請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/46677
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 郭斯傑(Sy-Jye Guo) | |
dc.contributor.author | Pei-Yun Hsu | en |
dc.contributor.author | 徐沛澐 | zh_TW |
dc.date.accessioned | 2021-06-15T05:22:40Z | - |
dc.date.available | 2012-01-01 | |
dc.date.copyright | 2010-07-27 | |
dc.date.issued | 2010 | |
dc.date.submitted | 2010-07-19 | |
dc.identifier.citation | 參考文獻
1. 石進芳,「先進競標法A+B+I/D」,營建施工與管理,土木技術,第4 卷,第5 期,第93-97 頁,2001。 2. 江端詳,「捷運工程外部管線遷移社會成本之研究-以台北捷運工程為例」,碩士論文,中華大學營建管理研究所,2008。 3. 林坤宏,「公共工程標比分析之研究-以公路工程為例」,碩士論文,私立逢甲大學土木工程所,2005。 4. 邱裕鈞,「公路工程採購訂定底價與決標價間差距之研析」,碩士論文,逢甲大學交通工程與管理學系,2007。 5. 邱仲賜,「公路工程採購訂定底價與決標價間差距之研析」,碩士論文,私立逢甲大學交通工程與管理所,2005。 6. 許志義,1995,多目標決策,五南圖書出版有限公司。 7. 陳信瑞,「政府採購法各種決標方式執行情形之分析」,碩士論文,國立台灣大學土木工程系,2008。 8. 陳維東、陳晉堂、何晉禛,「應用線性規劃技術解析造價工期決標模式之造價與工期之最佳化」,營建管理季刊,第46 期,2001。 9. 陳晉堂,「以效用函數理論探討造價工期競標法之競標策略」,碩士論文,雲林科技大學營建工程,雲林,第15 頁,2001。 10. 陳維東,「從業主角度探討造價與工期競標法之施行策略」,行政院國家科學委員會專題研究報告,1998。 11. 陳維東,「從工期設定探討最低標的改善」,現代營建,第185 期,1997。 12. 陳維東,「台灣地區施行造價與工期並重競標法之研究」,行政院國家科學委員會專題研究報告,1996。 13. 陳順宇,2009,迴歸分析,三民書局。 14. 張吳清俊,「工程決標應用最佳化理論模式之研究」,碩士論文,國立中央大學土木工程研究所,2004。 15. 張正瑩,「公共工程施工期間社會成本量化分析之實證研究-以北部地區道路鋪面工程為例」,碩士論文,中華大學營建管理研究所,2003。 16. 張建益、李錫霖,「低價搶標對工程品質影響與因應對策之研討」,臺灣公路工程,第29卷,第2期,第19-30頁,2002。 17. 張正德,複因子決標模式之建構-以橋樑工程為例,碩士論文,國立雲林科技大學營建工程系研究所,雲林,2000。 18. 翁愷翔,「橋梁維修與整建效益評估之比較研究」,碩士論文,國中央大學營建管理研究所,2009。 19. 翁明全,「震後橋梁補強方案經濟效益評估模式之研究」,國立臺灣科技大學營建工程系碩士論文,2005。 20. 廖芳瑜,「造價與工期競標法(A+B)應用於郵局整新建工程之可行性研究」,碩士論文,中華大學營建管理研究所,2007。 21. 劉國鋒,「公共工程採最低價決標之合理底價訂定模式之研究」,碩士論文,立德管理學院資源環境研究所,2006。 22. 劉志遠,「公共工程進度計算方式之認定研究」,碩士論文,國立中央大學土木工程研究所,2005。 23. 賴鈺倩,「系統性橋梁維修評選之研究」,國立中央大學土木工程學系碩士論文,2001。 24. 盧威宇,「最有價值標決標制度之研擬」,碩士論文,義守大學土木與生態工程學系,2007。 25. 虞順逸,「以迴歸分析預測最低標之研究-以美國A+B 競標法及我國道路工程為例」,碩士論文,雲林科技大學營建工程,2002。 26. 羅紹松,「道路工程施工期間社會成本之研究」,碩士論文,中華大學營建管理研究所,2002。 27. 蘇振雄,「都市地區影響交通之重大工程施工規劃研究」,碩士論文,國立交通大學交通運輸工程研究所,新竹,1990。 28. 中華顧問工程司,「老舊橋梁整建計畫可行性研究」,交通部公路總局, 2007。 29. 交通部運輸研究所, 「交通建設計畫經濟效益評估作業之研究」 ,2008 30. 交通部運輸研究所http://www.iot.gov.tw 31. 交通部公路總局 http://www.thb.gov.tw/tm/wcf.aspx 32. 行政院經濟建設委員會,「公共建設計畫經濟效益評估及財務計畫作業手冊」 ,2008。 33. 行政院公共工程委員會,「政府採購法令彙編」,2007。 34. 行政院公共工程委員會,行政院第2983次會議「最有利標決標機制之檢討改進措施報告」簡報資料,2007。 35. 行政院主計處 http://www.dgbas.gov.tw/mp.asp?mp=1 36. 行政院環境保護署 http://www.epa.gov.tw/ 37. 美國聯邦公路總局http://www.fhwa.dot.gov/ 38. Logical Decision多目標決策分析研討會,「多目標決策分析研討與應用要點」,2006。 39. David L. Kent P.E. , “Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding, ” New York State Department of Transportation,2003. 40. Herbsman, Z.J. and Ellis, R.D., 1992, “Multiparameter Bidding System-Innovation in Contract dministration,” ASCE Journal of Construction Engineering and Management, Vol. 118, No. 2, pp. 142-150. 41. Sidney Scott III, Keith R. Molenaar, Douglas D. Gransberg, Nancy C. Smith (2006) “Best-Value Procurement Methods for Highway Construction Projects”, NCHRP Report 561, Transportation Research Board of The National Academies, U.S.A. 42. Shr J. F. and Chen W. T., “A Method to Determine Minimum Contract Bids for Incentive Highway Projects,” International Journal of Project Management, ASCE, Vol.21, No.1, pp.601-615, 2004. 43. Shr J.F., Ran,B and Sung C. W., “ Method to Determine Minimum Contract Bids for A+B+I/D Highway Projects,” Journal of Construction Engineer and Management ASCE, 2004. 44. Shen, L, Drew, D., Zhang, Z. (1999), “Optimal Bid Model for Price-Time Biparameter Construction Contracts,“ ASCE Journal of Construction Engineering and Management, Vol. 125, No. 3, pp.204-209. 45. The Highways Agency (2001), “Model Contract Document forEngineering and ConstructionContract - England”, Manual Of Contract Documents For Highway Works, U.K | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/46677 | - |
dc.description.abstract | 長期以來,政府之各項採購多以最低價標為主要之決標考量,道路工程也不例外。然而,由採購經驗中發現,最低價標並無法與最優質標劃上等號;廠商只要投標價格符合招標規定的得標條件,即取得該工程承攬施作權,這種以單一價格決標之招標制度似乎過於簡化,反映不出廠商之間程度上差異,無法激勵廠商注重施工進度及品質以爭取優良績效,讓優良廠商有較高的得標機會。
隨著國人所得及生活水準的提升,道路於施工期間所造成的交通延遲、用路人旅行時間增加、空氣噪音等環境污染加劇等問題,已成為用路人最主要的訴求。是故,如何有效的縮短道路工程施工時程,節省用路人旅行時間及行車成本,進而降低社會成本增加公共建設效益,乃今日國內交通建設工程施作考量的重要課題。 本研究由美國聯邦公路局網站蒐集採用A+B競標法共62筆案例,除了用統計分析探討62筆案例的預估造價、決標價、用路人成本與工期縮減率等數據分布趨勢,並就其決標影響因子以線性迴歸建立相關性分析模型;另將部分不符合國內決標制度案例予以剔除,以國內適用範圍內之34筆案例進行敘述性統計分析及線性迴歸決標因子相關性分析檢定,作為國內公共工程標案預測依據之模型。 利用蒐集國內橋梁整建案例相關決標及用路人成本估算資料,參考行政院經建會等單位之效益評估項目估算用路人成本,其中包含用路人因施工所增加的旅行時間成本、施工改道或行駛替代道路所衍生的繞行成本、因旅行時間增加或繞行距離增加所衍生的行車成本、因施工造成交通意外事故所衍生的肇事成本及環境衝擊等具體可直接量化經濟成本,而商業衝擊損失的間接成本則不在本研究考量之列。 最後,以國外案例模型探討該等案例執行情形及適用性評估,並參酌工程主管機關、業主、工程顧問及廠商代表就現階段公共工程發包採購之意見,針對國內現行政府採購制度及採購環境現況,提供國內採行A+B競標法之可行性及未來推展方向。 | zh_TW |
dc.description.abstract | Government procurements usually take the lowest bid to determine the bid winner, and road engineering is not an exception. However, experience shows that the lowest bid does not equal one with the best quality. A bidder can easily get the contract as long as the price matches well with the threshold. It seems that the bidding system is over simplified when it is only based on a single price.
While income and the standard of living are upgraded, road users begin to ask for better quality of transportation. Therefore, it has become a crucial question as how to shorten construction and travel time, decrease vehicle operation and social costs, and enlarge the efficiency of public construction. This paper analyzed the 62 cases of cost-time bidding listed on Federal Highway Administration (FHWA). Statistical and data analyses were done for their project costs, prices of award, costs on road users, and reduction rates of construction time. Linear regression was also applied to build analytical models of correlations. Therefore, 34 out of the 62 cases are categorized as inapplicable according to Taiwan’s bidding system, were given descriptive statistical analyses, and linear regression was performed to examine the correlations of factors that determined successful bids. This paper collected data of national bridge renovation projects, road-user cost, benefit and road-user cost evaluated by Council for Economic Planning and Development(CEPD) and other institutions. Daily traveler’s time value, daily detouring costs, daily vehicle traveling cost, casualty cost, and impact on the environment were taken into consideration as they were quantifiable economic costs. Indirect costs such as losses and impact on business were not of the concern of this research. The estimated road-user cost was then used in the applicability evaluation based on the biddings of the 34 cases in the U.S. Opinions of competent authorities, owners, project consultants, and business representatives were also incorporated to comment on the contracting and procurement of Taiwan’s public construction projects. The research aimed to provide a vision on applying A+B bidding method in Taiwan and its possible development in the future. | en |
dc.description.provenance | Made available in DSpace on 2021-06-15T05:22:40Z (GMT). No. of bitstreams: 1 ntu-99-P96521715-1.pdf: 6399798 bytes, checksum: c1f68d75eb52c04ce875601092a772e1 (MD5) Previous issue date: 2010 | en |
dc.description.tableofcontents | 口試委員會審定書 i
誌謝 ii 中文摘要 iii Abstract iv 第一章 緒論 1 1.1 研究動機 1 1.2 研究方法與目的 2 1.3 研究範圍 2 1.4 研究限制 3 1.5 研究流程 3 第二章 文獻回顧 5 2.1 最佳價值採購 5 2.1.1 美國最佳價值採購 5 2.1.2 英國最佳價值採購 13 2.2 複因子決標制度 16 2.2.1 造價工期競標法( A + B 競標法) 17 2.2.2 造價工期獎懲措施混合競標法 17 2.2.3 道路租借競標法 17 2.2.4 造價工期品質競標法 18 2.2.5 整合效益最低標 19 2.2.6 國內相關案例 19 2.2.7 小結 22 2.3 造價工期(A+B)競標法 23 2.3.1 簡介 23 2.3.2最佳造價工期模型 24 2.3.3 適用工程 24 2.3.4 實施成效 24 2.3.5 A+B競標法的利弊 26 2.4 各種採購決標方式之比較 27 2.4.1國內現行之決標方式 27 2.4.2 複因子決標模式之比較 27 第三章 造價工期(A+B)競標法案例分析 29 3.1美國A+B決標案例 29 3.1.1 62筆案例分析 29 3.1.2 符合最低標且具縮減工期之案例分析 34 3.2決標因子相關性分析 39 3.2.1 迴歸分析與假設檢定 39 3.2.2 決標因子相關性模型 40 3.3 小結 48 3.3.1 決標案例分析 48 3.3.2 決標因子相關性分析 48 第四章 案例與現況探討 49 4.1 案例資料 49 4.2 用路人成本 50 4.2.1 旅行時間成本 (Daliy Traveler’s Time Value) 51 4.2.2 車輛繞行成本 (Daliy Detouring Cost) 54 4.2.3車行成本 (Daliy Vehicle Traveling Cost) 55 4.2.4 肇事成本 56 4.2.5 環境成本 56 4.2.6 小結 62 4.3 案例模擬 62 4.3.1決標價與決標工期 63 4.3.2用路人成本與預算金額 64 4.3.3工期效益組合 65 4.4 現況探討 69 4.4.1專家訪談 69 4.4.2 廠商意見調查 72 第五章 結論與建議 73 5.1結論 73 5.2建議 75 參考文獻 76 附錄一 國內橋梁整建工程案例用路人成本資料 80 附錄二 決標因子模型迴歸及變異數分析摘要表 87 | |
dc.language.iso | zh-TW | |
dc.title | 造價工期競標法應用於橋梁整建工程適用性之探討 | zh_TW |
dc.title | The Study of Cost-Time Bidding for Bridge Renovations Projects | en |
dc.type | Thesis | |
dc.date.schoolyear | 98-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 黃榮堯,陳博亮,謝孟勳 | |
dc.subject.keyword | 造價工期競標法,用路人成本,A+B競標,橋梁工程,政府採購, | zh_TW |
dc.subject.keyword | cost-time bidding method,daily road-user cost,A+B bidding,bridge renovation project,government procurement, | en |
dc.relation.page | 100 | |
dc.rights.note | 有償授權 | |
dc.date.accepted | 2010-07-19 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-99-1.pdf 目前未授權公開取用 | 6.25 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。