請用此 Handle URI 來引用此文件: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/32180
完整後設資料紀錄
DC 欄位值語言
dc.contributor.advisor郭斯傑(Sjguo Guo)
dc.contributor.authorTsung-Hsiang Chenen
dc.contributor.author陳宗祥zh_TW
dc.date.accessioned2021-06-13T03:35:25Z-
dc.date.available2006-08-01
dc.date.copyright2006-08-01
dc.date.issued2006
dc.date.submitted2006-07-26
dc.identifier.citation英文文獻
1. Anderson Sweeny Willian「STATASTICS FOR BUSINESS AND ECONOMICS」(8th ed.,)pp. 116-118, pp. 726-743, (2003).
2. Davis Langdon & Everest「ANALYSIS OF HISTORICAL CONSTRUCTION COST MOVEMENTS IN SCOTTISH SOCIAL HOUSING FINAL REPORT」December 2003
3. Dixit, Avinash (1989). “Entry and Exit Decision Under Uncertainty, ” Journal of Political Economy97 (No. 3), pp. 620-638.
4. Dixit, Avinash K., and Robert S. Pindyck (1995).“The Options Approach to Capital Investment,”Harvard Business Review (May-June), pp.105-115.
5. Hubbard, R. Glenn (1994). “Investment Under Uncertainty: Keeping One’s Options Open,” Journal of Economic Literature 32 (No. 4, December), pp. 1816-1831.
6. Megginson, William. L. (1997). Corporate Finance Theory, Addison-Wesley ducational Publishers Inc., NY.
7. Wang , Ching-Hwang and Yong-HO Mei,“Optimization model for forecasting construction cost indices in Taiwan,” Journal of Construction Management and Economics, Vol. 16, pp. 147-157,(1998).
8. Cost Indices/Statistical Abstract of the United States. GNP deflator is used for the price deflator index
9. OECD, Eurostat / COMPONENT COST METHOD (CONSTRUCTION PRICE INDICES) /Sources and Methods: Construction Price Indices, , 1997

中文文獻
1. 梅永和/營造工程物價指數預測之初步研究/台灣科技大學/營建工程技術學系/83/碩士論文 
2. 游源順/國內營造工程物價指數相關問題之探討交通大學/管理科學研究所/82/碩士論文
3. 麥聖偉/應用灰色理論預測營建物價與營造工程物價指數/中興大學/土木工程學系/86/碩士論文  
4. 劉峰志/以類神經網路預測營造工程物價指數之研究/國立台灣科技大學/營建工程系/88/碩士論文 
5. 蔡裕春/台灣地區營造工程物價指數預測之研究─以類神經網路與ARIMA模式/輔仁大學/應用統計研究所/89/碩士論文
6. 劉同敏/『營造工程物價漲跌』之風險討論/ 2003.4.16 『營造工程物價漲跌』
7. 沈勁利/營建工程契約價金隨物價指數調整之研究/國家科學委員會補助專題研究計畫成果報告/海洋科技博物館籌備處/90/7 .31
8. 黃裕鈞/在介入變數影響下預測營造工程物價指數/國家科學委員會專題研究計畫成果報告/ 89.7 .31
9. 黃裕鈞/以非線性模式預測營造工程物價指數/王慶煌教授/90 .07 .31
10. 蕭偉松/論營建工程遲延與情事變更原則之適用/東吳大學法律學系研究所/89/碩士論文/
11. 張俊利/建築工程造價之預測與探討(以大台北地區RC集合住宅為例)/中央大學土木工程學系碩士在職專班/92/碩士論文
12. 張維迎/賽局理論與信息經濟學/北大光華管理學院/85。
13. 李禮仲/國際油價飆升對台灣經濟可能之衝擊/青年日報/銘傳大學法律系副教授/ 93/9/15
14. 夏斌/張鵬/對近期投資反彈和鋼價上漲的分析/中國經濟時報/國務院發展研究中心金融研究所/2004/9/24
15. 經濟部統計處新聞資料/工業生產變動概況/95.01
16. 台灣營建研究院營建管理組/主要資材之價格趨勢分析/91.12.02/95.01.27
17. 吳立文/王嘉偉/以實質選擇權量化營建採購合約中物料價格波動影響之研究/台灣大學/93.6.29
18. 行政院主計處/訂定物價指數連動調整款之一般原則
dc.identifier.urihttp://tdr.lib.ntu.edu.tw/jspui/handle/123456789/32180-
dc.description.abstract92年至93年因為國際經濟景氣回升,全球市場需求旺盛及原料成本增長等原因,國內營建物價因應鋼筋、砂石等原物料價格飆漲劇烈,行政院公共工程委員會邀集業界代表開會積極研商因應,92年4月30日行政院函文要求各機關辦理工程採購時,因應國內營建物價劇烈變動,適用「因應國內鋼筋價格變動之物價調整處理原則」;近期又因國際原油價格上漲,導致國內產業與石油息息相關的生產運輸成本大幅上升,行政院於94年1月24日函文各機關將物調處理原則適用期限配合調整為94年12月31日。目前有關「物價指數調整工程款」規定措施是否達到解決廠商因鋼筋、砂石價格上漲虧損之目標?各種不同性質之工程一率適用物價調整處理原則後之公平合理性?本研究即對物價調整處理原則調整施工期間之工程款作案例狀況探討。
研究方法擬由行政院主計處公佈總指數與物價調整處理原則規定與台灣營建研究院「營建物價」比較,藉由營造工程指數與營建物價之發展沿革、調查方法與編製方式,檢討物價調整之法令規則,並收集研究文獻,回顧過去有關「物價指數調整工程款」規定。將營造工程物價總指數調整「機關補貼」計算方法與實際鋼筋及混凝土上漲「廠商損失」計算方法比較。物價指數調整金額以主計處公佈總指數及廠商估驗款中之直接工程費計算,廠商實際損失金額以台灣營建研究院調查之鋼筋、型鋼、混凝土、砂石四項營建物價計算差額,兩者分別以開標當月總指數及營建物價價格為基期,試算施工階段補貼款及廠商因物價波動之損失比較。再據以分析建築、土木類不同契約類型因物價波動實際遭受損失情形。
案例研究共收集91-95年期間之建築案例7個、土木類案例10個,工程金額約1.2億至21.3億元,案例探討採統計圖表、財務試算,比較案例機關補貼與廠商損失,發現完工案例中機關補貼金額高於廠商實際損失金額共有14例,廠商損失較高者有3例,進一步分析參雜各標案項目契約預算項目權重、適用時間不同等可能原因,因此物價調整處理原則統一採用主計處營造工程物價總指數之政策,應檢討適當合理之調整策略。
最後彙整研究結論提出建議,契約工項權重連動的量化調整模式,以賽局理論建立物價調整履約爭議模式,模擬主辦機關與廠商均衡模式,探討現行「因應國內鋼筋價格變動之物價調整處理原則」之指數調整補貼工程款之適當性。
zh_TW
dc.description.abstractThe world economy boomed in the years 2003 and 2004. This increase in economic activity has led to increased construction activity causing increased demand for construction materials such as reinforcement bars, sand and gravel, cement, etc. This has led to a corresponding increase in the prices for these construction supplies. To handle the price problem, the Public Construction Commission of the Executive Yuan had a meeting with Association of General Contractors representatives and issued an April 30, 2003 memorandum (valid until December 2004) to all government departments. This memo outlined the procedures for handling construction price adjustments for all government construction contracts. This memo was originally valid until December 2004 but the increase in oil prices led to a one year extension of the memo – till December 2005. This research analyzes whether this memo for project fund adjustments (escalation) adequately addresses the losses of contractors from material price increases.
The second part of this research will describe and explain two different ways of adjusting project costs (escalation) in public government projects. One way of providing project cost escalation is based on the published total construction cost index (CCI) of the Directorate of Budget, Accounting and Statistics. Another way (non-index based) is provided by the Taiwan Construction Research Institute (TCRI). TCRI’s escalation calculation method is based on the bi-monthly published prices of major construction materials.
It appears that using the total CCI to provide project cost escalation for all material cost increases does not allow contractors to adequately cover the actual added cost of increased material costs. This method of providing cost escalation is based on a total of the indices of all construction materials in the entire country and is not applicable to each individual material or project. Perhaps a better way of calculating the material price escalation is to apply the different indices for each construction material.
Another way of providing project cost escalation is based on the unit price difference between the contract price and actual price of materials used in the project multiplied by the actual quantities used in the project. The individual construction material prices used in this second way of calculating material price escalation are provided by the Taiwan Construction Research Institute (bi-monthly prices).
The third part of this research provides a case study of 17 public projects. These two ways of calculating material price escalations are applied to these 17 public projects. The result of these calculations is quite surprising. It appears that in most cases (14 out of 17 projects) the government is actually paying more for material price escalation using the current index based method than by using another alternative material price escalation method. In the remaining three cases, the contractor has suffered losses because of the index method of calculation material price escalation. These three exceptions are analyzed in greater detail to determine why the contractor suffered losses using the index method of calculating material price escalation.
The fourth and final part of this research proposes a third way of calculating material price escalation. This third way of calculation uses a weighted average of the material cost portion of the total project cost. A further discussion is made on using game theory for conflict resolution.
en
dc.description.provenanceMade available in DSpace on 2021-06-13T03:35:25Z (GMT). No. of bitstreams: 1
ntu-95-P92521709-1.pdf: 857369 bytes, checksum: 0a00c0027333b7081aa1c362e76e9052 (MD5)
Previous issue date: 2006
en
dc.description.tableofcontents第一章 緒論 1
第一節 研究動機與目的 1
一、研究動機 1
二、研究目的 2
第二節 研究流程、範圍與預期成果 4
一、研究流程 4
二、研究範圍 5
三、論文架構 6
四、預期成果 6
第二章 物價調查編製與文獻回顧 8
第一節 主計處之營造工程物價指數 8
一、查編沿革 8
二、統計指標編製方法與資料來源說明: 9
三、編製目的與用途: 9
第二節 臺灣營建研究院之營建物價 11
一、價格資料之構成 11
二、工程物料價格之調查基準 11
第三節 指數調整工程款之辦法 15
一、調整背景 15
二、指數調整工程款的辦法 16
第四節 物價指數調整條款文獻回顧 18
一、游源順(83年) 18
二、梅永和 (84年) 19
三、麥聖偉(87年) 19
四、劉峰志(88年) 19
五、蔡裕春(89年) 20
六、沈勁利(90年) 20
第三章 案例研究 22
第一節 總指數調整工程款與營建物價漲跌比較 22
一、90年至94年營建工程物價調查 22
二、案例比較方法 25
三、物價調整案例 26
第二節 案例個案探討 28
一、建築案例 28
二、土木橋樑案例 40
第四章 物價指數變動案例分析與模式之建立 59
第一節 物價指數變動案例分析 59
一、建築工程類 59
二、土木類案例 62
第二節 營建工程物價波動均衡模式之建立 65
一、物價波動爭議觀點 65
二、物價調整模式 67
三、履約爭議均衡模式 68
第五章 結論與建議 72
第一節 成果結論 72
第二節 建議 73
一、規劃階段之編訂預算造價建議 73
二、建議機關之物價調查管、考、用合一 74
三、法令強制規定契約訂定物價調整條款 74
四、採購法規及招標文件訂定契約權重與物價變動之連動調整條款 74
dc.language.isozh-TW
dc.title營造工程物價指數增減率與工程款調整合理性之研究zh_TW
dc.titleThe rationality of construction payment adjustments based on the increasing/decreasing rate of the construction cost index (CCI).en
dc.typeThesis
dc.date.schoolyear94-2
dc.description.degree碩士
dc.contributor.oralexamcommittee辛其亮,曾仁杰,葉文凱
dc.subject.keyword營造工程物價指數,因應國內鋼筋價格變動之物價調整處理原則,營建物價,賽局理論,zh_TW
dc.subject.keywordConstruction Cost Index,construction prices could be readjusted according to the change of construction cost indices principle,Construction Cost Data,Game Theory,en
dc.relation.page78
dc.rights.note有償授權
dc.date.accepted2006-07-27
dc.contributor.author-college工學院zh_TW
dc.contributor.author-dept土木工程學研究所zh_TW
顯示於系所單位:土木工程學系

文件中的檔案:
檔案 大小格式 
ntu-95-1.pdf
  目前未授權公開取用
837.27 kBAdobe PDF
顯示文件簡單紀錄


系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved