請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/20805
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 郭斯傑(Sy-Jye Guo) | |
dc.contributor.author | Jyun-Yu Chen | en |
dc.contributor.author | 陳俊宇 | zh_TW |
dc.date.accessioned | 2021-06-08T03:04:27Z | - |
dc.date.copyright | 2017-07-17 | |
dc.date.issued | 2017 | |
dc.date.submitted | 2017-07-10 | |
dc.identifier.citation | 1. Berwald, S.,” From CAD to BIM: The Experience of Architectural Education with Building Information Modeling,” AEI 2008: Building Integration Solutions, Denver, Colorado(2008).
2. Chen, Q., Reichard, G. and Beliveau, Y., “Multi-perspective Approach to Exploring Comprehensive Cause Factors for Interface Issues,” Journal of Construction Engineering and Management, Vol.134, No.6, pp.432-441(2008). 3. Korman, T. M. and Tatum, C. B., “Development of a Knowledge-Based System to Improve Mechanical, Electrical, and Plumbing Coordination,” CIFE Technical Report, No.129, Stanford University, Stanford, CA(2001). 4. Korman, T. M., Fischer, M. A. and Tatum, C.B., “Knowledge and Reasoning for MEP Coordination,” Journal of Construction Engineering and Management, ASCE, Vol.129, No.6, pp.627-634 (2003). 5. Korman, T. M., Simonian, L. and Speidel E., “Using Building Information Modeling to Improve the Mechanical, Electrical, and Plumbing Coordination Process for Buildings”, AEI 2008: Building Integration Solutions, Denver, Colorado(2008). 6. Kunz, J. and Fischer, M., “Virtual Design and Construction: Themes, Case Studies and Implementation Suggestions,” CIFE Working Paper, No.97, Stanford University, Stanford, CA(2012). 7. Lin, Yi-Chun, Chou, Shin-Hsun and Wu, I-Chen, “Conflict Impact Assessment between Objects in a BIM System,” Proceedings of the 30th International Symposium on Automation and Robotics in Construction, Montreal, Canada (2013). 8. Pavitt, T.C. and Gibb, A.G F., “Interface Management within Construction, in Particular Building Facade,” Journal of Construction Engineering and Management, ASCE, Vol.129, No.1, pp. 8-15 (2003). 9. 江文章「界面表達系統與界面管理體系之研究-以土建與機電之界面為對象」,碩士論文,國立臺灣科技大學,2001。 10. 江英二、 李萬利、蘇瑞育「BIM於商旅大樓興建工程之施工應用實務與效益」,中華技術,第91期,第80-91頁,2011。 11. 李宗民,「BIM系統科技提升機電產業鏈的整體價值之研究」,碩士論文,國立臺灣大學,2015。 12. 李炯興,「結合BIM及時程資訊以偵測建築營建階段軟衝突」,碩士論文,國立臺灣大學土木工程研究所,2013。 13. 吳翌禎、邱彥彰,「建築資訊模型應用於工作空間衝突分析之研究」,土木水利學刊,第37卷,第5期,BIM專輯,2010。 14. 林正良,「BIM技術在建築與機電工程整合管理實務之研究」,碩士論文,國立臺北科技大學,2014。 15. 林存甫,「給排水系統利用建築資訊模型估算成本之實證研究」,碩士論文,國立臺灣大學,2015。 16. 林羿均、鄭育閔、吳翌禎,「BIM-based整合設計流程分析與探討」,2012(第16屆)營建工程與管理學術研討會,2012。 17. 周筑昆,「工程施工界面管理」,營建設施之設計、分析、施工、營運與維護管理研討會,2007。 18. 黃文宗,「建築與水電施工界面查核管理之探討」,碩士論文,國立中央大學,2010。 19. 黃文俊,「建築資訊模型在4D排程及施工衝突檢查之應用實證」,碩士論文,中華大學,2012。 20. 陳宏名,「BIM方法應用於營建工程管理模式之研究-以施工階段為例」,碩士論文,國立臺北科技大學,2011。 21. 許金印,「機電工程之設計與施工作業整合案例研究」,碩士論文,國立臺北科技大學,2015。 22. 陳鴻雄, 「建築物機水電工程施工-常見缺失探討」,中工高雄會刊,第19卷,第二期,第63-65頁,2011。 23. 陳曉晴,「建築工程機電系統施工界面整合之探討」,碩士論文,國立臺灣大學,2004。 24. 謝尚賢,「BIM之技術應用中─LOD意謂詳細度或完整度」,營建知訊352期,第60-61頁,2012。 25. 謝尚賢等,「透過案例演練學習BIM:機電篇」,臺大出版中心,2015。 26. 鍾遠安,「導入建築資訊模型於空調設備工程成本估算之實證研究」,碩士論文,國立臺灣大學,2016。 27. 戴期甦、陳曉晴、郭斯傑,「建築工程機電系統施工界面整合之探討」,建築學報,第六十一期,第43-62 頁,2007。 28. 中華民國結構工程技師公會,「梁穿孔位置標準圖」。 29. 行政院內政部消防署,「各類場所消防安全設備設置標準」,2013。 30. 行政院內政部營建署,「混凝土結構設計規範」,2011。 31. 行政院內政部公共工程委員會,「建築物機水電施工及檢驗基準」,2009。 | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/20805 | - |
dc.description.abstract | 機電系統在建築工程中就像人體的內臟器官、管線系統則如神經血管一般,負責聯繫不同機電設備,如無法有效發揮功用,建築物僅是一具空殼。隨著建築機能日益提升,機電系統的複雜程度也隨之增加,相伴而生的界面衝突亦更難避免。機電設計目前以傳統2D圖說為主,存在設計錯誤難以發現、溝通困難、界面整合不易、資訊難以保存等問題,容易造成工程延宕、爭議增加、工程現場與設計圖說不符等狀況,若利用建築資訊模型(BIM)視覺化及資料保存的特性,將可有效減少上述的問題產生,因此利用BIM輔助進行機電設計將是不可避免的趨勢。
建築資訊模型在臺灣尚未全面發展,部分業主雖已於契約中明訂要求導入,然傳統工程習慣尚未被取代、軟體使用門檻與普及性等問題,仍須待時間解決。建築資訊模型能將傳統二維圖說資訊利用視覺化功能呈現立體狀況,可有效應用於機電工程界面衝突排除,然目前軟體應用仍須仰賴工程師的經驗與大量人力操作才能完善衝突排除的目的。因此本研究將利用案例實作機電衝突排除過程,試圖將衝突檢討流程標準化,提升應用建築資訊模型進行衝突檢討的效率,並於操作過程中,詳實紀錄遭遇問題與解決對策,期能當作未來使用者的參考依據。 | zh_TW |
dc.description.abstract | A building will not be completed without the mechanical, electrical and plumbing (MEP) system. The mechanical and electrical systems are to the construction as organs are to the human body, and the plumbing systems which build up the connections are the nerves and vessels. As the quality of constructions improving, the complexity of the MEP systems increases, interface conflicts come along. MEP are currently designed with 2D graphing; this derives issues on error identification, communication, interface integration, information storage, which may easily result in delay, disputes, discrepancies between sites and designs. Building Information Modeling (BIM) can manage visualization and information storage, hence, may efficiently mitigate the problems addressed. Designing MEP system with the aid of BIM has become an inevitable trend.
BIM has not yet been well developed in Taiwan. Although some customers have demanded using BIM in the contract, it takes time for traditional constructions to change. Traditional techniques are still existing, competitive barriers and promotion of the software are yet to be overcome. BIM can convert the tradition 2D diagram into 3D view with its visualization function, therefore, may mediate the interface conflicts. However, the software application currently requires the experience of the engineers and a larger amount of workforce to eliminate the conflicts. The purpose of this research is to make the BIM application more efficient by standardizes the process of the MEP elimination measure with a case study. A detailed record of problems encountered and solutions were kept during the research for further studies in the future. | en |
dc.description.provenance | Made available in DSpace on 2021-06-08T03:04:27Z (GMT). No. of bitstreams: 1 ntu-106-R04521710-1.pdf: 5704993 bytes, checksum: 0a4af315323c8875b516f64a08d5bc84 (MD5) Previous issue date: 2017 | en |
dc.description.tableofcontents | 目錄
口試委員會審定書 i 誌謝 ii 中文摘要 iii Abstract iv 目錄 v 圖目錄 viii 表目錄 xi 第一章 緒論 1 1.1 研究背景與動機 1 1.1.1 研究背景 1 1.1.2 研究動機 1 1.2 研究目的 2 1.3 研究範圍與限制 2 1.4 研究流程與研究架構 3 1.4.1 研究流程 3 1.4.2 研究架構 5 第二章 文獻回顧 6 2.1 機電系統架構與特性 6 2.2 機電系統界面與衝突 7 2.2.1 現行二維圖面整合 9 2.2.2 機電系統衝突排除方式 10 2.3 建築資訊模型 12 2.3.1 建築資訊模型發展程度(Level of Development) 13 2.3.2 建築資訊模型機電管線佈線準則 14 2.3.3 建築資訊模型視覺化應用 14 2.4 小結 15 第三章 導入BIM於案例應用 16 3.1 案例簡述 16 3.2 案例BIM模型建置 17 3.2.1 案例模型建置方法 18 3.2.2 管線建置高程準則 19 3.3 應用建築資訊模型輔助2D圖面檢核之優勢 20 3.4 應用BIM進行機電系統衝突檢測 22 3.4.1 衝突檢測軟體選用 22 3.4.2 Navisworks 衝突檢測應用 23 3.4.3 Navisworks干涉檢查報告 25 3.4.4 衝突元件選取方法 25 3.4.5 應用BIM進行機電系統衝突檢測流程 28 3.5 案例導入BIM遭遇困難 29 3.6 小結 30 第四章 機電管線衝突分類與排除流程 31 4.1 衝突交會模式分類 31 4.2 界面元件分類 32 4.2.1 機土界面衝突元件分類 32 4.2.2 機機界面衝突元件分類 35 4.3 機電衝突排除對策 37 4.3.1 衝突交會模式在機機界面 37 4.3.2 衝突交會模式在機土界面 43 4.3.3 衝突對策總整 53 4.4 建構機電衝突排除流程 55 4.5 小結 58 第五章 案例應用機電衝突排除流程 59 5.1 案例衝突狀況 59 5.2 分類案例衝突 60 5.2.1 結合衝突交會模式與界面元件分類 61 5.3 機電衝突排除流程適用性探討 62 5.3.1 搭配視覺化圖像進行作業 62 5.3.2 衝突元件選取修正 63 5.4 小結 64 第六章 結論與建議 65 6.1 結論 65 6.2 後續研究建議 66 參考文獻 67 | |
dc.language.iso | zh-TW | |
dc.title | 應用建築資訊模型建置機電系統衝突排除方法之研究 | zh_TW |
dc.title | BIM Application for Identification and Elimination of Electrical and Mechanical Conflicts in Building Construction | en |
dc.type | Thesis | |
dc.date.schoolyear | 105-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 曾仁杰,張智元 | |
dc.subject.keyword | 機電工程,建築資訊模型,衝突檢討,界面整合,視覺化, | zh_TW |
dc.subject.keyword | MEP,BIM,conflicts elimination,interface integration,visualization, | en |
dc.relation.page | 69 | |
dc.identifier.doi | 10.6342/NTU201701419 | |
dc.rights.note | 未授權 | |
dc.date.accepted | 2017-07-10 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-106-1.pdf 目前未授權公開取用 | 5.57 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。