請用此 Handle URI 來引用此文件: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/43033
完整後設資料紀錄
DC 欄位值語言
dc.contributor.advisor曾惠斌
dc.contributor.authorYu-Fan Liuen
dc.contributor.author劉祐帆zh_TW
dc.date.accessioned2021-06-15T01:33:44Z-
dc.date.available2014-07-29
dc.date.copyright2009-07-29
dc.date.issued2009
dc.date.submitted2009-07-18
dc.identifier.citation一、 外文部分
[1] Duncan, W. R. (2004). “A Guide to the Project Managemet Body of Knowledge”, Project Management Institute, Inc.
[2] Eskesen, S. D., P. Tengborg, et al. (2004). “Guidelines for tunnelling risk management”. I. T. Association.
[3] Jannadi, O. A. and S. Almishari (2003). “Risk Assessment in Construction.' Journal of Construction Engineering and Management” 129(5): 492-500.
[4] NewZealand (2004). “Risk Management Process Manual”. T. N. Zealand.
二、 中文部分
[1] 中國土木工程學會 and 同濟大學 (民國九十五年). 地鐵及地下工程建設風險管理指南. 中國人民共和國建設部品質司.
[2] 中興工程顧問股份有限公司 (民國九十七年). 台鐵捷運化高雄市區鐵路地下化計畫總顧問服務工作-風險管理執行計畫書.
[3] 中興工程顧問股份有限公司 (民國九十四年). 中正國際機場聯外捷運系統建設計畫第一期總顧問服務-風險管理計畫.
[4] 中興工程顧問股份有限公司 (民國九十四年). 台北都會區大眾捷運系統新莊線計畫DK194標CK570C區段標-期終設計綜合報告.
[5] 中興工程顧問股份有限公司 (民國九十年). 台北都會區大眾捷運系統新莊線計畫DK194標-針對DK194標施工風險較大事項因應及處理方式報告.
[6] 台灣世曦工程顧問股份有限公司 (民國九十五年). 中正國際機場聯外捷運系統三重至台北段DA115設計標-高危險工項風險評估報告.
[7] 朱以帆 (民國九十五年). 價值工程文件管理系統分析與實作—以台北市捷運工程為例, 國立台灣大學. 碩士.
[8] 行政院研究發展考核委員會 (民國九十五年). 風險管理手冊. 行政院.
[9] 杜辰生 (民國八十二年). '工程統保制度之探討.' 保險專刊.
[10] 李孟學 (民國九十二年). 營建企業資源規劃導入分析方法之建構與研究, 國立台灣大學. 碩士論文.
[11] 亞新顧問股份有限公司 and 泰興工程顧問股份有限公司 (民國九十四年). 臺北都會區大眾捷運系統松山線DG166 設計標細部設計服務工作-捷運工程高危險工項風險評估與管控計畫.
[12] 范偉華 (民國九十三年). 統包工程之風險管理. 建築及都市設計學研究所, 朝陽科技大學. 碩士論文.
[13] 原振圖 (民國九十六年). 高架捷運工程施工風險探討. 營建工程系, 高雄第一科技大學. 碩士論文.
[14] 陳威元 (民國九十六年). 建築工程專案風險評估模式之研究. 土木工程學系, 國立台灣大學. 碩士論文.
[15] 陳偉珂, 黃艷敏, et al. (民國九十八年). 工程風險與工程保險, 天津大學.
[16] 臺北市政府捷運工程局南區工程處 (民國九十六年). 臺北市政府捷運工程局南區工程處災害防救業務執行計畫, 臺北市政府捷運工程局.
[17] 鄭燦堂 (民國九十六年). 風險管理理論與實務, 五南出版社.
[18] 蘇宏正 (民國九十三年). 營建知識管理導入模式及流程之研究-以營建知識社群為例, 國立台灣大學. 碩士論文.
dc.identifier.urihttp://tdr.lib.ntu.edu.tw/jspui/handle/123456789/43033-
dc.description.abstract公共工程建設對於國家各方面影響十分重大,近年來捷運工程發展快速,自民國七十七年底木柵線動工以來,陸續已有八條路線完工、多條路線持續施工中,從路線規劃初期一直到施工結束的工程風險相關資料可說是極為豐富。捷運工程規模龐大且可能遇到各種情況,因此工程施作過程必然會遇到風險,其中尤以地下段之風險最高。由於現今各廠商之風險管理模式不盡相同,本研究利用PMI(Project Management Institute)專案管理模式中之風險管理及ITA(International Tunnelling Association)所採用之隧道工程風險管理模式為基礎,並參考國內過去的施工資料統整現行業界對於捷運工程規劃、設計、施工階段採行之風險管理方式,歸納建立出一適合國內公共工程專案全面性風險管理流程,提供未來捷運工程參與人員在風險管理方面可以較為順利,減少工程災害發生。
由文獻回顧比較過內外相關風險管理使用之流程,並彙整近十年捷運工程從規劃、設計到施工三階段的案例資料,分析標案之高風險工項、風險事件、因素及解決方案。經由專家訪談歸納建立風險管理初步流程,並採用IDEF0(Integration Definition for Function Modeling)之方法做對各作業項目之輸入、控制、輸出以及機能項目做整體性的功能分析進而建立公共工程專案全生命周期之風險管理詳細流程,詳述各作業程序之需求。最後以此為基礎並進行資料庫系統之初步規劃,作為未來資訊系統建立之基礎,未來若是建立風險管理資訊系統,則可將過去只能採用紙本保存的書面資料,利用網際網路的便利性,讓使用者能夠線上建立且查詢資料,以提高資訊的流通性,改善以往以紙本保存時期,工程專案之風險管理經驗較不易為其他標案參考之缺點,且希望能藉由將來工程專案風險資料的累積,增加未來在風險評估的正確性。
zh_TW
dc.description.abstractMRT construction has been continuously developed during recent decades. Since the first construction of Green Line in the end of 1988, there was 8 different MRT Lines been completed and many Lines are now under constructing. The long history of MRT has accumulated a huge mass of construction risk management document of total life cycle.
Because of the magnitude of MRT construction, it is inevitable confronting risk under many circumstances in constructing stage. And the most serious risk event usually could be discovered in the underground site. Current risk management process are quite varied using by contractors, this research combined the Risk Management in PMI (Project Management Institute) and Risk Management Process for Tunnel construction in ITA (International Tunneling Association) to develop an appropriate Risk Management Process which consist of history data for infrastructure in Taiwan. The aim of the Process is to establish a successful risk management tool for MRT construction manager and further decrease the amount of site disaster.
The research compared several risk management process through literature review and gathered case data for planning, design and construction of MRT construction within 10 years to analyze higher risk unit, risk event, risk factor and risk solution in bidding case.
The basic outline of risk management process was formed according to the interview with professional. The detailed life-cycle risk management process for infrastructure project was constructed follow the principle of IDEF0 which includes functional analysis of input, control, output and function for each operational item. As a result, the information database system will be established under the above planning procedure.
Users can instantly create and search for the information that only could be preserved within paper work in the past by risk management information system built on the internet. Also the information system can improve the lack of sharing experience of construction project risk management with other bidding project in the past. By accumulating information of construction project risk management, it is possible to enhance the accuracy of risk assessment in the coming future.
en
dc.description.provenanceMade available in DSpace on 2021-06-15T01:33:44Z (GMT). No. of bitstreams: 1
ntu-98-R96521713-1.pdf: 2555383 bytes, checksum: b9fdd8ba387b6003eb969c0c875685ff (MD5)
Previous issue date: 2009
en
dc.description.tableofcontents第一章 緒論 1
1.1 研究動機 1
1.2 研究目的 2
1.3 研究方法 2
1.4 研究限制與範圍 3
1.5 預期研究成果 3
1.6 研究流程 4
1.7 小結 5
第二章 文獻回顧 6
2.1 風險管理 6
2.1.1 風險管理之意義 6
2.1.2 風險管理之流程 6
2.2 工程專案風險 8
2.2.1 工程專案風險之意義 9
2.2.2 工程風險種類 9
2.3 IDEF0流程模式化方法概述 15
2.3.1 IDEF0方法簡介 15
2.3.2 IDEF0語法及其組成 16
2.4 小結 19
第三章 工程專案風險管理流程之建立 20
3.1 工程風險管理之現況分析 20
3.1.1 國外相關標準與規範 20
3.1.2 捷運系統簡介 24
3.1.3 國內過去案例研究 25
3.1.4 現行工程專案風險管理闡述 31
3.2 工程專案風險管理流程建立 32
3.2.1 規劃階段風險管理流程 33
3.2.2 設計階段風險管理流程 35
3.2.3 施工階段風險管理流程 37
3.3 規劃設計施工時期單位風險管理執行項目 39
3.4 風險管理流程之改善 41
3.5 小結 41
第四章 以IDEF0分析捷運工程風險管理流程 42
4.1 建立捷運工程風險管理流程之IDEF0分析模型 42
4.1.1 模型編碼 43
4.1.2 A1作業程序:規劃階段風險管理 47
4.1.3 A2作業程序:設計階段風險管理 55
4.1.4 A3作業程序:施工階段風險管理 66
4.2 小結 77
第五章 風險管理資訊系統規劃 78
5.1 資料庫設計 78
5.1.1 資料庫設計流程 78
5.1.2 實體關係模型 79
5.2 系統使用者需求規劃 82
5.3 捷運工程案例導入 84
5.3.1 捷運工程案例簡介 84
5.3.2 捷運工程規劃階段風險管理 84
5.3.3 捷運工程設計階段風險管理 89
5.3.4 捷運工程施工階段風險管理 94
5.4 小結 98
第六章 結論與建議 99
6.1 結論 99
6.2 後續建議 100
參考文獻 101
dc.language.isozh-TW
dc.subjectIDEF0zh_TW
dc.subject工程專案zh_TW
dc.subject捷運工程zh_TW
dc.subject風險zh_TW
dc.subject管理流程zh_TW
dc.subjectConstruction Projecten
dc.subjectIDEF0en
dc.subjectRisk Management Processen
dc.subjectMRT Constructionen
dc.title公共工程專案風險管理系統之研究-以捷運工程為例zh_TW
dc.titleResearch on Infrastructure Project Risk Management System - Example of MRT Construction Projecten
dc.typeThesis
dc.date.schoolyear97-2
dc.description.degree碩士
dc.contributor.oralexamcommittee高宗正,張荻薇,陳鴻銘
dc.subject.keyword工程專案,捷運工程,風險,管理流程,IDEF0,zh_TW
dc.subject.keywordConstruction Project,MRT Construction,Risk Management Process,IDEF0,en
dc.relation.page102
dc.rights.note有償授權
dc.date.accepted2009-07-20
dc.contributor.author-college工學院zh_TW
dc.contributor.author-dept土木工程學研究所zh_TW
顯示於系所單位:土木工程學系

文件中的檔案:
檔案 大小格式 
ntu-98-1.pdf
  未授權公開取用
2.5 MBAdobe PDF
顯示文件簡單紀錄


系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved