請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/56523| 標題: | 使用現地影片建立之語意化虛擬工地 A Video-Enabled Semantic Virtual Construction |
| 作者: | Chin-Wei Liu 劉晉瑋 |
| 指導教授: | 康仕仲(Shih-Chung Jessy Kang) |
| 關鍵字: | 動態規劃,虛擬工地,現地影像,空間規劃, site layout planning,dynamic site,virtual construction,cameras,real-time,simulation, |
| 出版年 : | 2014 |
| 學位: | 碩士 |
| 摘要: | A good site layout planning can avoid possible conflicts of equipment and increase accessibility during a construction process. In current practice, it is difficult to re-plan layout during the site process since the location and quantity of on-site resources change over time. Many researchers have developed site cameras to facilitate dynamic space management. However, using cameras in the site still has fragmentation between site monitoring and planning. In this research, we aim to rapidly retrieve geometric information from site cameras for dynamic site planning. We developed a four-step method: projection, duplication, description and calibration. The first step, projection, is to establish the projective model of the camera between videos and actual site. The second step, duplication, is to rapidly acquire positions and dimensions of construction objects based on the video images and model their 3D geometry in geometric virtual construction. The third step, description, is to link the geometric models with the real objects and build semantic virtual constriction, which contains not only on-site scenarios but also engineers' knowledge. The fourth step, calibration, is to improve the accuracy of the virtual construction for realistic planning. We built a software tool by integrating the four steps. The tool allows engineer to load the video and specify the location of each object. They are also able to specify the meaning of the objects. The algorithms are simultaneously creating the numerical models to link the images on the video with the virtual models. We used a real campus building to validate the usability of our method. Using the CCTV videos retrieved from the site, it took 123 seconds to create a virtual construction site. We compared the actual objects with virtual ones and found the errors are from 0.2 to 1.2 meters. The results indicate our method is feasible to transfer video to numerical virtual construction site within a reasonable time and accuracy. |
| URI: | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/56523 |
| 全文授權: | 有償授權 |
| 顯示於系所單位: | 土木工程學系 |
文件中的檔案:
| 檔案 | 大小 | 格式 | |
|---|---|---|---|
| ntu-103-1.pdf 未授權公開取用 | 680.02 kB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。
