  1. NTU Theses and Dissertations Repository
  2. 工學院
  3. 土木工程學系
請用此 Handle URI 來引用此文件: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/33330
完整後設資料紀錄
DC 欄位值語言
dc.contributor.advisor曾惠斌
dc.contributor.authorYuan-Ming Sunen
dc.contributor.author孫元明zh_TW
dc.date.accessioned2021-06-13T04:34:58Z-
dc.date.available2009-07-20
dc.date.copyright2006-07-20
dc.date.issued2006
dc.date.submitted2006-07-19
dc.identifier.citation1. O’Connor, J., and Vickroy, G., 1985, “Control of contruction project scope”, Constr. Industry Inst., Univ of Texas, Austin, Tex.
2. Songer, A., Molenaar, K. and Robinson, G.(1996), “Selection Factors and Success Criteria for Design-Build in the U.S and U.K.” Journal of Construction Procurement. ASCE, Vol.2, No.2, pp.69-82.
3. Design-Build institute of America, 1997, Design-Build Construction Guide, DBIA.
4. Ken Fredrickson, 1998, “Design Guidelines for Design Build Projects”, Journal of Management in Engineering, ASCE, January/February.
5. Victor Sanvido、Mark Konchar、“Selecting project delivery system”project delivery Institute,PA,U.S.A.,pp.13-20,1999.
6. Douglas D.Gransberg and Keith Molenaar,ASCE Design-Build Workbook, 1998-2001.
7. Oberlender, G. D., and Trost, S.M., 2001, “Predicting Accuracy of Early cost Estimates Based on Estimate Quality”, Journal of Construction Engineering and Management, May/June.
8. Gould, F. M. and Joyce, J. A.(2003), Construction project management. 2nd Edition. Upper Saddle River, New Jersey.
9. 林文盛(1994),「公共工程統包制度之研究」,台灣科技大學營建研究所碩士論文。
10. 陳世銘(1995),「建築工程設計與施工結合制度之研究」,台灣科技大學營建研究所碩士論文。
11. 蔡國龍(1999),「統包策略應用於新市鎮公共工程之研究」,中華大學碩士論文。
12. 陳淑君(2002),「公共工程統包採購制度執行最有利標選商評選項目之研究」,台灣大學土木工程學研究所碩士論文。
13. 林裕修(2002),「公有建築以統包方式辦理在需求規範訂立及其變動影響之研究」,朝陽科技大學碩士論文 。
14. 廖宗盛(2002),「公共工程統包制度執行問題研析與改進對策之研究」,台灣大學土木工程學研究所博士論文。
15. 李志峰(2002)「公共工程統包契約規定之探討」,國立高雄第一科技大學碩士論文。
16. 林家煌(2003),「公共工程統包專案設計管理之研究」,台灣大學土木工程學研究所碩士論文。
17. 陳政華(2004),「統包工程業主基本設計程度之探討以橋樑工程為例」,國立高雄第一科技大學碩士論文。
18. 張德平(2004),「公共工程統包爭議仲裁之研究」,成功大學建築研究所碩士論文。
19. 郭明祥(2005),「高科技廠房採用統包方式之執行面缺失與設計作業關聯性之探討」,國立交通大學土木工程系碩士論文。
20. 陶家維、梁樾(1994),『公共工程統包制度之研究』,行政院公共工程委員會委託研究。
21. 王啟元、陳邁、李得璋(1995),「建築工程施行設計與施工結合制度之可行性分析」,中華民國營造業研究發展基金會。
22. 劉政良(1999),「預算編列」,台灣營建研究院,工程計劃專案管理,P.P.119-170。
23. 嚴士潛(1999),「設計與建造契約,統包契約文件之研訂」,行政院公共工程委員會委託研究。
24. 顏敏仁、羅維(2001),『統包制度對營建業市場結構之影響—以台灣營建業為例』,土木水利(27卷,第4期)。
25. 行政院公共工程委員會(2001),以統包制度加速推動國家計劃之研究。
26. 台灣地區隧道岩體分類系統暨隧道工程資料庫之建立(第三期九十二年度),行政院公共工程委員會專案研究計畫。
27. 行政院公共工程委員會(2003),「政府公共工程計畫與經費審議作業要點」。
28. 國防部總政治作戰部(1999),國軍老舊眷村改建工程統包招標制度。
29. 行政院公共工程委員會(2003),各機關辦理公有建築物作業手冊
30. 行政院公共工程委員會(2004),統包模式之工程進度及品質管理參考手冊
31. 行政院公共工程委員會(1998),「公共建設工程經費估算編列手冊」。
32. 楊國樞(1996),「社會及行為科學研究法(上、下)」,台北,東華書局。
33. 劉福勳(1999),「營建管理概論」,台北,詹氏書局。
34. 吳明隆編著(2006),「SPSS統計應用實務」,台北,松崗電腦圖書公司。
dc.identifier.urihttp://tdr.lib.ntu.edu.tw/jspui/handle/123456789/33330-
dc.description.abstract對於主辦機關而言,統包標招方式在尚未設計完成即辦理招標具有高度風險,在以往許多統包工程案例中,將太多的注意力集中在工程預算與時程的執行成果上,而反倒忽略了工程範圍明確界定的重要性,以致陸續衍生出許多糾紛與爭議。當業主確定以統包方式辦理招標時,除法令另有規定者外,至少應依「統包實施辦法」第6條之規定,將應載明事項公告於招標文件中,業主如果明確掌握統包工程發展預期的需求目的,反應主辦機關內部需求營運策略,在避免過高的需求或限制統包商的設計彈性及引進新工法之空間原則下,給予統包商做為發展規劃、設計參考之設計規範愈為明確,則造就工程標案順利完成的機率也就愈高。
以往探討統包需求條件的文獻並不多見,且大多徧重於設計管理問題。本研究主要以協助業主的立場,探討在選擇統包發包方式之公有建築工程其設計工作範圍應有的項目,藉由案例、專家訪談及問卷調查對於主辦機關設計工作範圍擬定意見之統整,並進一步統計分析,以尋求建立需求計畫中涉及設計部分之重要關鍵要項,最後歸納適當之統包建築工程的設計項目。希望藉此成果,能夠提供國內各公共工程相關單位對於建築工程設計需求計畫擬定參考,以期對主辦機關興建計畫落實能有所貢獻。
zh_TW
dc.description.abstractThe responsible entity became aware of the high risk in turnkey bid execution derived from the turnkey bidding of which the basic design has not been completed yet. By reviewing of those past turkey bidding cases, there were excess focuses on the execution of engineering costing and scheduling and the significance of concrete construction scope was ignored. Consequently, various arguments and disputes resulted from this weakness. Once the proprietor decides to undertake turnkey tender, except those of regulation obligation, the written requirement of the tender document must be promulgated in compliance with article 6 of Regulations for the implementation of turnkey. Provided that the proprietor could firmly identify its objective of construction work and demonstrate inner operation strategy of responsible entity, while following the principle of avoiding too much limitation on turnkey contractor’s design flexibility and new technique employment; turnkey contractor obtains more positive standards of planning and design references and higher success possibility of construction bid execution would be managed.
Few literatures examining prerequisite of turnkey were found in the past, most subjects dealt with management for design phase. With assist proprietor’s point of view this research has been deliberated on designing scope necessary for public construction work whereas selecting turnkey tender procedure. By means of case study, expert interview and questionnaire survey, those initial drafting suggestions of responsible entity have been compiled together; after perform statistical analysis in depth essential requirements related to design task of project have been established and finalize one applicable designing items of turnkey construction. The paper is aiming to serve as reference for drafting engineering design project of public construction entities as well as fulfill making responsible entity’s construction project practicable.
en
dc.description.provenanceMade available in DSpace on 2021-06-13T04:34:58Z (GMT). No. of bitstreams: 1
ntu-95-P92521703-1.pdf: 869711 bytes, checksum: 49242a43b604d3e175aedad49a1b877d (MD5)
Previous issue date: 2006
en
dc.description.tableofcontents目錄
第一章 緒論 1
1.1 研究動機 1
1.2 研究目的 2
1.3 研究內容及範圍 2
1.4 研究限制 4
1.5 研究方法與流程 4
第二章 文獻回顧與探討 7
2.1 統包概要 7
2.1.1 統包之定義 7
2.1.2 統包工程契約特性 8
2.1.3 統包的效益 9
2.1.4 統包工程之優、缺點 12
2.2統包與傳統招標制度比較 14
2.2.1傳統訂約 14
2.2.2 統包工程招標準備階段 18
2.2.3 統包制度之推行方式: 19
2.3統包相關法令探討 21
2.4統包需求問題分析 23
2.5 小結: 27
第三章案例分析與問卷調查分析方法 28
3.1國內統包工程案例整理分析 28
3.1.1 公共工程統包案例 28
3.2 統包設計項目分類問題之建立 34
3.3問卷調查與分析流程 35
3.3.1 問卷量表的選擇 35
3.3.2 問卷量表建立與分析流程 37
3.4 預試 38
3.4.1 調查對象 38
3.4.2 項目分析 38
3.4.3 因素分析 42
3.4.4 信度與效度 45
3.5 正式問卷 47
3.5.1 調查樣本對象 47
3.5.2 相關統計分析 47
3.6小結 49
第四章 問卷分析與項目架構建立 50
4.1 預試問卷各階段分析 50
4.1.1 樣本數統計 50
4.1.2 項目分析結果 51
4.1.3 因素分析結果 58
4.1.4 信效度分析檢討 64
4.2設計項目架構建立 66
第五章正式問卷結果與設計項目之研擬 71
5.1樣本背景分析 71
5.2 設計子項之相對重要性 77
5.3 各設計項目間之相互關係 80
5.4 公私部門對設計項目重視程度之差異分析 84
第六章結論與建議 87
6.1 結論 87
6.2 後續研究與建議 89
參考文獻 91
附錄一 93
dc.language.isozh-TW
dc.subject公有建築zh_TW
dc.subject統包zh_TW
dc.subject設計項目zh_TW
dc.subjectdesigning itemsen
dc.subjectpublic constructionen
dc.subjectturnkeyen
dc.title公共建築統包方式發包設計項目架構之研究zh_TW
dc.titleA Study on Developing the Design Requirement Framework of A Design-Build for Public Construction Projecten
dc.typeThesis
dc.date.schoolyear94-2
dc.description.degree碩士
dc.contributor.oralexamcommittee廖宗盛,陳永祥,王隆昌
dc.subject.keyword公有建築,統包,設計項目,zh_TW
dc.subject.keywordpublic construction,turnkey,designing items,en
dc.relation.page100
dc.rights.note有償授權
dc.date.accepted2006-07-20
dc.contributor.author-college工學院zh_TW
dc.contributor.author-dept土木工程學研究所zh_TW
顯示於系所單位:土木工程學系

文件中的檔案:
檔案 大小格式 
ntu-95-1.pdf
  未授權公開取用
849.33 kBAdobe PDF
顯示文件簡單紀錄


系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved