請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/27798完整後設資料紀錄
| DC 欄位 | 值 | 語言 |
|---|---|---|
| dc.contributor.advisor | 吳文方(Wen-Fang Wu) | |
| dc.contributor.author | Ro-Sen Lin | en |
| dc.contributor.author | 林若森 | zh_TW |
| dc.date.accessioned | 2021-06-12T18:21:10Z | - |
| dc.date.available | 2007-09-03 | |
| dc.date.copyright | 2007-09-03 | |
| dc.date.issued | 2007 | |
| dc.date.submitted | 2007-08-22 | |
| dc.identifier.citation | Ayyub, B.M. (2003) Risk Analysis in Engineering and Economics, New York: CRC Press.
Bernstein, P.L. (2000) The enlightening struggle against uncertainty, Financial Times 1, 5-10. Carbone, T.A. and Tippett, D.D. (2004) Project risk management using the project risk RFMEA, Engineering Management Journal 16, 28-35. Cavazos-Cadena, R. and Montes-De-Oca, R. (2003) The value iteration algorithm in risk-sensitive average Markov decision chains with finite state space, Mathematics of Operations Research 28, 752-776. Fernandez, M.G., Seepersad, C.C., Rosen, D.W., Allen, J.K., and Mistree, F. (2005) Decision support in concurrent engineering – the utility-based selection decision support problem, Concurrent Engineering: Research and Application 13, 13-27. Hausken, K. (2002) Probabilistic risk analysis and game theory, Risk Analysis 22, 17-27. Koller, G.R. (2000) Risk Assessment and Decision Making in Business and Industry: a Practical Guide, Boca Raton: CRC Press. Project Management Institute (2000) A Guide to the Project Management Body of Knowledge, Newtown Square: Project Management Institute. Shaw, N. E. and Burgess, T. F. (2005) Risk assessment of option performance for new product and process development projects in the chemical industry: a case study, Journal of Risk Research 8, 693-711. Ward, S. (1999) Requirements for an effective project risk management process, Project Management Journal 30, 37-43. Yager, R.R. (2006) Perception based granular probabilities in risk modeling and decision making,” IEEE Transactions on Fuzzy Systems 14, 329-339. Zhao, T. (2006) Infrastructure development and expansion under uncertainty: a risk preference based lattice approach, Journal of Construction Engineering and Management 132, 602-625. 宋增民 (2001),「作業研究-原理及題解」,中央圖書出版社,台北市。 劉賓陽 (2006),「作業研究」,麥格羅希爾,台北市。 藍元志 (2003),「專案風險管理回應策略選擇模式之建立」,中央大學工業管理研究所碩士論文。 羅應浮 (2000),「專案管理的失效模式與效應分析」,中華大學工業工程管理研究所碩士論文。 | |
| dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/27798 | - |
| dc.description.abstract | 專案執行的過程中,往往會遇到許多意外事故導致專案時程延宕或金錢損失,這些事故稱之為專案風險。因此,為降低專案風險所帶來的影響,有效的專案風險管理模式實為重要之議題。
本研究整合過去國內外學者所提出之專案風險分析模式,並引入風險偏好的概念,建構一專案風險決策模式,使決策者可依據自身之風險偏好,針對各項風險回應策略作評估,並在有限資源條件限制下,進行決策分析。本研究所建構之專案風險決策模式乃結合「專案風險失效模式與效應分析」(project Risk Failure Mode and Effects Analysis,簡稱RFMEA)與「專案風險管理回應策略選擇模式」,以風險降低值取代效益作為風險回應策略之評估指標,並應用「以效用為選擇基礎之決策支援問題」(utility based-selection decision support problem,簡稱u-sDSP)模式以評估決策者對於各項風險回應策略之效用值,最後使用整數規劃的原理,在滿足決策者效用最大化與有限資源條件限制的前提下,選出一組風險回應策略組合。而此組合,即為對此決策者而言之最佳風險回應策略組合。 由於專案風險管理回應策略選擇模式乃是使用效益作為風險回應策略的評估指標,但本研究發現此指標有其不當之處,因此本研究乃使用風險降低值作為評估指標。最後以一魚雷開發專案為例,套用專案風險管理回應策略選擇模式與本研究所建構之專案風險決策模式進行分析,所得之結果顯示,本研究所得之結果要優於專案風險管理回應策略選擇模式所得之結果,且本研究建構之專案風險決策模式亦考量到決策者風險偏好之問題,因此在實際應用上,更能得到符合決策者心中理想之決策。 | zh_TW |
| dc.description.abstract | During the execution of a project, unexpected events usually cause delay and financial loss, these are termed project risks. As a result, in order to reduce the impact of project risk, effective risk management model becomes an important issue.
This study integrates project risk analysis models proposed by scholars and introduces the concept of risk preference to establish a project risk decision model. Decision makers can evaluate each risk treatment strategy according to their own risk preference. This study establishes a project risk decision model and uses “risk decrease” to replace “effect” as the evaluating index. Furthermore, the utility based-selection decision support problem model (u-sDSP) is employed to evaluate the utility of risk treatment strategies for decision makers. Finally, the principle of integer programming is adopted to determine the optimal set of risk treatment strategies which maximizes effects with limited resources. Taking a case of Torpedo Development Project as an example, the proposed combined model is employed in the analysis, and the result is compared with those obtained form other models. In conclusion, results obtained from the proposed model of this study is better. The reason is attributed to that the project risk decision model established by this study has taken risk preference into consideration. Thus, in practical application, the proposed model can provide better decision making solutions for decision makers. | en |
| dc.description.provenance | Made available in DSpace on 2021-06-12T18:21:10Z (GMT). No. of bitstreams: 1 ntu-96-R94546028-1.pdf: 2060854 bytes, checksum: 49712d3030499127730ea65c584579eb (MD5) Previous issue date: 2007 | en |
| dc.description.tableofcontents | 誌謝 I
摘要 II 英文摘要 III 目錄 IV 表目錄 VII 圖目錄 IX 第一章 緒論 1.1 研究背景與動機.......................................................................................1 1.2 研究目的...................................................................................................1 1.3 研究範圍...................................................................................................2 1.4 研究架構...................................................................................................2 1.5 研究流程...................................................................................................3 第二章 文獻探討 2.1 風險的定義...............................................................................................4 2.2 專案風險管理與分析...............................................................................4 2.2.1 專案風險管理流程........................................................................5 2.2.2 專案風險失效模式與效應分析....................................................6 2.2.3 風險矩陣…………........................................................................7 2.2.4 工作分解結構……......................................................................10 2.2.5 整數規劃…...…….......................................................................10 2.3 風險決策模式…….................................................................................11 2.3.1 風險回應策略..…........................................................................11 2.3.2 決策樹分析…..…........................................................................12 2.3.3 有限資源限制下的風險決策......................................................13 2.3.4 風險偏好與其對風險決策的影響..............................................14 2.3.5 應用預期效用理論於風險決策..................................................15 2.4 文獻回顧統整.........................................................................................16 第三章 專案風險管理與決策模式之建立 3.1 問題描述….............................................................................................17 3.2 專案風險管理與與決策模式之架構.....................................................17 3.3 專案風險辨識…….................................................................................17 3.4 專案風險分析.........................................................................................19 3.5 專案風險決策模式.................................................................................21 3.5.1 專案風險決策流程概述..............................................................21 3.5.2 風險回應策略之風險降低值與成本評估..................................21 3.5.3 風險回應策略效用之評估..........................................................22 3.5.4 有限資源限制下之風險回應策略選擇模式..............................26 第四章 實例驗證 4.1 專案概述….............................................................................................28 4.2 魚雷開發專案風險評估與決策流程.....................................................28 4.2.1 魚雷開發專案風險辨識..............................................................29 4.2.2 魚雷開發專案風險分析..............................................................30 4.2.3 魚雷開發專案風險回應策略......................................................34 4.2.4 有限資源限制下魚雷開發專案之風險回應策略選擇模式......44 第五章 研究結果討論與結論 5.1 結果討論….............................................................................................46 5.2 結論.....................................................…................................................51 參考文獻..................................................................................................................53 | |
| dc.language.iso | zh-TW | |
| dc.subject | 風險決策 | zh_TW |
| dc.subject | 專案風險管理 | zh_TW |
| dc.subject | 風險偏好 | zh_TW |
| dc.subject | 效用 | zh_TW |
| dc.subject | utility | en |
| dc.subject | project risk management | en |
| dc.subject | risk decision | en |
| dc.subject | risk preference | en |
| dc.title | 考量風險偏好與有限資源限制下之專案風險決策模式 | zh_TW |
| dc.title | Project risk decision model under risk preference and limited resources | en |
| dc.type | Thesis | |
| dc.date.schoolyear | 95-2 | |
| dc.description.degree | 碩士 | |
| dc.contributor.oralexamcommittee | 林棋瑋,游章雄 | |
| dc.subject.keyword | 專案風險管理,風險偏好,效用,風險決策, | zh_TW |
| dc.subject.keyword | project risk management,risk preference,utility,risk decision, | en |
| dc.relation.page | 54 | |
| dc.rights.note | 有償授權 | |
| dc.date.accepted | 2007-08-23 | |
| dc.contributor.author-college | 工學院 | zh_TW |
| dc.contributor.author-dept | 工業工程學研究所 | zh_TW |
| 顯示於系所單位: | 工業工程學研究所 | |
文件中的檔案:
| 檔案 | 大小 | 格式 | |
|---|---|---|---|
| ntu-96-1.pdf 未授權公開取用 | 2.01 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。