請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/5428
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 荷世平,曾惠斌 | |
dc.contributor.author | Shu-Hui Jan | en |
dc.contributor.author | 冉淑慧 | zh_TW |
dc.date.accessioned | 2021-05-15T17:58:37Z | - |
dc.date.available | 2019-03-09 | |
dc.date.available | 2021-05-15T17:58:37Z | - |
dc.date.copyright | 2014-03-09 | |
dc.date.issued | 2014 | |
dc.date.submitted | 2014-02-14 | |
dc.identifier.citation | Arayici, Y., Coates, P., Koskela, L., Kagioglou, M., Usher, C., & O'Reilly, K., (2011). Technology adoption in the BIM implementation for lean architectural practice. Automation in Construction, 20(2), 189-195.
Azhar, S. (2011). Building Information Modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241-252. Azimi, R., Lee, S.H., AbouRizk, S.M., Alvanchi, A. (2011). A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Automation in Construction, 20(1), 88-97. Barlish, K., & Sullivan, K. (2012). How to measure the benefits of BIM - A case study approach. Automation in Construction, 24, 149-159. Becerik-Gerber, B., & Rice, S. (2010). The perceived value of building information modeling in the US building industry, Journal of Information Technology in Construction (ITcon), 15, 185-201. Bergmann, R. (2002). Experience management: Foundations, Development Methodology, and Internet-Based Applications. Berlin, Germany: Springer. BIMForum. (2013). Level of Development Specification. (Last accessed October 2013). Retrieved from http://bimforum.org/wp-content/uploads/2013/08/2013-LOD-Specification.pdf. Bosche, F., Haas, C.T., & Murray, P. (2008). Performance of automated project progress tracking with 3D data fusion. Proc. of CSCE Annual Conference, 10-13 June, 2008, Quebec, QC, Canada. 10p. Bosche, F., Teizer, J., Haas, C.T., & Caldas, C.H. (2006). Integrating data from 3D CAD and 3D cameras for real-time modeling. Joint International Conference on Computing and Decision Making in Civil and Building Engineering, June, 2006, Montreal, QC, Canada. 9 p. Bryde, D., Broquetas, M., & Volm, J.M. (2013). The project benefits of Building Information Modelling (BIM). International Journal of Project Management, 31(7), 971-980. Buildipedia Company. (2013). The Daily Life of Building Information Modeling (BIM) (Last accessed May 2013). Retrieved from http://buildipedia.com/aec-pros/design-news/the-daily-life-of-building-information-modeling-bim. Bynum, P., Issa, R., & Olbina, S. (2012). Building Information Modeling in Support of Sustainable Design and Construction. Journal of Construction Engineering and Management, 139(1), 24-34. Chau, K., Anson, M., & Zhang, J. (2004). Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), 598-606. Chavada, R., Dawood, N., & Kassem, M. (2012). Construction workspace management: the development and application of a novel nD planning approach and tool. Construction Innovation, 17, 213-236. Chen, S.M., Griffis, F.H., Chen, P.H., & Chang, L.M. (2013). A framework for an automated and integrated project scheduling and management system. Automation in Construction, 35, 89-110. Chen, J.H., Hsu, S.C., Luo, Y.H., & Skibniewski, M.J. (2012). Knowledge Management for Risk Hedging by Construction Material Suppliers. Journal of Management in Engineering, 28(3), 8-26. Chen, L., & Mohamed, S. (2010). The strategic importance of tacit knowledge management activities in construction. Construction Innovation, 10(2), 138-163. Chen, Y.H., Tsai, M.H., Kang, S.C., & Liu, C.W. (2013). Selection and evaluation of color sheme for 4D construction models. Journal of Information Technology in Construction (ITcon), 18, 1-19. Davenport, T.H., & Probst, G.J.B. (2002). Knowledge management case book: Siemens best practices. New York, USA: John Wiley & Sons. Davenport, T.H., & Prusak, L. (1998). Working Knowledge. New York, NY, USA: Harvard Business School Press. Davidson, I., & Skibniewski, M. (1995). Simulation of Automated Data Collection in Buildings. Journal of Computing in Civil Engineering, 9(1), 9-20. Davies, R., & Harty, C. (2013). Implementing ‘Site BIM’: A case study of ICT innovation on a large hospital project. Automation in Construction, 30, 15-24. Dossick, C. S., & Neff, G. (2010). Organizational Divisions in BIM-Enabled Commercial Construction. Journal of Construction Engineering and Management, 136(4), 459-467. Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: a guide to building information modeling for owners, managers, designers, engineers and contractors. 2nd ed. New Jersey: John Wiley and Sons, Inc. Elbeltagi, E., & Dawood, M. (2011). Integrated visualized time control system for repetitive construction projects. Automation in Construction, 20(7), 940-953. El-Diraby, T.E., & Kashif, K.F. (2005). Distribute Ontology Architecture for Knowledge Management in Highway Construction. Journal of Construction Engineering and Management, 131(5), 591-603. El-Omari, S., & Moselhi, O. (2008). Integrating 3D laser scanning and photogrammetry for progress measurement of construction work. Automation in Construction, 18(1), 1-9. El-Omari, S., & Moselhi, O. (2009). Data acquisition from construction sites for tracking purposes. Engineering, Construction and Architectural Management, 16(5), 490-503. Epstein, E. (2012). Implementing Successful Building Information Modeling. Norwood, MA, USA: Artech House. Forcada, N., Fuertes, A., Gangolells, M., Casals, M., & Macarulla, M. (2013). Knowledge management perceptions in construction and design companies. Automation in Construction, 29, 83-91. Fu, C., Aouad, G., Lee, A., Mashall-Ponting, A., & Wu, S. (2006). IFC model viewer to support nD model application. Automation in Construction, 15, 178-185. Goedert, J.D., & Meadati, A.G.F. (2008). Integrating Construction Process Documentation into Building Information Modeling. Journal of Construction Engineering and Management, 134(7), 509-516. Gu, N., & London, K. (2010). Understanding and facilitating BIM adoption in the AEC industry. Automation in Construction, 19(8), 988-999. Gurevich, U., & Sacks, R. (2014). Examination of the effects of a KanBIM production control system on subcontractors' task selections in interior works. Automation in Construction, 37, 81-87. Hardin, B. (2009). BIM and construction management: proven tools, methods, and workflows. NJ: John Wiley and Sons, Inc. Hart, A. (1992). Knowledge Acquisition for Expert Systems. 2nd ed. New York: McGraw-Hill. Hartmann, T., & Fischer, M. (2007). Supporting the constructability review with 3D/4D models. Building Research & Information, 35(1), 70-80. Hartmann, T., Meerveld, H.V., Vossebeld, N., & Adriaanse, A. (2012). Aligning building information model tools and construction management methods. Automation in Construction, 22, 605-613. Hassanain, M.A., Froese, T.M., & Vanier, D.J. (2001). Development of a maintenance management model based on IAI standards. Artificial Intelligence in Engineering, 15, 177-193. Heesom, D., & Mahdjoubi, L. (2004). Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), 171-182. Hegazy, T., & Abdel-Monem, M. (2012). Email-based system for documenting construction as-built details. Automation in Construction, 24, 130-137. Hu, Z., & Zhang, J. (2011). BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials. Automation in Construction, 20(2), 167-180. Irizarry, J., Karan, E.P., & Jalaei, F. (2013). Integrating BIM and GIS to improve the visual monitoring of construction supply chain management. Automation in Construction, 31, 241-254. Jung, Y., & Joo, M. (2011). Building information modelling (BIM) framework for practical implementation. Automation in Construction, 20(2), 126-133. Kang, L.S., Kim, S.K., Moon, H.S., & Kim, H.S. (2013). Development of a 4D object-based system for visualizing the risk information of construction projects. Automation in Construction, 31, 186-203. Kim, H., Anderson, K., Lee, S.H., & Hildreth, J. (2013). Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology. Automation in Construction, 35, 285-295. Kim, C., Kim, B., & Kim, H. (2013). 4D CAD model updating using image processing-based construction progress monitoring. Automation in Construction, 35, 44-52. Kim, C., Kim, H., Park, T., & Kim, M. (2011). Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project. Journal of Computing in Civil Engineering, 25(1), 98-107. Kim, C., Son, H., & Kim, C. (2013). Automated construction progress measurement using a 4D building information model and 3D data. Automation in Construction, 31, 75-82. Kim, K., & Teizer, J. (2014). Automatic design and planning of scaffolding systems using building information modeling. Advanced Engineering Informatics, 28(1), 66-80. Kivrak, S., Arslan, G., Dikmen, I., & Birgonul, M. (2008). Capturing Knowledge in Construction Projects: Knowledge Platform for Contractors. Journal of Management in Engineering, 24(2), 87-95. Leite, F., Akcamete, A., Akinci, B, & Atasoy, G. (2011). Analysis of modeling effort and impact of different levels of detail in building information models. Automation in Construction, 34, 25-36. Li, H., Chan, K. Y., & Skitmore, M. (2012). The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. Construction Innovation, 12(4), 429-446. Liston, K.M., Fischer, M., & Kunz, J. (1998). 4D annotator: a visual decision support tool for construction planners, computing in civil engineering. Proc. of International Computing Congress, 18-21 October, 1998, Boston, USA, 330-341. Lu, W., Huang, G.Q., & Li, H. (2011). Scenarios for applying RFID technology in construction project management. Automation in Construction, 20(2), 136-143. Ma, Z., Shen, Q., & Zhang, J. (2005). Application of 4D for dynamic site layout and management of construction projects. Automation in Construction, 14(3), 369-381. Manning, R., & Messner, J. (2008). Case studies in BIM implementation for programming of healthcare facilities. Journal of Information Technology in Construction (ITcon), 13, 446–457. Martins, J.P., & Monteiro, A. (2013). LicA: A BIM based automated code-checking application for water distribution systems. Automation in Construction, 29, 12-23. Matta, C., & Kam, C. (2010). The GSA'sBIM Pilot Program, presentation by GSA PBS Office of the Chief Architect (Last accessed 21 March, 2010). Retrieved from http://bim.arch.gatech.edu/data/reference/gsaBIM.pdf 20058. Moon, H.S., Dawood, N., & Kang, L.S. (2014). Development of workspace conflict visualization system using 4D object of work schedule. Advanced Engineering Informatics, 28(1), 50-65. Moon, H.S., Kim, H.S., Kim, C.H., & Kang, L.S. (2014). Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces. Automation in Construction, 39, 93-105. Motawa, I., & Almarshad, A. (2013). A knowledge-based BIM system for building maintenance. Automation in Construction, 29, 173-182. Navon, R. (2007). Research in automated measurement of project performance indicators. Automation in Construction, 16(2), 176-188. Park, C.S., Lee, D.Y., Kwon, O.S., & Wang, X. (2013). A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template. Automation in Construction, 33, 61-71. Porwal, A., & Hewage, K.N. (2013). Building Information Modeling (BIM) partnering framework for public construction projects. Automation in Construction, 31, 204-214. Redmond, A., Hore, A., Alshawi, M., & West, R. (2012). Exploring how information exchanges can be enhanced through Cloud BIM. Automation in Construction, 24, 175-183. Ren, Y., Skibniewski, M.J., & Jiang, S. (2012). Building information modeling integrated with electronic commerce material procurement and supplier performance management system. Journal of Civil Engineering and Management, 18(5), 642-654. Reuss, M.C., & Tatum, C.B. (1993). Requirements and Tools for Transferring Construction Experience between Projects. Tech. Rep. no.78, Stanford, CA, USA: Center for Integrated Facility Engineering, Stanford University. Ribeiro, F.L. (2009). Enhancing knowledge management in construction firms. Construction Innovation, 9(3), 268-284. Russell, A., Staub-French, S., Tran, N., & Wong, W. (2009). Visualizing high-rise building construction strategies using linear scheduling and 4D CAD. Automation in Construction, 18(2), 219-236. Shahi, A., West, J.S., & Haas, C.T. (2013). Onsite 3D marking for construction activity tracking. Automation in Construction, 30, 136-143. Shen, W., Shen, Q.W., & Sun, Q. (2012). Building Information Modeling-based user activity simulation and evaluation method for improving designer–user communications. Automation in Construction, 21, 148-160. Shen, W., Zhang, X., Shen, G.Q. & Fernando, T. (2013). The User Pre-Occupancy Evaluation Method in designer–client communication in early design stage: A case study. Automation in Construction, 32, 112-124. Shen, Z., & Issa, R. (2010). Quantitative evaluation of the BIM assisted construction detailed cost estimates. Journal of Information Technology in Construction (ITcon), 15, 234-257. Succar, B. (2009). Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction, 18(3), 357–375. Succar, B. (2013). An integrated approach to BIM competency assessment, acquisition and application. Automation in Construction, 35, 174-189. Tang, P., Huber, D., Akinci, B., Lipman, R., & Lytle, A. (2010). Automatic reconstruction of as-built building information models from laser-scanned point clouds: A review of related techniques. Automation in Construction, 19(7), 829-843. Taylor, J.E., & Bernstein, P.G. (2009). Paradigm Trajectories of Building Information Modeling Practice in Project Networks. Journal of Management in Engineering, 25(2), 69-76. Teicholz, P. (2013). BIM for Facility Managers. New York, NY, USA: John Wiley & Sons, Inc. Tiwana, A. (2000). The knowledge Management Toolkit – practical techniques for building a knowledge management system. Upper Saddle River, NJ, USA: Prentice-Hall. Trupp, T., Soibelman, L., Hashash, T.M.A., & Liu, L.Y. (2004). Novel technologies for construction field data collection. Proc. of the 10th International Conference on Computing in Civil and Building Engineering (ICCCBE), 2004, Weimar, Germany. 9 p. Tsai, M.H., Kang, S.C., & Hsieh, S.H. (2010). A three-stage framework for introducing a 4D tool in large consulting firms. Advanced Engineering Informatics, 24, 476-489. Tse, T.K., Wong, K.A., & Wong, K.F. (2005). The utilisation of building information models in nD modelling: A study of data interfacing and adoption barriers. Journal of Information Technology in Construction (ITcon), 10, 85-110. Turkan, Y., Bosche, F., Haas, C.T., & Haas, R. (2012). Automated progress tracking using 4D schedule and 3D sensing technologies. Automation in Construction, 22, 414-421. Underwood, J., & Isikdag, U. (2010). Handbook of research on building information modeling and construction informatics: concepts and technologies. IGI Global. Vanlande, R., Nicolle, C., & Cruz, C. (2008). IFC and building lifecycle management. Automation in Construction, 18(1), 70-78. Wang, Y., Wang, X., Wang, J., Yung, P., & Jun, G. (2013). Engagement of Facilities Management in Design Stage through BIM: Framework and a Case Study. Advances in Civil Engineering, 2013, Article ID 189105, 8 pages. Wang, W.C., Weng, S.W., Wang, S.H., & Chen, C.Y. (2014). Integrating building information models with construction process simulations for project scheduling support. Automation in Construction, 37, 68-80. Wang, H.J., Zhang, J.P., Chau, K.W., & Anson, M. (2004). 4D dynamic management for construction planning and resource utilization. Automation in Construction, 13(5), 575-589. Wix, J., & Liebich, T. (1998). Industry foundation classes: some business question examined. Proc. of 2nd ECPPM conference, 19-21 October, 1998, Watford, UK. Wong, A.D., Wong, F.W., & Nadeem, A. (2010). Attributes of Building Information Modelling Implementations in Various Countries. Architectural Engineering and Design Management, 6(4), 288-302. Xiong, X., Adan, A., Akinci, B., & Huber, D. (2013). Automatic creation of semantically rich 3D building models from laser scanner data. Automation in Construction, 31, 325-337. Zhang, J.P., Hu, Z.Z. (2011). BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies. Automation in Construction, 20(2), 155-166. Zhang, S., Teizer, J., Lee, J.K., Eastman, C.M., & Venugopal, M. (2013). Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules. Automation in Construction, 29, 183-195. Zhang, J., Yu, F., Li, D. & Hu, Z. (2014). Development and Implementation of an Industry Foundation Classes-Based Graphic Information Model for Virtual Construction. Computer-Aided Civil and Infrastructure Engineering, 29, 60-74. Zhou, Y., Ding, L.Y., & Chen, L.J. (2013). Application of 4D visualization technology for safety management in metro construction. Automation in Construction, 34, 25-36. | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/5428 | - |
dc.description.abstract | 工地管理一直都是營建管理成功重要關鍵因素之一,而在工地管理直接執行應用的知識管理(Knowledge Management)與進度管理(Schedule Management)是近年來在營建管理領域高度被探討的重要議題。目前知識管理與進度管理主要是以文字的模式作為資訊傳遞的方式,有時還是不易表達實際現場建物構件位置的進度與經驗知識,因此本研究利用建築資訊模型(Building Information Modeling, BIM)之視覺化效果特色建置3D BIM-based知識管理與BIM-based進度更新管理模式,有系統地彙整蒐集及管理工程在施工階段之知識分享與進度更新管理,以利提昇營建工地管理之效率與效益。利用BIM方法應用於BIM-based知識管理來彙整相關工程累積的知識與經驗,主要的好處在於能夠有效率地瞭解執行工程相關之知識資產,有效地彙整及管理工程專案的知識,同時應用BIM-based進度更新管理模式,能更有效地展現工程實際進度。營建工程未來應用3D BIM模式將成為工程專案執行控管之一種趨勢。本研究透過相關文獻收集分析及業界專家訪談,探討營建工程應用BIM-based知識管理與BIM-based進度更新管理模式之需求、模式及架構,建構出BIM模型管理模式、BIM-based知識管理模式與BIM-based進度管理模式之流程與機制,主要分成四個部分進行研究:(1)首先探討BIM-based知識管理與BIM-based進度更新管理之問題及需求;(2)提出BIM模型管理模式、BIM-based知識管理模式與BIM-based進度管理模式之流程與機制;(3)建置BIM-based知識管理與BIM-based進度更新管理雛型系統;(4)利用個案營造廠的實際工程應用BIM-based管理模式及系統,評估營建工程專案之知識管理與進度更新管理之成效及可能遭遇困難,提供未來營建工程工地管理之參考。 | zh_TW |
dc.description.provenance | Made available in DSpace on 2021-05-15T17:58:37Z (GMT). No. of bitstreams: 1 ntu-103-D94521007-1.pdf: 3218886 bytes, checksum: e16526c1af257699fd8c06127ca3b317 (MD5) Previous issue date: 2014 | en |
dc.description.tableofcontents | 口試委員會審定書 i
ACKNOWLEDGEMENT ii 摘要 iii ABSTRACT iv TABLE OF CONTENTS vi LIST OF FIGURES viii LIST OF TABLES x LIST OF ABBREVIATIONS xi 1. Introduction 1 1.1 Motivation and Background 1 1.2 Problem Statement 3 1.3 Research Objectives and Scope 4 2. Literature Review 6 2.1 Building Information Modeling 6 2.2 Current Research of BIM 10 2.3 Schedule Management in Construction 12 2.4 Knowledge Management in Construction 16 3. Model Development 18 3.1 BIM Model Management Model 19 3.2 BIM Schedule Management Model 22 3.3 BIM Knowledge Management Model 32 4. Prototype Development 41 4.1 Overview of ConBIM-SKM prototype 42 4.2 Prototype Modules for schedule management 44 4.3 Prototype Modules for knowledge management 47 5. Case Study 52 5.1 The Description of Case Study 52 5.2 Case Study for Schedule Management 53 5.3 Case Study for Knowledge Management 55 5.4 Evaluation 57 5.5 Barriers and Limitations 62 6. Conclusion and Future Research 66 6.1 Conclusion 66 6.2 Contributions 69 6.3 Future Research 71 REFERENCES 72 | |
dc.language.iso | en | |
dc.title | 建築資訊模型應用於營建工程知識與進度更新管理 | zh_TW |
dc.title | Applications of BIM Technologies in Knowledge and
Applications of BIM Technologies in Knowledge and As-built Schedule Management in Construction | en |
dc.type | Thesis | |
dc.date.schoolyear | 102-1 | |
dc.description.degree | 博士 | |
dc.contributor.oralexamcommittee | 陳柏翰,陳維東,陳鴻銘,林志棟 | |
dc.subject.keyword | 建築資訊模型,進度管理,知識管理,BIM模型管理, | zh_TW |
dc.subject.keyword | BIM,Building Information Modeling,Schedule Management,Knowledge Management,BIM Model Management, | en |
dc.relation.page | 83 | |
dc.rights.note | 同意授權(全球公開) | |
dc.date.accepted | 2014-02-14 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-103-1.pdf | 3.14 MB | Adobe PDF | 檢視/開啟 |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。