請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/38175完整後設資料紀錄
| DC 欄位 | 值 | 語言 |
|---|---|---|
| dc.contributor.advisor | 蔡揚宗 | |
| dc.contributor.author | Artis Chang | en |
| dc.contributor.author | 張聿昀 | zh_TW |
| dc.date.accessioned | 2021-06-13T16:27:27Z | - |
| dc.date.available | 2005-07-27 | |
| dc.date.copyright | 2005-07-27 | |
| dc.date.issued | 2005 | |
| dc.date.submitted | 2005-07-14 | |
| dc.identifier.citation | 參考文獻
1. 公共工程委員會,94年度「公共工程經費電腦估價系統(簡稱PCCES)檢討、更新及推廣」計畫RFP,民94(p1) 2. 中華專案管理學會,『專案管理知識體系指南』中文版,民92.10(p1,p8,p128,p136,p138) 3. 宋明哲,現代風險管理,五南圖書出版股份有限公司,民93.10,(P9) 4. 范淼,計畫風險事件之處置--分析模型之建立與應用,台大商研博論,民88 5. 林金波,風險管理應用在專案成本管理之研究,國立台灣科技大學碩論,民92 6. 周慧瑜,營建工程專案承包商風險處置決策模式之研究,台大土木博論,民91.6 7. 黃承傑,專案進度風險分析模式-考慮不確定性作業之影響,國立高雄第一科技大學碩論,民92 8. 黃慶隆,公共工程風險管理系統架構及實例,國立台灣科技大學碩論,民82 9. 萬幼筠,管理雜誌三六九期,”企業風險地圖”,哈佛企管管理顧問(股)公司, 94.3 10. 董雲馨,風險管理系統建構之研究,國立台灣科技大學碩論,民91 11. 張權溢,風險評估模式建構之研究,國立台灣科技大學碩論,民91 12. 鄭燦堂,風險管理理論與實務,五南圖書出版股份有限公司,民93.10 13. 廖偉全,營建工程風險確認分析模式-以隧道擠壓變形潛能為例,國立成功大學碩論,民91 14. 葉益成,管理雜誌三六九期,”企業風險壓力測試實戰”,哈佛企管管理顧問(股)公司, 民94.3 15. Pennsylvania Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK Guide), Inc., 2004(P241) 16. Brian Mair, Presentation of APAC WelcomPortfolio Mar 2005 17. Dan Patterson, A Welcom White Paper, 2004.4(P5) 18. James Lam , Enterprise Risk Management , John Wiley and Sons, Inc., 2003(p44~p45) 19. WST Corporation. ,Open Plan User’s Guide, 2003.9 20. WST Corporation. ,WelcomRisk Playbook, 2004.4 21. WST Corporation. ,Welcom Project Suite Installation Guide, 2005(P1) 22. NASA, ENTERPRISE PROJECT MANAGEMENT TOOL ANALYSIS WHITE PAPER,2002.9(P14,P31~33) | |
| dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/38175 | - |
| dc.description.abstract | 公司管理分策略管理、經營管理及風險管理3大領域(宋明哲,民93.10),直指公司管理精髓所在,亦充份說明風險管理之重要性及提供CEO逐年達成公司短、中、長期目標之聚焦重點。
風險管理強調管理程序循環,即一.風險辨識、二.風險評估、三.風險處置、四.風險監控,其中風險評估採定性分析及定量分析並行,以掌握風險發生之Probability及Severity/Impact,即風險矩陣(Risk Matrix),並藉矩陣中2軸乘積之風險評分(Risk Score)以下決策採風險轉移(Risk Transfer)、風險廻避(Risk Avoidance)、風險減輕(Risk Mitigation)或風險承擔(Risk Retention)其中一種風險處置策略,並監控執行過程且不斷回饋修正以確保風險依規劃納入掌控。 經以實際案例導入資訊系統應用後成功驗證上述理論與流程,且採風險減輕策略並訂定減輕步驟,追蹤監控後確實令風險由最嚴重的紅燈逐步降低至可接受範圍的綠燈,值此國內企業對風險管理需求殷切之際,本研究成果提供風險管理之實務方法,以掌控專案執行過程中之不確定因素並於預期之進度、成本、品質下達成專案目標。 | zh_TW |
| dc.description.abstract | Enterprise management comprise 3 segments as strategy management, operation management and risk management(Ming-Che Sung, 2004), point out the highest guide for enterprise management and lead CEO focus on do the right things then do the things right and control the uncertainty to fulfill the goals of the company.
Risk management emphasizes the management process, which are risk identification, risk assessment, risk response and risk monitoring and control, while assessment using qualitative analysis and quantitative analysis to figure out the probability and severity/impact of the risk, known as risk matrix, according to the risk score in the risk matrix of each risk impact type to adopt one of the response strategy as risk transfer, risk avoidance, risk mitigation or risk retention, then make decision for responding, then monitoring and control the execute process and feed back to modify the process steps to make sure the risk events are under controlled as the risk plan. After implementing a real case using risk managing software, in this case we take the mitigation strategy and adopt a serious of mitigation steps for responging then monitoring the status of each steps and find out the traffic light from original red light(means high priority) falling to green light after finishing all the mitigation steps, the perfect condition can be accepted by risk manager, the case study fully proved the theory and come out the success result, the case study provides the methodology of the implementation of project risk management application tool, for the enterprise to control the risks of a project to meet the schedule, cost, and quality commitment and fulfill the project goals. | en |
| dc.description.provenance | Made available in DSpace on 2021-06-13T16:27:27Z (GMT). No. of bitstreams: 1 ntu-94-P91744009-1.pdf: 2221637 bytes, checksum: c3948ebcf9bea68f6336d93780229b9d (MD5) Previous issue date: 2005 | en |
| dc.description.tableofcontents | 第1章 緒論 1
第1節 研究動機與背景 1 第2節 研究內容與限制 5 第3節 研究方法與流程 6 第4節 預期成果 11 第2章 文獻探討 12 第1節 專案 12 第2節 專案管理 13 第3節 風險管理 19 第3章 風險管理平台工具評估及簡介 23 第1節 專案管理軟體 23 第2節 風險管理軟體 25 第3節 風險管理軟體簡介 25 第4章 案例分析 28 第1節 案例說明 28 第2節 專案範疇 29 第3節 專案時間 32 第4節 專案資源 32 第5節 專案風險 33 第5章 專案風險管理資訊系統之應用 44 第1節專案風險管理制度建構 44 第2節 專案風險管理軟體系統建構 51 第3節 硬體架構及設備需求 52 第4節 案例應用 53 5.4.1風險規劃 53 5.4.2 風險辨識 56 5.4.3 風險評估 56 5.4.4 風險處置 59 5.4.5 風險監控及報告 61 第6章 結論與建議 83 第1節 結論 83 第2節 執行遭遇之困難 86 第3節 建議 87 參考文獻 91 附錄 A. 風險管理資料字典 1 附錄 B. INDEPENDENT INDIVIDUAL EVALUATION MATRIX B-1 | |
| dc.language.iso | zh-TW | |
| dc.subject | Risk Management | en |
| dc.subject | Risk | en |
| dc.subject | Project | en |
| dc.subject | Project Management | en |
| dc.subject | Project Risk Management | en |
| dc.title | 專案風險管理資訊系統應用案例探討 | zh_TW |
| dc.title | Implementation Case study of Project Risk Management IT System | en |
| dc.type | Thesis | |
| dc.date.schoolyear | 93-2 | |
| dc.description.degree | 碩士 | |
| dc.contributor.oralexamcommittee | 劉順仁,林美花 | |
| dc.subject.keyword | 風險,風險管理,專案,專案管理,專案風險管理, | zh_TW |
| dc.subject.keyword | Risk,Risk Management,Project,Project Management,Project Risk Management, | en |
| dc.relation.page | 93 | |
| dc.rights.note | 有償授權 | |
| dc.date.accepted | 2005-07-14 | |
| dc.contributor.author-college | 管理學院 | zh_TW |
| dc.contributor.author-dept | 會計與管理決策組 | zh_TW |
| 顯示於系所單位: | 會計與管理決策組 | |
文件中的檔案:
| 檔案 | 大小 | 格式 | |
|---|---|---|---|
| ntu-94-1.pdf 未授權公開取用 | 2.17 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。
