用於既有建物更新之基礎重建案例研究。國立交通大學土木工程系所碩士論文。 余家祥(2001)。以案例式推理建構建築工程成本估算系統。國立中央大學土木工程學系碩士論文。 陳咏麟(2011)。鋼筋混凝土構造樓層單價預測與結構體工期推估。國立交通大學土木工程學系碩士論文。 李昱儒(2004)。主項比例估價法於大陸地區住宅建築工程快速成本估價系統之應用。中華大學營建管理研究所碩士論文。 鍾恕(1992)。工程估價系統個體導向模式之分析。國立臺灣大學土木工程研究所碩士論文。 臺北市政府都市發展局 (2017)。 行政大樓第A標及社福大樓第B標統包工程統包需求計畫書(核定版) (第 1-589頁)。 廣慈博愛園區整體開發計畫。 寰正工程技術顧問有限公司 (2016)。 地質鑽探及試驗分析成果報告書 (第 1-331頁)。 王儀婷(2006)。工料成本與房屋建築造價關係之探討。國立臺灣海洋大學河海工程學系碩士論文。 潘南飛 (2006)。 模糊層級分析法應用於高雄地區深開挖擋土工法之評選。中華民國建築學會建築學報, 58期,頁 19-40。 doi: 10.6377/JA.200612.0019 沈茂松(2001)。營建工程防災技術。文笙書局。 林耀煌(1996)。高層建築—基礎開挖施工法與設計實例。長松出版社。 行政院公共工程委員會 (2020)。 公共建設工程經費估算編列手冊建築工程篇 (第 1-59頁)。 張建華(2017)。 判斷矩陣數據檢查。取自 http://blog.metadecsn.com/yaahp-matrix-check/ 郭可侯 (2020)。 边区逆打工法—中和環球購物中心案例介紹。地工技術, 164期,頁 33-38。 林秉毅(2004)。工程專案生命週期成本估價方法之探討。國立交通大學土木工程學系。 行政院公共工程委員會 (2001)。 各機關辦理公有建築物作業手冊 (第 1-152頁)。 林敏朝(2011)。營建專案工程時程預測之研究—以SRC工程專案為例。國立臺灣大學工學院土木工程學系博士論文。 范姜逸珊(2018)。建築工程不同階段施工合理工期推估模式之研究。國立中央大學營建管理研究所碩士論文。 陳維東、黃盈樺、陳鴻隆、廖深利 (2006)。 學校重建工程預算與合約工期之預測。技術學刊, 21卷(1期),頁 1-18。 圓方結構事務所 (2017a)。 廣慈博愛園區行政大樓第A標統包工程結構計算書 (第 1-225頁)。 台北市政府都市發展局。 圓方結構事務所 (2017b)。 廣慈博愛園區社福大樓第B標統包工程結構計算書 (第 1-320頁)。 台北市政府都市發展局。 三力工程顧問公司 (2020a)。 廣慈博愛園區整體開發計畫—第A標大地工程顧問服務工作總報告 (第 1-47頁)。 三力工程顧問公司 (2020b)。 廣慈博愛園區整體開發計畫—第B標大地工程顧問服務工作總報告 (第 1-41頁)。 莊坤諺(2020)。台灣離岸風場下部結構工期排程受天候影響之研究。國立台灣大學土木工程學系碩士論文。 | |
| dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/84228 | - |
| dc.description.abstract | 在營建業中,地下施工方法之選擇不當往往會導致工期延誤、成本損耗及安全性方面的各類問題。因此,選擇一個好的工法,來達到較高的安全性、較高的經濟性以及較短的時效性,一直是營建工程在發展過程中的一個非常重要的議題。前人的研究提到價值工程在台灣的營建業中還有很大的發展空間,且主要以業主的角度進行探討,而本研究將將承續前人之研究方向,將以營造廠的角度,並在統包工程之範圍內,來提出一套適合承商執行價值工程的簡易程序,同時輔以統包工程之個案進行演練,期望藉此能夠提升營造廠之行業競爭力與創造價值之能力。 本研究利用價值工程的研析流程,首先在資料階段對研析之標案的資料進行搜集。然後由於價值工程研析團隊於投備標階段已經成立,因此在這個階段,採用層級分析法的方式來輔助及進行驗證,匯總整理出開挖工法需要考慮到的所有因子,並在其中評選出了:擋土與支撐(0.1493)、鄰房狀況(0.118)、地質情況(0.108)、地下水情況(0.0901)、直接成本(0.0717)、工區動線(0.067)、施工工期(0.0641)這7個對於營造廠來講比較重要的權重大小。然後是創意階段和判斷階段,通過腦力激蕩的方式列出6個替代構想然後進行專家評選,得出3個較優的方案。最後建議發展階段,針對3個較優的方案進行成本、工期、動線、安全的量化比較後,研析出一個能够達到研究目的之替代統包設計方案,並且優於原先期招標規劃的各方面要求,且實際案例工程也在以研析之方案進行施工。因此,本價值工程研析模式在實務上具有一定可行性,建議可供後續研究深思與探討。 | zh_TW |
| dc.description.abstract | In the construction industry, improper selection of underground construction methods often leads to various problems in construction period delay, cost loss and security. Therefore, choosing a good construction method to achieve higher security and economic growth, as well as shorter timeliness, has always been a very important issue in the development of construction projects. Previous studies have mentioned that value engineering still has much developing potential in Taiwan's construction industry, and it is mainly discussed from the perspective of the owner. This research will follow the previous research and focus on the perspective of the construction plant. Within the scope of the turnkey project, this research will put forward a set of simple procedures suitable for contractors to implement value engineering, and supplement with turnkey projects for drills, hoping to improve the competitiveness and value creating ability of construction plants. This research adopts the analysis process of value engineering, and firstly collects data from related bids in this stage. Then, since the value engineering analysis team has been established in the bidding preparation stage, at this stage, the AHP method is used to assist and verify. This study summarizes all the factors that need to be considered in the excavation method, and concludes seven important weights for the construction plant: Soil Retention and Support (0.1493), Adjacent House Condition (0.118), Geological Condition (0.108), Groundwater Condition (0.0901), Direct Cost (0.0717), Work Area Moving Line (0.067), and Construction Period (0.0641). Then come the creative stage and the judgment stage. By brainstorming, six alternative ideas were listed, and three better solutions were selected by experts. Finally, in the suggestion developing stage, after quantifying the cost, construction period, moving line and security of the three solutions, an alternative turnkey design scheme, which can achieve the research purpose and is superior to the original bidding plan in all aspects, is developed. The actual case project is also constructed according to this scheme. Therefore, this value engineering research and analysis model has certain feasibility in practice, which can be recommended for further research and discussion. | en |
| dc.description.provenance | Made available in DSpace on 2023-03-19T22:06:41Z (GMT). No. of bitstreams: 1 U0001-2206202211392500.pdf: 5061988 bytes, checksum: 2c634afd639fca54bed5004207367f3b (MD5) Previous issue date: 2022 | en |
| dc.description.tableofcontents | 誌謝 I 摘要 II Abstract III 目錄 V 圖目錄 VII 表目錄 IX 第1章 緒論 1 1.1 研究背景與動機 1 1.2 研究範圍與目的 2 1.3 研究架構與流程 2 第2章 文獻回顧 5 2.1 基礎開挖工法分類 5 2.2 價值工程 9 2.3 層級分析法(AHP) 26 2.4 開挖擋土分析程式TORSA 35 2.5 工程估價 38 2.6 小結 41 第3章 研究架構與個案演練 42 3.1 研究架構 42 3.2 演練個案概要 43 3.3 工程規劃階段之關鍵課題 49 3.4 得標方案簡介 50 3.5 合約書內容 51 3.6 小結 51 第4章 價值工程研究分析 52 4.1 資料階段 52 4.2 機能階段 54 4.3 創意階段 65 4.4 判斷階段 67 4.5 建議發展階段 70 4.6 研析成果 87 4.7 安全性監測 88 4.8 小結 91 第5章 結論與建議 93 5.1 結論 93 5.2 建議 95 參考文獻 96 附錄一 101 附錄二 110 附錄三 113 | |
| dc.language.iso | zh-TW | |
| dc.subject | 價值工程 | zh_TW |
| dc.subject | TORSA | zh_TW |
| dc.subject | 統包工程 | zh_TW |
| dc.subject | 層級分析法 | zh_TW |
| dc.subject | 邊區逆打工法 | zh_TW |
| dc.subject | TORSA | en |
| dc.subject | Value Engineering | en |
| dc.subject | Analytic Hierarchy Process | en |
| dc.subject | Turnkey Engineering | en |
| dc.subject | Perimeter Top-Down Excavation Method | en |
| dc.title | 價值工程應用於廣慈博愛園區選擇地下施工方法之研究 | zh_TW |
| dc.title | Research on the application of value engineering to the selection of underground construction methods in Guangci Boai Park | en |
| dc.type | Thesis | |
| dc.date.schoolyear | 110-2 | |
| dc.description.degree | 碩士 | |
| dc.contributor.oralexamcommittee | 陳柏翰(Po-Han Chen),林偲妘(Szu-Yun Lin),林威延(Wei-Yen Lin) | |
| dc.subject.keyword | 價值工程,層級分析法,統包工程,邊區逆打工法,TORSA, | zh_TW |
| dc.subject.keyword | Value Engineering,Analytic Hierarchy Process,Turnkey Engineering,Perimeter Top-Down Excavation Method,TORSA, | en |
| dc.relation.page | 114 | |
| dc.identifier.doi | 10.6342/NTU202201058 | |
| dc.rights.note | 同意授權(限校園內公開) | |
| dc.date.accepted | 2022-06-29 | |
| dc.contributor.author-college | 工學院 | zh_TW |
| dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
| dc.date.embargo-lift | 2022-07-05 | - |
| 顯示於系所單位: | 土木工程學系 | |
文件中的檔案:
| 檔案 | 大小 | 格式 | |
|---|---|---|---|
| U0001-2206202211392500.pdf 授權僅限NTU校內IP使用(校園外請利用VPN校外連線服務) | 4.94 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。