請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/70287完整後設資料紀錄
| DC 欄位 | 值 | 語言 |
|---|---|---|
| dc.contributor.advisor | 洪一? | |
| dc.contributor.author | Shao-Hao Chang | en |
| dc.contributor.author | 張少豪 | zh_TW |
| dc.date.accessioned | 2021-06-17T04:25:18Z | - |
| dc.date.available | 2023-08-18 | |
| dc.date.copyright | 2018-08-18 | |
| dc.date.issued | 2018 | |
| dc.date.submitted | 2018-08-14 | |
| dc.identifier.citation | Abyaneh, S. H., & Zandieh, M. (2012). Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers. The International Journal of Advanced Manufacturing Technology, 58(1-4), 309–325.
Afzalirad, M., & Rezaeian, J. (2016). Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions. Computers & Industrial Engineering, 98, 40–52. Attar, S., Mohammadi, M., & Tavakkoli-Moghaddam, R. (2013). Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times. The International Journal of Advanced Manufacturing Technology, 68(5-8), 1583–1599. Baptiste, P. (2003). On minimizing the weighted number of late jobs in unit execution time open-shops. European Journal of Operational Research, 149(2), 344–354. Bellanger, A., Hanafi, S., & Wilbaut, C. (2013). Three-stage hybrid-flowshop model for cross-docking. Computers & Operations Research, 40(4), 1109–1121. Bierwirth, C., & Kuhpfahl, J. (2017). Extended grasp for the job shop scheduling problem with total weighted tardiness objective. European Journal of Operational Research, 261(3), 835–848. Ebrahimi, M., Ghomi, S. F., & Karimi, B. (2014). Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates. Applied Mathematical Modelling, 38(9-10), 2490–2504. Feng, X., Zheng, F., & Xu, Y. (2016). Robust scheduling of a two-stage hybrid flow shop with uncertain interval processing times. International Journal of Production Research, 54(12), 3706–3717. Gholami, M., Zandieh, M., & Alem-Tabriz, A. (2009). Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns. The International Journal of Advanced Manufacturing Technology, 42(1-2), 189–201. Gourgand, M., Grangeon, N., & Norre, S. (2003). A contribution to the stochastic flow shop scheduling problem. European Journal of Operational Research,151(2),415–433. Gupta, J., Hariri, A., & Potts, C. (1997). Scheduling a two-stage hybrid flow shop with parallel machines at the first stage. Annals of Operations Research, 69, 171–191. Huang, W., & Li, S. (1998). A two-stage hybrid flowshop with uniform machines and setup times. Mathematical and Computer Modelling: An International Journal, 27(2), 27–45. Koulamas, C., & Panwalkar, S. (2016). The proportionate two-machine no-wait job shop scheduling problem. European Journal of Operational Research, 252(1), 131–135. Kyparisis, G. J., & Koulamas, C. (2006). Flexible flow shop scheduling with uniform parallel machines. European journal of operational research, 168(3), 985–997. Mosheiov, G., & Oron, D. (2008). Open-shop batch scheduling with identical jobs. European Journal of Operational Research, 187(3), 1282–1292. Mosheiov,G.,Sarig,A.,Strusevich,V.A.,&Mosheiff,J. (2018). Two-machine flow shop and open shop scheduling problems with a single maintenance window. European Journal of Operational Research. Mousavi, S., Mousakhani, M., & Zandieh, M. (2013). Bi-objective hybrid flow shop scheduling: a new local search. The International Journal of Advanced Manufacturing Technology, 64(5-8), 933–950. Ruiz, R., & Vázquez-Rodríguez, J. A. (2010). The hybrid flow shop scheduling problem. European journal of operational research, 205(1), 1–18. Shabtay, D. (2012). The just-in-time scheduling problem in a flow-shop scheduling system. European Journal of Operational Research, 216(3), 521–532. Shen, L., Dauzère-Pérès, S., & Neufeld, J. S. (2018). Solving the flexible job shop scheduling problem with sequence-dependent setup times. European Journal of Operational Research, 265(2), 503–516. Smutnicki, C. (1998). A two-machine permutation flow shop scheduling problem with buffers. Operations-Research-Spektrum, 20(4), 229–235. Tang, L., Liu, W., & Liu, J. (2005). A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment. Journal of Intelligent Manufacturing, 16(3), 361–370. Tang, L., & Zhang, Y. (2005). Heuristic combined artificial neural networks to schedule hybrid flow shop with sequence dependent setup times. In International symposium on neural networks (pp. 788–793). Vila, I.R.,&Pascual, R.C. (2009). Ahybridflowshopmodelforanicecreamproduction scheduling problem. Journal of Industrial Engineering and Management, 2(1), 60–89. Wang, S., & Liu, M. (2014). Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objective tabu search method. International Journal of Production Research, 52(5), 1495–1508. Yaurima, V., Burtseva, L., & Tchernykh, A. (2009). Hybrid flowshop with unrelated machines, sequence-dependent setup time, availability constraints and limited buffers. Computers & Industrial Engineering, 56(4), 1452–1463. Zabihzadeh, S. S., & Rezaeian, J. (2016). Two meta-heuristic algorithms for flexible flow shop scheduling problem with robotic transportation and release time. Applied Soft Computing, 40, 319–330. Zhang, X.-Y., & Chen, L. (2016). Heuristics for minimizing the total tardiness in a reentrant hybrid flow shop with non-identical machines in parallel. In Industrial engineering and engineering management (ieem), 2016 ieee international conference on (pp. 987–991). Zhong, W.-y., & Lv, L.-h. (2014). Hybrid flowshop scheduling with interstage job transportation. Journal of the Operations Research Society of China, 2(1), 109–121. Zhou, H., Cheung, W., & Leung, L. C. (2009). Minimizing weighted tardiness of job shop scheduling using a hybrid genetic algorithm. European Journal of Operational Research, 194(3), 637–649. | |
| dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/70287 | - |
| dc.description.abstract | 本論文研究一種混合型流程式生產排程問題其考慮非相關平行加工機台與順序相依整備時間。根據產線特性,我們提出兩種演算法。在相同的參數設定下,數值分析顯示總體訂單派工演算法在總完工時間,平均總訂單延遲,延遲訂單張數皆優於分群訂單派工演算法。最後討論未來研究延伸方向。 | zh_TW |
| dc.description.abstract | In this paper, we study a two-stage hybrid flow shop scheduling problem where unrelated parallel machines and sequence-dependent setup time are considered.We propose two algorithms based on the characteristics of the production line.Under the same parameter settings, our numerical results show that overall order dispatch (OODA) algorithm outforms clustered order dispatching (CODA) algorithm with respect to the makespan, average total tardiness, and the number of delayed orders.In the end, we discuss the future research directions. | en |
| dc.description.provenance | Made available in DSpace on 2021-06-17T04:25:18Z (GMT). No. of bitstreams: 1 ntu-107-R05546038-1.pdf: 716413 bytes, checksum: 2e788e4040ef137d0e53dfad940fed49 (MD5) Previous issue date: 2018 | en |
| dc.description.tableofcontents | 誌謝 i
摘要 ii Abstract iii 目錄 v 圖目錄 vi 表目錄 vii 1 緒論 1 2 方法論 7 2.1 問題描述 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 2.1.1 生產線架構 . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 2.1.2 各階段工作站加工機台生產性質 . . . . . . . . . . . . . . . . 7 2.1.3 工作生產性質 . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 2.1.4 訂單生產性質 . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 2.2 總體訂單派工演算法 . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 2.2.1 總體訂單派工演算法集合 . . . . . . . . . . . . . . . . . . . . 11 2.2.2 總體訂單派工演算法參數 . . . . . . . . . . . . . . . . . . . . 11 2.2.3 總體訂單派工演算法變數 . . . . . . . . . . . . . . . . . . . . 12 2.3 分群訂單派工演算法 . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 2.3.1 分群訂單派工演算法集合 . . . . . . . . . . . . . . . . . . . . 14 2.3.2 分群訂單派工演算法參數 . . . . . . . . . . . . . . . . . . . . 15 2.3.3 分群訂單派工演算法變數 . . . . . . . . . . . . . . . . . . . . 15 2.4 時間計算 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 3 個案分析 20 3.1 績效指標 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 3.2 參數設定 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 3.3 結果比較 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 3.4 敏感度分析 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 3.4.1 針對需求量 . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 3.4.2 針對交期 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 3.4.3 針對第一階段加工處理時間 . . . . . . . . . . . . . . . . . . . 25 3.4.4 針對第二階段加工處理時間 . . . . . . . . . . . . . . . . . . . 26 3.4.5 針對第一階段順序相依整備時間 . . . . . . . . . . . . . . . . 27 3.4.6 針對第二階段順序相依整備時間 . . . . . . . . . . . . . . . . 28 4 結論與未來方向 30 References 32 參考文獻 32 | |
| dc.language.iso | zh-TW | |
| dc.subject | 混合型流程式生產 | zh_TW |
| dc.subject | 順序相依整備時間 | zh_TW |
| dc.subject | 平均總訂單延遲 | zh_TW |
| dc.subject | 總完工時間 | zh_TW |
| dc.subject | 總延遲訂單張數 | zh_TW |
| dc.subject | 非相關平行加工機台 | zh_TW |
| dc.subject | Number of delayed orders | en |
| dc.subject | Unrelated parallel machines | en |
| dc.subject | Sequence-dependent setup time | en |
| dc.subject | Makespan | en |
| dc.subject | Average total tardiness | en |
| dc.subject | Hybrid flow shop | en |
| dc.title | 非相關平行加工機台與順序相依整備時間之混合型流程式生產排程 | zh_TW |
| dc.title | Hybrid Flow Shop Scheduling with Unrelated Parallel Machines and Sequence-dependent Setup Time | en |
| dc.type | Thesis | |
| dc.date.schoolyear | 106-2 | |
| dc.description.degree | 碩士 | |
| dc.contributor.oralexamcommittee | 藍俊宏,陳文智 | |
| dc.subject.keyword | 混合型流程式生產,非相關平行加工機台,順序相依整備時間,總完工時間,平均總訂單延遲,總延遲訂單張數, | zh_TW |
| dc.subject.keyword | Hybrid flow shop,Unrelated parallel machines,Sequence-dependent setup time,Makespan,Average total tardiness,Number of delayed orders, | en |
| dc.relation.page | 35 | |
| dc.identifier.doi | 10.6342/NTU201803408 | |
| dc.rights.note | 有償授權 | |
| dc.date.accepted | 2018-08-15 | |
| dc.contributor.author-college | 工學院 | zh_TW |
| dc.contributor.author-dept | 工業工程學研究所 | zh_TW |
| 顯示於系所單位: | 工業工程學研究所 | |
文件中的檔案:
| 檔案 | 大小 | 格式 | |
|---|---|---|---|
| ntu-107-1.pdf 未授權公開取用 | 699.62 kB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。