Skip navigation

DSpace JSPUI

DSpace preserves and enables easy and open access to all types of digital content including text, images, moving images, mpegs and data sets

Learn More
DSpace logo
English
中文
  • Browse
    • Communities
      & Collections
    • Publication Year
    • Author
    • Title
    • Subject
    • Advisor
  • Search TDR
  • Rights Q&A
    • My Page
    • Receive email
      updates
    • Edit Profile
  1. NTU Theses and Dissertations Repository
  2. 工學院
  3. 土木工程學系
Please use this identifier to cite or link to this item: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/39547
Title: Hanoi 捷運 工程施工階段 承建商 風險管理之探討
Risk Management for the Hanoi Metro Project
in Construction Stage - The Contractor’s Perspective
Authors: Pham Tuyen
範宣
Advisor: 郭斯傑(Sy-Jye Guo)
Keyword: 風險管理; 河內地鐵項目; 施工階段; 承包商的視角
Risk management; Risk response strategies; Hanoi metro project; Construction stage; Contractor’s perspective
Publication Year : 2011
Degree: 碩士
Abstract: 该论文提出了对风险的承包商在施工阶段对建设河内地铁项目风险管理实践的角度评估研究的细节。通过对风险的后果,风险频率和专家在河内地铁项目的讨论重点,这一论断表明良好的风险承包商的应对策略。
为了达到研究目的,研究者进行了文献综述的主体,明确重要的风险参数和分类相关的施工风险,设计相关的后果和对河内地铁项目的这些风险的频率下了问卷。调查问卷分发给35从教授,施工经理专家,地质专家,业主,承包商在越南的受访者。
从35收到的答复因素,分析,归纳和专家的讨论。结果分析表明,高风险,中等风险和河内地铁施工阶段承包商的低风险。风险应对策略计划,提出高风险和中等风险和短期风险应对策略计划创建的细节。通过建立风险应对策略,河内地铁承包商有效果的工具,面对在这个项目的风险。
The thesis presents the details of a study on the assessment of risks management practice of construction stage contractors perspective in Hanoi metro project toward construction risks. By focusing on risk consequence, risk frequency and expert discussion in Hanoi metro project, this thesis suggests good risk response strategy for contractor.
To achieve the study objectives the researcher conducted a literature review of the subject, defined important risk parameters and categorized related to construction risks, designed a questionnaire related to consequence and frequence of these risks on Hanoi metro projects. The questionnaire was distributed to thirty five respondents from the professors, construction manager experts, geological experts, the owners, the contractors in Vietnam.
Responses from thirty five factors were received, analyzed, summarized and expert discussion. Analysis of the results indicated that high risks, medium risks and low risks of Hanoi metro contractors in construction stage. The risk response strategy plan is presented detail with high risks and medium risk and the short risk respond strategy plan is created. By creating the risk response strategy, the Hanoi metro contractor have the effect tool to face with the risk in this project.
URI: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/39547
Fulltext Rights: 有償授權
Appears in Collections:土木工程學系

Files in This Item:
File SizeFormat 
ntu-100-1.pdf
  Restricted Access
4.95 MBAdobe PDF
Show full item record


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved