請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/71132
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 曾惠斌 | |
dc.contributor.author | Hui-Ching Chen | en |
dc.contributor.author | 陳慧菁 | zh_TW |
dc.date.accessioned | 2021-06-17T04:54:38Z | - |
dc.date.available | 2023-08-03 | |
dc.date.copyright | 2018-08-03 | |
dc.date.issued | 2018 | |
dc.date.submitted | 2018-07-27 | |
dc.identifier.citation | 1.尹衍樑。(2006)。七定採購管理。潤泰集團。專案管理研究報告及講義。
2.尹衍樑。(2006)。創新研發開創地工新局。地工技術,107(3),2-3。 3.上海市裝配式建築發展推進平台.。(2017).。內裝-裝配式裝修整裝出發!網址: http://www.precast.com.cn/index.php/subject_detail-id-4157.html。上網日期:2018-04-30。 4.中聯造價諮詢有限公司、宜中聯綠色發展中心.。(2016)。裝配式裝修招標與合同計價。中國:中國財富出版社。 5.內政部營建署編輯委員會。(1993)。建築技術規則。營建雜誌社。 6.內政部消防署。(2002)。消防機關辦理建築物消防安全設備審查及查驗作業基準。內政部消防署法令查詢系統。網址: http://law.nfa.gov.tw/GNFA/FLAW/FLAWDAT02.aspx?LSID=FL019489。上網日期:2018-05-01。 7.內政部消防署。(2017)。消防法。全國法規資料庫。網址:http://law.moj.gov.tw/LawClass/LawContent.aspx?PCODE=D0120001。上網日期:2018-05-01。 8.內政部營建署。(2011)。建築法。全國法規資料庫。網址: http://law.moj.gov.tw/LawClass/LawContent.aspx?PCODE=D0070109。上網日期:2018-05-01。 9.內政部營建署編輯委員會。(2013)。建築物室內裝修管理辦法。全國法規資料庫。網址: http://law.moj.gov.tw/LawClass/LawAll.aspx?PCode=D0070148。上網日期:2018-05-01。 10.王成佳、王鳳文。(1999)。装配式装修。中國:遼寧建材(2),47-48。 11.朱弘家。(2009)。新造建築物之裝修工程流程及特性。土木技師電子報。網址: http://webcache.googleusercontent.com/search?q=cache:iPYb4pw3a-oJ:www.twce.org.tw/modules/freecontent/include.php%3Ffname%3Dtwce/epaper/411/index.htm+&cd=2&hl=zh-TW&ct=clnk&gl=tw。上網日期:2018-04-30。 12.百科百度。(2018)裝配式裝修。網址:https://baike.baidu.com/item/%E8%A3%85%E9%85%8D%E5%BC%8F%E8%A3%85%E4%BF%AE/20165565。上網日期:2018-03-24。 13.李慧民、趙向東、華珊、李強。(2018)。建築工業化建造管理教程。中國:科學出版社。 14.林明煌。(2011)。營建專案排程土建與機電系統關連研究-以梯廳工程為例。碩士論文。台北:國立台灣大學土木研究所。 15.品宅裝飾科技。(2017)。品宅裝配式科技內裝。網址: https://mp.weixin.qq.com/s?__biz=MzI0OTA0NDE1NA==&mid=502100743&idx=1&sn=ca77d4ad7fbe3de24f381bdd6b1a8c8f&chksm=718e5ed246f9d7c4294388cb37d41ba7f7576497f1e94917ff997e949e2fc82ace4388c85018&mpshare=1&scene=1&srcid=0131QZMOGn24BI2FpJiq0FrO#rd。上網日期:2018-04-30。 16.室内設計聯盟。(2017)。史上最全的收口細節設計。網址:https://kknews.cc/zh-tw/design/gzyg2gl.html 。上網日期:2018-04-26。 17.柯韋如。(2007)。營造廠執行專案採購精實管理之研究。碩士論文。台北:國立臺灣大學土木工程學研究所。 18.科逸整體衛浴。(2018)。裝配式內裝部品的全裝修理念.。網址: http://www.ind-building.com/Index/m_tech_info/id/450 。上網日期:2018-04-30。 19.莊修田。(2001)。室內設計專業範圍與內容之研究。國家科學委員會研究彙刊:人文及社會科學,11(3),271-281。 20.郭哲明、吳毓勳。(1999)。建築工程施工界面整合之研究。內政部建築研究所專題研究計畫成果報告。 21.郭斯傑、陳曉晴、詹慕祖。(2004)。建築工程中機電設備施工排序之探討。建築學報(45),121-141。 22.郭鴻騰。(2004)。營建工程施工與驗收階段專案管理標準作業程序之研究。碩士論文。台北:國立臺灣科技大學營建工程所。 23.陳曉晴。(2004)。建築工程機電系統施工界面整合之探討。碩士論文。台北:臺灣大學土木工程學研究所。 24.曾世杰。(2012)。室內裝修工程專案管理策略之研究。碩士論文。台北:大同大學工程學院工程管理研究所。 25.裝配式建築雲平台。(2016)。工業化內裝在中國正處於1.0到2.0的過度階段。網址: http://www.precast.com.cn/index.php/subject_detail-id-7674.html 。上網日期:2018-03-24。 26.裝配式建築雲平臺。(2018)。工業化內裝在中國正處於1.0到2.0的過度階段。網址: http://www.precast.com.cn/index.php/subject_detail-id-7674.html 。上網日期:2018-05-01。 27.劉東衛、伍止超、武 振。(2017.11)。住宅全裝修發展概況。中國:住宅產業,17-22。 28.劉美霞、張素敏。(2016.11)。裝配式裝修整裝出發。中國:住宅產業,36-38。 29.鄭瑞濱。(2005)。建築自動化發展績效調查與策略之可行性探討。內政部建築研究所研究報告。 | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/71132 | - |
dc.description.abstract | 營造業營運成本受到建築材料、人力成本等因素影響,因室內裝修工程(以下簡稱內裝工程)亦屬於營造業而深受影響。尹衍樑(2016)曾提及營建業面臨兩大壓力:一為勞工短缺,二為同業削價競爭。隨著工業4.0的推進,傳統工人逐步減少,新技術和材料被廣泛應用。內裝工程工業化的思考,就是將傳統現場工地繁複的工序簡化,以製造業定制化的生產概念,轉換成「內裝預組式工法」,成為內裝工程新的競爭優勢,創造雙贏的差異化營建管理目標。
「內裝預組式工法」採全定製化模式,以設計為核心的施工方法,採精裝修施作標準,符合台灣市場需求。其工法的使用比例會因各家施工廠商在資源掌握、施作工法、工程管理制度及專案現況條件因素不同之下而有所差異。故本研究以其工法的可工廠預製施作內容比例達50%以上,稱為「預組式室內精裝修工程」,是內裝工業化的一種施工方法。可工廠預製施作內容的重要技術門檻在於以拆解、組合、調整的三大施工規則中,為了解決設計問題所開發生產的通用性五金扣件或公母套件等研發技術;另其施工關鍵技術有三:一為放樣工程技術,二為誤差控制技術,三為1:1樣品製作等三種專門施工技術。 本研究以「內裝預組式工法」作為梯廳空間的施工方法,建立預組式室內精裝修工程的施工模式。以四大計畫:(1)可行性分析計畫、(2)前期計畫、(3)施工計畫、(4)運送計畫,以及三大施作規則:(1)拆解、(2)組合、(3)調整,配合乾式工法進行廠製化生產,再將模組部品構件運送到現場組裝施工的施工工法,建立可達到重複性模組部品構件廠製化、設計模組化、工項排程合理化及施工同步化的預組式室內精裝修工程的施工模式。 | zh_TW |
dc.description.abstract | Operating costs of the construction industry are affected by factors such as construction materials and labor costs. Construction as a part of the construction industry is also deeply affected by the aforementioned factors. Samuel Yin (2016) mentioned that the construction industry faces two problems; One is the shortage of workers, and the other is the price competition among peers. Along with the advancement of Industry 4.0, the amount of conventional skilled workers are declining, and new technologies and materials have been widely used. The idea of industrialization of construction is to simplify the complexities of traditional construction site, and to convert the production concept of the customized processes in the manufacturing industry into a “Customized Prefabrication Method”. The industrializing of construction is helpful to create new competitive advantages and a win-win construction management goal of differentiation.
The “Customized Prefabrication Method” adopts a full-customization model, uses design-centered construction method, and complies with the construction standards for high quality needs of the Taiwan market. The proportion of the use of the construction method will vary according to the differences in the resources, construction methods, project management system, and project conditions that each interior fit-out company has and faces. Therefore, in this study, we define that when the use of its construction method is more than 50%, it is called “Customized Prefabrication Method for High End Interior Fit-out”, and classified as a construction method of industrialization of construction. The important technical threshold for the customizable prefabrication lies in the three major construction rules: disassembly, assembly, and adjustment; and, these rules are set in order to solve the design problems in regard with the development and production of universal hardware connectors, coupler kits and other R & D technologies. In addition, there are three key construction technologies: layout works, deviation control and mockup. In this study, the “Customized Prefabrication Method” was used as the construction method of the elevator lobby and to create a construction mode of customized prefabrication method for high-end Construction. It consists of four major plans: (1) Feasibility Study, (2) Preliminary Plan, (3) Method Statement, (4) Logistic Plan, and three major construction rules: (1) Disassembly, (2) Assembly, (3) Adjustment. The process comprises the dry-type construction method for factory production, transport of module components to and assemble the components in construction site. The goal of the customized prefabrication method is to create a construction mode for high-end Construction that is able to manufacture repetitive module component in factory, modularize designs, rationalize project schedule of construction, and simultaneous construction. | en |
dc.description.provenance | Made available in DSpace on 2021-06-17T04:54:38Z (GMT). No. of bitstreams: 1 ntu-107-P04521713-1.pdf: 4113562 bytes, checksum: 268f064f551e638f35a6ff13f9aa06c4 (MD5) Previous issue date: 2018 | en |
dc.description.tableofcontents | 誌謝 i
中文摘要 ii ABSTRACT iii 目錄 v 圖目錄 vii 表目錄 x 第1章 緒 論 1 1.1 研究動機 1 1.2 研究目的 1 1.3 研究內容與限制 2 1.4 研究流程 4 第2章 文獻回顧 5 2.1 國內外內裝工程工業化現況 5 2.2 室內裝修工程工業化探討 9 2.2.1 裝配式裝修的研究與探討 10 2.2.2 內裝工程工業化管理 15 2.3 梯廳內裝工程相關界面項目整合探討 16 2.3.1 土建、機電及裝修工程施工項目界面 16 2.3.2 工程進度排程探討 18 2.4 小結 20 第3章 預組式室內精裝修工程施工模式建立 24 3.1 深度訪談法 24 3.1.1 訪談對象與訪談提綱內容 24 3.2 訪談調查與分析 28 3.2.1 業主(甲方)訪談調查與分析 28 3.2.2 施工單位(乙方)訪談調查與分析 29 3.3 小結 34 第4章 梯廳空間的預組式室內精裝修工程 37 4.1 傳統現場施工模式 37 4.1.1 施工工序 43 4.1.2 施工界面 48 4.1.3 室內裝修審查配合及法規檢討 64 4.2 梯廳預組式室內精裝修的工業化探討 70 4.2.1 施工工序 71 4.2.2 可行性分析計畫 79 4.2.3 前期計劃(Pre-Planing) 81 4.2.4 施工計劃 92 4.2.5 運送計劃 96 4.3 小結 97 第5章 結論與建議 100 5.1 結論 100 5.2 建議 104 參考文獻 105 圖目錄 圖1.4 1研究流程圖 4 圖2.4 1土建及機電工程施工項目 22 圖4.1 1方案A:營造廠承包模式-一般工序 39 圖4.1 2方案B:營造廠承包模式-消檢優先工序 40 圖4.1 3方案C:專業內裝承攬模式-一般工序 41 圖4.1 4方案D:專業內裝承攬模式-消檢優先工序․ 42 圖4.1.1 1營造廠承包承包界面說明 44 圖4.1.1 2專業施工廠商承包界面說明 44 圖4.1.1 3內裝工程工序流程圖-1 46 圖4.1.1 4內裝工程工序流程圖-2 47 圖4.1.2 1梯廳平面配置圖 50 圖4.1.2 2梯廳天花板造型圖 51 圖4.1.2 3 建築排煙窗圖 52 圖4.1.2 4電梯框圖-1 53 圖4.1.2 5電梯框圖-2 54 圖4.1.2 6 D1防火門圖 55 圖4.1.2 7 D2防火門圖-1 56 圖 4.1.2 8 D2防火門圖-2 57 圖4.1.2 9 D2住戶門圖-1 58 圖4.1.2 10住戶門圖-2 59 圖4.1.2 11天花器具圖 62 圖4.1.2 12梯廳牆面器具圖 63 圖4.1.3 1內裝審查配合與工程工序關係圖 64 圖4.2.1 1方案E:預組式模式-一般工序 72 圖4.2.1 2方案F:預組模式-消檢優先 73 圖4.2.1 3方案G:預組式戰鬥工期模式-一般工序 77 圖4.2.1 4方案H:預組式戰鬥工期模式-消檢優先工序 78 圖4.2.2 1成本控制流程圖 80 圖4.2.3 1設計模組化部品構件 83 圖4.2.3 2設計模組化部品構件 83 圖4.2.3 3設計模組化部品構件 84 圖4.2.3 4設計模組化部品構件 84 圖4.2.3 5設計模組化部品構件 84 圖4.2.3 6項目調整說明-1 87 圖4.2.3 7項目調整說明-2 87 圖4.2.3 8項目調整說明-3 88 圖4.2.3 9項目調整說明-4 88 圖4.2.3 10項目調整說明-5 88 圖4.2.3 11三大施作規則說明-1 89 圖4.2.3 12三大施作規則說明-2 89 圖4.2.3 13三大施作規則說明-3 90 圖4.2.3 14三大施作規則說明-4 90 圖4.2.3 15三大施作規則說明-5 91 圖4.2.3 16三大施作規則說明-6 91 圖4.2.4 1 梯廳工程同步工程-1 94 圖4.2.4 2 梯廳工程同步工程-2 95 | |
dc.language.iso | zh-TW | |
dc.title | 預組式室內精裝修工程之研究探討-以梯廳工程為例- | zh_TW |
dc.title | The Research on Customized Prefabrication Method for
High End Interior Construction -A Case Study of Elevator Lobby- | en |
dc.type | Thesis | |
dc.date.schoolyear | 106-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 郭斯傑,林永發,陳柏翰,林宏宗 | |
dc.subject.keyword | 內裝工程工業化,裝配式裝修,內裝預組式工法,預組式室內精裝修工程,梯廳, | zh_TW |
dc.subject.keyword | Industrialization of Construction,Fabricated Decoration,Customized Prefabrication Method,Customized Prefabrication Method for High-End Construction,Elevator lobby, | en |
dc.relation.page | 107 | |
dc.identifier.doi | 10.6342/NTU201802112 | |
dc.rights.note | 有償授權 | |
dc.date.accepted | 2018-07-30 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-107-1.pdf 目前未授權公開取用 | 4.02 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。