請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/4707
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 郭斯傑(Sy-Jye Guo) | |
dc.contributor.author | Shih-Sung Lin | en |
dc.contributor.author | 林石松 | zh_TW |
dc.date.accessioned | 2021-05-14T17:45:37Z | - |
dc.date.available | 2020-07-20 | |
dc.date.available | 2021-05-14T17:45:37Z | - |
dc.date.copyright | 2015-07-20 | |
dc.date.issued | 2015 | |
dc.date.submitted | 2015-07-08 | |
dc.identifier.citation | 1.王明德,「BIM於大學校園設施管理之應用」,簡報資料,2013。
2.江志雲,「BIM在台灣營建的應用」,建築技藝(中國大陸),第Z6期,2011。 3.吳貴彬、陳相如,「品質機能展開法於新產品發展之應用」,樹德科技大學學報,期刊論文,2004。 4.美國營建科學院,美國營建科學院月刊2013年12月號-BIM專刊,2013。 5.郭榮欽、謝尚賢,「 BIM概觀與國內推行策略」,土木水利工程學會會刊,第三十七卷,第五期,第8-20頁,2010。 6.陳昭惠、蘇瑞育、盧祥偉,「淺談BIM於營建工程分階段之實務推動與應用」,土木水利工程學會會刊,第三十七卷,第五期,第25-30頁,2010。 7.陳韋如,「建築資訊模型導向營造廠流程再造之研究」,國立台灣科技大學營建工程系碩士論文,2011。 8.陳清楠,中興社研究大樓 BIM Award得獎作品分享,簡報資料,2012。 9.張國儀、謝尚賢,「領導應用BIM 營造廠角色創新」,營建知訊,第375期,54-58頁,2014。 10.國立臺灣大學-土木工程學系,「臺大BIM Center成果報告」,2013 Q3 BIM趨勢論壇,2013。 11.國立臺灣大學-土木工程學系,「臺灣的BIM推動藍圖與策略」,2014 Q2 BIM趨勢論壇,2014。 12.黃志明,「工程顧問機構知識管理導向企業流程再造模式之研究」,國立台灣科技大學營建研究所碩士論文,2006。 13.達欣工程,「達欣 BIM 推動與執行辦法」,簡報資料,2013。 14.劉聰熙、謝定亞,「BIM世代的營建管理」,土木水利工程學會會刊,第三十七卷,第五期,第31-37頁,2010。 15.蔡明修,「營建業管理流程再造之研究」,國立台灣科技大學營建研究所碩士論文,1999。 16.賴佑陽,「營造業管理流程再造績效評估」,國立台灣科技大學營建研究所碩士論文,2000。 | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/4707 | - |
dc.description.abstract | 最近幾年建築資訊模型(Building Information Modeling,BIM)的技術發展與應用,在營建產業已形成一股不可忽視的趨勢,在許多歐美先進國家,BIM技術已成為同業競爭力的基本門檻。國內政府工程主管機關亦已開始著手推動或試行,甚至國內大型營造廠均已陸續導入BIM技術,然而在導入過程中仍有諸多困難,主要為初期導入成本只有大型顧問公司及營造廠可以負擔,無法普及至中小型顧問公司、營造廠及建築師事務所等,因此無法有效銜接從設計至施工的完整過程。即使有足夠成本導入BIM,仍有投資者成本投入的價值回饋壓力,其中最關鍵之處在於整個組織架構的調整及執行成效的價值回饋。
本研究依據國內營造廠導入BIM的實際案例,探討國內營造廠於導入BIM作業,實際執行時相關成本及可能遭遇的問題,經由文獻回顧、專家訪談與問卷調查分析,期望能找出解決辦法及後續建議發展方向,另透過問卷調查及矩陣分析探討營造廠導入BIM作業時,不同組織架構作業流程對工程實際執行成效之影響,並獲得各專案執行時,顧客對專案變更設計流程作業項目的滿意度。 本研究之成果,可為國內營造廠在初期導入BIM時,提供一個執行方向的參考,研究中除彙整各項導入BIM時所需的軟硬體設備、人員教育訓練及各專案執行BIM人員費用,亦透過實際訪談,統計營造廠導入BIM相對較大的困難與挑戰為「設計圖面資料不全造成多次檢核及修模作業」、「導入費用過高,預算編列困難」、「建模作業需要人力及時間且成效評估困難」等,及解決營造廠導入BIM困難的較好解決方案為「整合產業界之上、中、下游一同導入應用」、「政府應更積極的推廣BIM在營建業的應用與政策」、「提升人員專業訓練並累積各專案經驗」等。另本研究經調查分析,獲得不同組織架構作業流程於工程專案實際執行時,顧客對該專案變更設計流程作業項目執行的滿意度。 | zh_TW |
dc.description.abstract | The development and application of Building Information Modeling (BIM) has become an in-negligible trend in the construction industry in recent years. BIM has become a basic requirement for competition in the trade in many advanced countries in the European and American regions. The Agency-in-charge of construction projects within our country has already started initiating or even piloting BIM. Many large-scale construction companies within the country have also introduced BIM into their operation. Nevertheless, the process of introducing BIM into the trade has faced many challenges, mainly due to the high cost incurred for introducing BIM in the initial stage which is only affordable for large-scale consultants and construction companies, and the technology cannot be spreaded to small and medium-sized consultants, construction companies and architects offices. Hence BIM cannot be effectively utilized throughout the process from design to consutrction. Even in cases where sufficient resources were available for introducing BIM, companies still face pressure from retrieving the value of the resources invested. The key rests in the adjustment of the structure of the entire organization and the efficiency of impelementation.
This paper will explore the issues encountered by construction companies within our nation in implementing construction projects with BIM introduced. Through literature review, interview with experts and analysis of surveys, this paper hopes to explore possible solutions and propose directors for continual development. By conducting surveys and analysis on the actual effect on construction process by different workflows with BIM introduced, we would also get to know about the clients’ degree of satisfaction regarding the changed workflow in designing the projects. The research could be taken as reference by construction companies in designing implementation during the initial stage of introducing BIM. The research will not only take into account the soft and hardwares required in introducing BIM, costs for personnel training and specific professionals required, but also collect data concerning the challenges faced by construction companies regarding “incomplete information on design drafts which results in repeated review and revisions”, “difficulties in preparing budgets due to high cost of introducing BIM”, “difficulties in accounting manpower and time required during the construction process”, etc, and propose better solutions for construction companies attempting to introduce BIM. These include “integrated approach in introducing BIM from top to bottom”, “Government’s increased efforts in promoting BIM through its policy applied in the construction industry”, “enhancing the training of personnel and accumulation of experiences”. The research would also analyse the clients’ degree of satisfaction regarding the changed workflow in designing the projects. | en |
dc.description.provenance | Made available in DSpace on 2021-05-14T17:45:37Z (GMT). No. of bitstreams: 1 ntu-104-P01521706-1.pdf: 4439714 bytes, checksum: 6dfb2d8826b8c94b3d49c3f8fbbcb5b4 (MD5) Previous issue date: 2015 | en |
dc.description.tableofcontents | 口試委員會審定書 #
誌謝 i 中文摘要 ii ABSTRACT iii 目錄 v 圖目錄 viii 表目錄 ix 第一章 緒論 10 1.1 研究背景與動機 10 1.2 研究目的 11 1.3 研究範圍與限制 11 1.4 研究方法與流程 12 1.4.1 本研究主要研究方法 12 1.4.2 本研究主要研究流程 13 第二章 文獻回顧 15 2.1 營造業導入BIM的趨勢 15 2.2 BIM組織架構與執行流程 17 2.3 作業流程效益評估 20 2.3.1 確立流程目標要素 21 2.3.2 評估流程目標要素重要性 23 2.3.3 評估流程目標達成度 24 第三章 案例介紹 26 3.1 達欣工程導入BIM基本資料 26 3.1.1 導入BIM基本資料 27 3.1.2 導入BIM費用分析 28 3.2 案例一:頂禾園住宅新建工程 34 3.2.1 工程概要 34 3.2.2 BIM執行概要 35 3.2.3 BIM作業流程 35 3.2.4 變更設計作業流程 36 3.3 案例二:天藝住宅工程 38 3.3.1 工程概要 38 3.3.2 BIM執行概要 38 3.3.3 BIM作業流程 38 3.3.4 變更設計作業流程 39 3.4 案例三:富都新萬華住宅新建工程 41 3.4.1 工程概要 41 3.4.2 BIM執行概要 41 3.4.3 BIM作業流程 41 3.4.4 變更設計作業流程 43 3.5 案例四:一森原住宅新建工程 44 3.5.1 工程概要 44 3.5.2 BIM執行概要 44 3.5.3 BIM作業流程 44 3.5.4 變更設計作業流程 44 第四章 專家訪談及問卷調查 45 4.1 問卷調查與訪談名單 45 4.2 顧客要求項目與執行BIM困難調查及訪談 47 4.2.1 問卷調查及訪談內容 47 4.2.2 確認顧客對流程的要求項目及相對重要度 48 4.2.3 建立要求項目的目標要素展開表 49 4.2.4 訪談內容彙整分析 50 4.3 各專案執行時顧客相對滿意度調查 53 4.3.1 各專案執行時顧客相對滿意度調查內容 53 4.3.2 流程目標要素對顧客要求的相對重要性分析 53 4.3.3 各專案流程目標要素對變更流程作業項目的顧客滿意度得分 54 第五章 結論與建議 60 5.1 結論 60 5.2 後續研究建議 61 參考文獻 62 附錄 63 | |
dc.language.iso | zh-TW | |
dc.title | 營造廠導入BIM組織架構作業流程對執行成效影響之研究 | zh_TW |
dc.title | Performance Impacts of BIM application on organization structure and process flow chart for contractors | en |
dc.type | Thesis | |
dc.date.schoolyear | 103-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 黃榮堯(Rong-Yau Ethan Huang),陳博亮(Borliang Chen),謝孟勳(Machine Hsie) | |
dc.subject.keyword | 建築資訊模型,營造廠,組織架構,作業流程,成本分析, | zh_TW |
dc.subject.keyword | BIM,construction companies,organizational structure,workflow,cost analysis, | en |
dc.relation.page | 76 | |
dc.rights.note | 同意授權(全球公開) | |
dc.date.accepted | 2015-07-08 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-104-1.pdf | 4.34 MB | Adobe PDF | 檢視/開啟 |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。