Skip navigation

DSpace

機構典藏 DSpace 系統致力於保存各式數位資料(如:文字、圖片、PDF)並使其易於取用。

點此認識 DSpace
DSpace logo
English
中文
  • 瀏覽論文
    • 校院系所
    • 出版年
    • 作者
    • 標題
    • 關鍵字
    • 指導教授
  • 搜尋 TDR
  • 授權 Q&A
    • 我的頁面
    • 接受 E-mail 通知
    • 編輯個人資料
  1. NTU Theses and Dissertations Repository
  2. 工學院
  3. 工業工程學研究所
請用此 Handle URI 來引用此文件: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/16544
完整後設資料紀錄
DC 欄位值語言
dc.contributor.advisor王銘宗
dc.contributor.authorHsin-Yu Kuoen
dc.contributor.author郭欣羽zh_TW
dc.date.accessioned2021-06-07T18:20:00Z-
dc.date.copyright2012-02-16
dc.date.issued2012
dc.date.submitted2012-01-12
dc.identifier.citationArmbrust, M., Fox, A., Griffith, R., Joseph, A. D., Katz, R. H., Konwinski, A., . . . Stoica, I. (2009). Above the clouds: A berkeley view of cloud computing. EECS Department, University of California, Berkeley, Tech. Rep. UCB/EECS-2009-28.
Albayrak, E., & Erensal, Y. C. (2004). Using analytic hierarchy process (AHP) to improve human performance: An application of multiple criteria decision making problem. Journal of Intelligent Manufacturing, 15(4), 491-503. doi: 10.1023/B:JIMS.0000034112.00652.4c
Arora, A., & Gambardella, A. (2004). The globalization of the software industry: perspectives and opportunities for developed and developing countries: National Bureau of Economic Research Cambridge, Mass., USA.
Axelsson, J. (2010). Towards a process maturity model for evolutionary architecting of embedded system product lines.
Basili, V. R., & Rombach, H. D. (1988). The TAME project: Towards improvement-oriented software environments. Software Engineering, IEEE Transactions on, 14(6), 758-773.
Beath, C. M. (1987). Managing the user relationship in information systems development projects: A transaction governance approach.
Becker, P., Lew, P., & Olsina, L. (2011). Strategy to improve quality for software applications: a process view. Paper presented at the Proceedings of the 2011 International Conference on on Software and Systems Process, Waikiki, Honolulu, HI, USA.
Bititci, U. S., Turner, U. T., & Begemann, C. (2000). Dynamics of performance measurement systems. International Journal of Operations & Production Management, 20(6), 692-704.
Boehm, B. W., Brown, J. R., & Lipow, M. (1976). Quantitative evaluation of software quality. Paper presented at the Proceedings of the 2nd international conference on Software engineering, San Francisco, California, United States.
Briand, L. C., Wüst, J., Daly, J. W., & Victor Porter, D. (2000). Exploring the relationships between design measures and software quality in object-oriented systems.Journal of Systems and Software, 51(3), 245-273. doi: 10.1016/s0164-1212(99)00102-8
Bruegge, B., & Dutoit, A. H. (2009). Object-oriented software engineering using UML, patterns, and Java: Prentice Hall Press.
Cavano, J. P., & McCall, J. A. (1978). A framework for the measurement of software quality. Paper presented at the Proceedings of the software quality assurance workshop on Functional and performance issues.
Chan, A. P. C., & Chan, A. P. L. (2004). Key performance indicators for measuring construction success. Benchmarking: An International Journal, 11(2), 203-221.
Chen, M., & Wang, S. C. (2009). The Key Dimensions for Information Service Industry in Entering Global Market: A Fuzzy-Delphi & AHP Approach. Global Perspective for Competitive Enterprise, Economy and Ecology, 713-724.
Choudhury, V., & Sabherwal, R. (2003). Portfolios of control in outsourced software development projects. Information Systems Research, 14(3), 291.
Cross, K. F., & Lynch, R. L. (1988). The ¡§SMART¡¨ way to define and sustain success. National Productivity Review, 8(1), 23-33.
Curtis, B., Krasner, H., & Iscoe, N. (1988). A field study of the software design process for large systems. Commun. ACM, 31(11), 1268-1287. doi: 10.1145/50087.50089
Daniel, J. (2010). Empowering project portfolio managers: How management involvement impacts project portfolio management performance. International Journal of Project Management, 28(8), 818-831. doi: 10.1016/j.ijproman.2010.07.002
David A, G. Product quality: An important strategic weapon. Business Horizons, 27(3), 40-43. doi: 10.1016/0007-6813(84)90024-7
Duncan, W. (1996). A guide to the project management body of knowledge. Upper Darby, PA.
Faraj, S., & Sambamurthy, V. (2006). Leadership of information systems development projects. Engineering Management, IEEE Transactions on, 53(2), 238-249.
Fernandez, E. H. (2008). EMGT 835 FIELD PROJECT. University of Kansas.
Forker, L. B. (1991). Quality: American, Japanese, and Soviet Perspectives. The Executive, 5(4), 63-74.
Garcia, I. (2010). Using the Software Process Improvement approach for Defining a Methodology for Embedded Systems Development using the CMMI-DEV v1.2.
Ghalayini, A. M., & Noble, J. S. (1996). The changing basis of performance measurement. International Journal of Operations & Production Management, 16(8), 63-80.
Handfield, R., Walton, S. V., Sroufe, R., & Melnyk, S. A. (2002). Applying environmental criteria to supplier assessment: A study in the application of the Analytical Hierarchy Process. European Journal of Operational Research, 141(1), 70-87.
Harris, M. L., Collins, R. W., & Hevner, A. R. (2009). Control of flexible software development under uncertainty. Information Systems Research, 20(3), 400.
Hays, T., & Minichiello, V. (2005). The meaning of music in the lives of older people: A qualitative study. Psychology of Music, 33(4), 437.
Henderson-Sellers, B., & Edwards, J. M. (1990). The object-oriented systems life cycle. Commun. ACM, 33(9), 142-159. doi: 10.1145/83880.84529
Herbsleb, J., Zubrow, D., Goldenson, D., Hayes, W., & Paulk, M. (1997). Software quality and the Capability Maturity Model. Commun. ACM, 40(6), 30-40. doi: 10.1145/255656.255692
Ishikawa, A., Amagasa, M., Shiga, T., Tomizawa, G., Tatsuta, R., & Mieno, H. (1993). The max-min Delphi method and fuzzy Delphi method via fuzzy integration* 1. Fuzzy Sets and Systems, 55(3), 241-253.
Jaafari, A., & Manivong, K. (1998). Towards a smart project management information system. International Journal of Project Management, 16(4), 249-265. doi: 10.1016/s0263-7863(97)00037-9
Jaworski, B. J. (1988). Toward a theory of marketing control: environmental context, control types, and consequences. The Journal of Marketing, 23-39.
Kaplan, R. S., & Norton, D. P. (1996). Using the balanced scorecard as a strategic management system. Harvard business review, 74(1), 75-85.
Keeble, J. J., Topiol, S., & Berkeley, S. (2003). Using indicators to measure sustainability performance at a corporate and project level. Journal of Business Ethics, 44(2), 149-158.
Kettunen, P. (2003). Managing embedded software project team knowledge. Proceedings-Software, 150(6), 359-366.
Kirsch, L. J. (1996). The management of complex tasks in organizations: Controlling the systems development process. Organization Science, 1-21.
Kirsch, L. J., Sambamurthy, V., Ko, D. G., & Purvis, R. L. (2002). Controlling information systems development projects: The view from the client. Management Science, 484-498.
Kitchenham, B., & Pfleeger, S. L. (1996). Software quality: the elusive target [special issues section]. Software, IEEE, 13(1), 12-21.
Kwak, Y. H., & Ibbs, C. W. (2002). Project Management Process Maturity (PM) Model. Journal of Management in Engineering, 18, 150.
Laitenberger, O., & DeBaud, J. M. (2000). An encompassing life cycle centric survey of software inspection. Journal of Systems and Software, 50(1), 5-31.
Ma, Z., Shao, C., Ma, S., & Ye, Z. (2010). Constructing road safety performance indicators using Fuzzy Delphi Method and Grey Delphi Method. Expert Systems with Applications.
MacDougall, C., & Fudge, E. (2001). Planning and recruiting the sample for focus groups and in-depth interviews. Qualitative Health Research, 11(1), 117.
MacLachlan, L., & Pantry, S. (1996). Making project management work for you.
Marcal, A. S. C., de Freitas, B. C. C., Furtado Soares, F., & Belchior, A. D. (2007). Mapping cmmi project management process areas to scrum practices.
Marr, B., Schiuma, G., & Neely, A. (2004). Intellectual capital¡Vdefining key performance indicators for organizational knowledge assets. Business Process Management Journal, 10(5), 551-569.
Matson, J. E., Barrett, B. E., & Mellichamp, J. M. (1994). Software development cost estimation using function points. Software Engineering, IEEE Transactions on, 20(4), 275-287.
Medori, D., & Steeple, D. (2000). A framework for auditing and enhancing performance measurement systems. International Journal of Operations & Production Management, 20(5), 520-533.
Nurmuliani, N., Zowghi, D., & Powell, S. (2004). Analysis of requirements volatility during software development life cycle.
Ouchi, W. G. (1978). The transmission of control through organizational hierarchy. Academy of Management Journal, 173-192.
Parthasarathy, B., & Aoyama, Y. (2006). From software services to R&D services: local entrepreneurship in the software industry in Bangalore, India. Environment and Planning A, 38(7), 1269-1285.
Paulen, B., & Finken, J. (2009). Key Performance Indicators
Pikkarainen, M., & Mantyniemi, A. (2006). An approach for using CMMI in agile software development assessments: experiences from three case studies.
Pino, F. J., Baldassarre, M. T., Piattini, M., & Visaggio, G. (2010). Harmonizing maturity levels from CMMI DEV and ISO/IEC 15504. Journal of Software Maintenance and Evolution: Research and Practice, 22(4), 279-296.
Pro SQL Server 2008 Analytics (pp. 37-52): Apress.
Rajlich, V. T., & Bennett, K. H. (2000). A staged model for the software life cycle. Computer, 33(7), 66-71.
Reeves, C. A., & Bednar, D. A. (1994). Defining Quality: Alternatives and Implications. The Academy of Management Review, 19(3), 419-445.
Roger, A. (1999). Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management, 17(6), 337-342. doi: 10.1016/s0263-7863(98)00069-6
Rothenberger, M. A., Kao, Y.-C., & Van Wassenhove, L. N. (2010). Total quality in software development: An empirical study of quality drivers and benefits in Indian software projects. [doi: 10.1016/j.im.2010.10.001]. Information & Management, 47(7-8), 372-379.
Roudies, P. O. (2011). ¡E Maturity of information systems through CMMI and ITIL. International Journal of Mathematical Archive (IJMA), 2(8).
Royce, W. W. (1970). Managing the development of large software systems.
Saaty, T. L. (1990). How to make a decision: the analytic hierarchy process. European Journal of Operational Research, 48(1), 9-26.
Saxenian, A. L. (2002). The Silicon Valley connection: transnational networks and regional development in Taiwan, China and India. Science Technology & Society, 7(1), 117.
Saxenian, A. L. (2003). Government and guanxi: The Chinese software industry in transition.
Vaidya, O. S., & Kumar, S. (2006). Analytic hierarchy process: An overview of applications. European Journal of Operational Research, 169(1), 1-29.
Venkatraman, N., & Ramanujam, V. (1986). Measurement of business performance in strategy research: A comparison of approaches. Academy of management review, 801-814.
Wang, R. Y. (1998). A product perspective on total data quality management. Commun. ACM, 41(2), 58-65. doi: 10.1145/269012.269022
Yeh, C. (2010). The Effects of Practical Implementation Degree of CMMI-DEV Process Areas on the Performance Category of Software Process Improvement from Acquirers' Perspective.
Yuan-Feng, W. (2009). An effectiveness measurement model for knowledge management. [doi: 10.1016/j.knosys.2009.02.007]. Knowledge-Based Systems, 22(5), 363-367.
Yuen, K. K. F., & Lau, H. C. W. (2011). A fuzzy group analytical hierarchy process approach for software quality assurance management: Fuzzy logarithmic least squares method. [doi: 10.1016/j.eswa.2011.02.057]. Expert Systems with Applications, 38(8), 10292-10302.
Zahedi, F. (1986). The analytic hierarchy process: a survey of the method and its applications. Interfaces, 96-108.
Zhiqiang, J., Xilan, F., Xianzhang, F., & Jinfa, S. (2011). A Study of the Demonstration on KPI performance Examination for Aviation SP Enterprise of XAC. Computing and Intelligent Systems, 453-464.
Aaker, D. A. (1996). Building strong brands: Free Press New York.
Ahmad, M. M., & Dhafr, N. (2002). Establishing and improving manufacturing performance measures. Robotics and Computer-Integrated Manufacturing, 18(3-4), 171-176.
Ailawadi, K. L., Lehmann, D. R., & Neslin, S. A. (2003). Revenue premium as an outcome measure of brand equity. Journal of Marketing, 67(4), 1-17.
Al-Harbi, K. M. (2001). Application of the AHP in project management. International Journal of Project Management, 19(1), 19-27.
Albayrak, E., & Erensal, Y. C. (2004). Using analytic hierarchy process (AHP) to improve human performance: an application of multiple criteria decision making problem. Journal of intelligent Manufacturing, 15(4), 491-503.
Ambler, T., & Banvise, P. (1998). The trouble with brand valuation. Journal of Brand Management, 5, 367-377.
Anderson, E. W., Fornell, C., & Lehmann, D. R. (1994). Customer satisfaction, market share, and profitability: findings from Sweden. The Journal of Marketing, 58(3), 53-66.
Applebaum, W. (1966). Methods for determining store trade areas, market penetration, and potential sales. Journal of Marketing Research, 3(2), 127-141.
Atkinson, R. (1998). The life story interview (Vol. 44): Sage Publications, Inc.
Berger, P. G., & Hann, R. N. (2007). Segment profitability and the proprietary and agency costs of disclosure. Accounting Review, 82(4), 869.
Berkowitz, E. N., & Flexner, W. A. (1978). The marketing audit: a tool for health service organizations. Health Care Management Review, 3(4), 51.
Berry, L. L., Conant, J. S., & Parasuraman, A. (1991). A framework for conducting a services marketing audit. Journal of the Academy of Marketing Science, 19(3), 255-268.
Bowersox, D. J., & Calantone, R. J. (1998). Global logistics. Journal of International Marketing, 6(4), 83-93.
Bradley, F. (2005). International marketing strategy: Pearson Education.
Brindley, W. A., & Peter, K. L. (1998). A war room can be heaven. Journal of Business Strategy.
Chan, A. P. C., & Chan, A. P. L. (2004). Key performance indicators for measuring construction success. Benchmarking: An International Journal, 11(2), 203-221.
Clark, B. H. (1999). Marketing performance measures: history and interrelationships. Journal of Marketing Management, 15(8), 711-732.
Cohen, M. A., & Lee, H. L. (1989). Resource deployment analysis of global manufacturing and distribution networks. Journal of Manufacturing and Operations Management, 2(2), 81-104.
Collin, J. (2002). Measuring the success of building projects¡Vimproved project delivery initiatives. Report for the Queensland Department of Public Works, Australia.
Cooper, M. C., Lambert, D. M., & Pagh, J. D. (1997). Supply chain management: more than a new name for logistics. International Journal of Logistics Management, The, 8(1), 1-14.
Council of Logistics Management. (1986). What is it All About?
Davies, J. (2005). Magic Numbers for Consumer Marketing: Key Measures to Evaluate Marketing Success.
DeBusk, G. K., Brown, R. M., & Killough, L. N. (2003). Components and relative weights in utilization of dashboard measurement systems like the Balanced Scorecard. The British Accounting Review, 35(3), 215-231. doi: Doi: 10.1016/s0890-8389(03)00026-x
Denzin, N. K. (2001). Interpretive interactionism (Vol. 16): Sage Publications, Inc.
Douglas, J. D. (1976). Investigative social research: Individual and team field research: Sage Publications Beverly Hills, CA.
Evans, H., Ashworth, G., Chellew, M., Davidson, A., & Towers, D. (1996). Exploiting activity-based information: easy as ABC? MANAGEMENT ACCOUNTING-LONDON-, 74, 24-31.
Folting, A., Netz, A., Tupaj, K., & Collie, R. C. (2006). Graphical representation of key performance indicators: US Patent App. 20,070/174,228.
Fontana, A., & Frey, J. H. (1994). Interviewing: The art of science.
Gourdin, K. N. (2006). Global logistics management: a competitive advantage for the 21st century: Wiley-Blackwell.
Gubrium, J. F., & Holstein, J. A. (2002). Handbook of interview research: Context & method: Sage Publications, Inc.
Handfield, R., Walton, S. V., Sroufe, R., & Melnyk, S. A. (2002). Applying environmental criteria to supplier assessment: A study in the application of the Analytical Hierarchy Process. European Journal of Operational Research, 141(1), 70-87.
Hayes, R. H., & Wheelwright, S. C. (1984). Restoring our competitive edge: competing through manufacturing: John Wiley & Sons Inc.
Holstein, J. A., & Gubrium, J. F. (1995). The active interview (Vol. 37): Sage Publications, Inc.
Holstein, W. J., Reed, S., Kapstein, J., Vogel, T., & Weber, J. (1990). The stateless corporation. Business Week, 3159.
Hsieh, T.-M. (2005). A Study on Demand-Supply Coordination of the Headquarters with Reference to the NoteBook Industry Case. [Master Thesis].
Innis, D. E., & La Londe, B. J. (1994). Customer service: the key to customer satisfaction, customer loyalty, and market share. Journal of Business Logistics, 15, 1-1.
Jan, P. H. (1993). Building a Business Intelligence System. [DOI: 10.1108/eb039219]. Journal of Business Strategy, 9(3), 4-9.
Johnson, C. (1980). Constructive critique of a hierarchical prioritization scheme employing paired comparisons.
Jordan, W. C., & Graves, S. C. (1995). Principles on the benefits of manufacturing process flexibility. Management Science, 577-594.
Keller, K. L. (1993). Conceptualizing, measuring, and managing customer-based brand equity. The Journal of Marketing, 57(1), 1-22.
Kettinger, W. J., Grover, V., Guha, S., & Segars, A. H. (1994). Strategic Information Systems Revisited: A Study in Sustainability and Performance. MIS Quarterly, 18(1), 31-58.
Kopkin, B. (2004). Key performance redefined. PULP AND PAPER-BRISTOL THEN SKOKIE THEN SAN FRANCISCO-, 78(3), 55-55.
Kotler, N. G., Kotler, P., & Kotler, W. I. (1998). Museum strategy and marketing: Designing missions, building audiences, generating revenue and resources: Jossey-Bass Publishers.
Kotler, P., Gregor, W., & Rodgers, W. (1977). The marketing audit comes of age. Sloan Management Review, 18(2), 25-43.
Kvale, S. (1996). Interviews: An introduction to qualitative research interviewing: Sage Publications, Inc.
Lassar, W., Mittal, B., & Sharma, A. (1995). Measuring customer-based brand equity. Journal of Consumer Marketing, 12(4), 11-19.
Lederer, A. L., & Sethi, V. (1988). The Implementation of Strategic Information Systems Planning Methodologies. MIS Quarterly, 12(3), 445-461.
Legard, R., Keegan, J., & Ward, K. (2003). In-depth interviews. Qualitative research practice: A guide for social science students and researchers, 138-169.
Lewis, I., & Talalayevsky, A. (1997). Logistics and information technology: a coordination perspective. Journal of Business Logistics, 18(I), 141-157.
Lofland, J., & Lofland, L. H. (1984). Analyzing social settings: A guide to qualitative observation and analysis.
Lu, L. X., & Van Mieghem, J. A. (2009). Multimarket facility network design with offshoring applications. Manufacturing & Service Operations Management, 11(1), 90-108.
Mabert, V. A., Soni, A., & Venkataramanan, M. A. (2003). Enterprise resource planning: Managing the implementation process. European Journal of Operational Research, 146(2), 302-314. doi: Doi: 10.1016/s0377-2217(02)00551-9
Mahajan, V., Muller, E., & Bass, F. M. (1990). New product diffusion models in marketing: A review and directions for research. The Journal of Marketing, 1-26.
Mokwa, M. P. (1993). The strategic marketing audit: An adoption/utilization perspective. Journal of Business Strategy, 6(4), 88-95.
Naylor, J., & Wood, A. (1978). Practical marketing audits: A guide to increased profitability: Wiley.
Payne, A. F. (1988). Developing a marketing-oriented organization. Business Horizons, 31(3), 46-53.
Peppers, D., & Rogers, M. (1993). A new marketing paradigm: share of customer, not market share. Strategy & Leadership, 23(2), 14-18.
Premkumar, G., & King, W. R. (1994). The evaluation of strategic information system planning. Information & Management, 26(6), 327-340. doi: Doi: 10.1016/0378-7206(94)90030-2
Reh, F. J. (2008). Key performance indicators (KPI). Retrieved January.
Reichheld, F. F. (1994). Loyalty and the renaissance of marketing. Marketing Management, 2(4), 10-21.
Ritchie, J., & Lewis, J. (2003). Qualitative research practice: A guide for social science students and researchers: Sage Publications Ltd.
Rubin, H. J., & Rubin, I. (2005). Qualitative interviewing: The art of hearing data: Sage Publications, Inc.
Saaty, T. L. (1980). The analytical hierarchy process: McGraw-Hill, New York.
Saaty, T. L. (1990). How to make a decision: the analytic hierarchy process. European Journal of Operational Research, 48(1), 9-26.
Samiee, S., & Roth, K. (1992). The influence of global marketing standardization on performance. The Journal of Marketing, 56(2), 1-17.
Segars, A. H., & Grover, V. (1998). Strategic Information Systems Planning Success: An Investigation of the Construct and Its Measurement. MIS Quarterly, 22(2), 139-163.
Seidel, T. (2006). Integrating static scenario comparison and dynamic simulation: a combined methodology for supply chain design.
Seidman, I. (1998). Interviewing as qualitative research: Teachers College Press New York.
Shaker, S. M. (2002). Lessons learned from war room designs and implementations: DTIC Document.
Shieh, S.-Y. (2008). A war room desogn for flower supplay chains in taiwan. Thesis, 76.
Shuchman, A. (1959). The marketing audit: Its nature, purposes, and problems. Analyzing and Improving Marketing Performance, Report No, 32, 13.
Slats, P. A., Bhola, B., Evers, J. J. M., & Dijkhuizen, G. (1995). Logistic chain modelling. European Journal of Operational Research, 87(1), 1-20.
Taghian, M., & Shaw, R. N. (2002). The marketing audit and business performance: an empirical study of large Australian companies.
Teas, R. K. (1993). Expectations, performance evaluation, and consumers' perceptions of quality. The Journal of Marketing, 57(4), 18-34.
Vaidya, O. S., & Kumar, S. (2006). Analytic hierarchy process: An overview of applications. European Journal of Operational Research, 169(1), 1-29.
Venkatraman, N., & Ramanujam, V. (1986). Measurement of business performance in strategy research: A comparison of approaches. The Academy of Management Review, 11(4), 801-814.
Voortman, C. (2004). Global Logistics Management: Juta & Company.
Walls, J. G. (2001). Building an Information System Design Theory for Vigilant EIS. Information System Research.
Zahedi, F. (1986). The analytic hierarchy process: a survey of the method and its applications. Interfaces, 96-108.
Barney, J. B. (1986). 'Organizational Culture: Can It Be a Source of Sustained Competitive Advantage?' The Academy of Management Review11(3): 656-665.
Chen, E. J., Y. M. Lee, et al. (2002). 'A simulation study of logistics activities in a chemical plant.' Simulation Modelling Practice and Theory10(3-4): 235-245.
Chynoweth, E. and R. Mullin (1992). 'ISO 9000: Providing the Basis for Quality-Industry Cleaves to an International Standard.' Chemical Week150(17): 30-30.
Denison, D. R. (1996). 'What is the Difference between Organizational Culture and Organizational Climate? A Native's Point of View on a Decade of Paradigm Wars.' The Academy of Management Review21(3): 619-654.
Deshpande, R. and F. E. Webster, Jr. (1989). 'Organizational Culture and Marketing: Defining the Research Agenda.' The Journal of Marketing53(1): 3-15.
Hannan, M. T. and J. Freeman (1984). 'Structural Inertia and Organizational Change.' American Sociological Review49(2): 149-164.
Heizer, J. and B. Render (1996). Production & operations management, Prentice Hall.
Hendricks, K. B. and V. R. Singhal (1997). 'Does Implementing an Effective TQM Program Actually Improve Operating Performance? Empirical Evidence from Firms That Have Won Quality Awards.' Management Science43(9): 1258-1274.
Iii, C. A. O. R., J. Chatman, et al. (1991). 'People and Organizational Culture: A Profile Comparison Approach to Assessing Person-Organization Fit.' The Academy of Management Journal34(3): 487-516.
Kast, F. E. and J. E. Rosenzweig (1985). Organization and management: A systems and contingency approach, McGraw-Hill.
Krajewski, L. J., L. P. Ritzman, et al. (1996). 'Operations management: strategy and analysis.'
March, J. G. (1981). 'Footnotes to Organizational Change.' Administrative Science Quarterly26(4): 563-577.
Markland, R. E., S. K. Vickery, et al. (1998). 'Operations management: Concepts in manufacturing and services.'
Samson, D. and M. Terziovski (1999). 'The relationship between total quality management practices and operational performance.' Journal of Operations Management17(4): 393-409.
Saraiva, P. M. and R. Costa (2004). 'A Chemical Product Design Course with a Quality Focus.' Chemical Engineering Research and Design82(11): 1474-1484.
Schein, E. H. (1996). 'Culture: The missing concept in organization studies.' Administrative Science Quarterly41(2).
Swiss, J. E. (1992). 'Adapting Total Quality Management (TQM) to Government.' Public Administration Review52(4): 356-362.
Wilkins, A. L. and W. G. Ouchi (1983). 'Efficient Cultures: Exploring the Relationship Between Culture and Organizational Performance.' Administrative Science Quarterly28(3): 468-481.
Wruck, K. H. and M. C. Jensen (1994). 'Science, specific knowledge, and total quality management.' Journal of Accounting and Economics18(3): 247-287
dc.identifier.urihttp://tdr.lib.ntu.edu.tw/jspui/handle/123456789/16544-
dc.description.abstract關鍵績效指標可用以測量組織、團隊、或個人之績效表現,為了讓評定角度與結果更為客觀可行,在指標遴選的原則、過程與排序皆需考量各層面且經重重思考、審定與不斷檢核。品質一向被視為是產品的重要特性,近年來已有多篇文獻探討其演進之歷程與效益,公司或組織團隊投注心力於提高品質之重要性不言可喻。品質可望經由良好的管理模式達到組織及專案所預期或設計的優秀表現。而在實體產品、高科技產品,甚至於較為抽象的軟體產品中,對於品質的要求皆不完全一致。從目前仍眾說紛紜、尚未達成普遍共識的品質定義來看,從行銷佈局策劃、產品研發設計等面向,如何達成公司組織、研發團隊與顧客夥伴等多方共識下之優良品質,仍有賴相關研究與實務面的持續耕耘。
本文將以三大篇幅探討績效指標與品質管理相關議題,前兩篇分別以軟體專案管理及全球運籌行銷管理為主軸,探討其關鍵績效指標的遴選與排序;第三篇則探討個案公司推行ISO9000後,對其進行全面品質管理的各項因子之影響,以下為各篇目所探討之內容簡介:
一、探討軟體研發時,在提升專案管理成熟度及改善軟體品質的考量下,以專案負責人角度進行重要指標遴選與排序,研究對象為臺灣獲得 CMMI 認證公司之軟體專案經理,根據本篇研究結果,對國內軟體公司提出可加強關注之面向與管理實作建議。
二、從全球具備多事業單位之公司角度與資深行銷主管及學者的共識,探討企業總部規劃行銷策略之績效指標遴選與排序,本研究提出四大構面,並於其下遴選出重要指標再進行權重排序,以作為相關個案公司實務面之參考。
三、公司推行 ISO9000後,對企業組織文化造成的影響探討,並更進一步了解其對於整體企業落實全面品質管理的效益為何,根據研究結果顯示,高階主管親身投入參與、組織認同感、與良好的激勵制度將可帶來正面的影響。
關鍵詞:關鍵績效指標 (KPI)、品質、專案管理、行銷、全面品質管理 (TQM)
zh_TW
dc.description.abstractKey performance indicators (KPI) can be used to evaluate the performance of a specific organization, team, or individual. To make the indicators more objective and realistic, the principle, process, and prioritization of indicator determination should be considered thoroughly and checked continuously. Quality has been viewed as one of the most important property of products, and there‟ve been considerable quantity of literature reviewng and dicussing the development and benefit. The importance of the effort to enhance product quality is beyond description. Quality could reach the designed or expected performance by well management. In addition, the demands of quality in physical, hi-tech, and intangible software products are not totally consistent. Given the divergent definitions of quality, how to achieve the consensus of excellent quality viewed by the company, R&D team, and customers in marketing strategy and product development has to be explored by further academic and emprical researches.The thesis is divided into 3 portions; the previous 2 discuss the determination and prioritization of KPI in the topic of software project management and global marketing management, respectively. The 3rd explores the influence of ISO9000 certification on Total Quality Management (TQM). The followings are brief introduction to each paper.
1. From the viewpoint of project managers in CMMI Certified Company, this research is expected to propose perspectives or factors that should be concerned more and also to offer some practical management suggestions.
2. With the consensus of senior marketing supervisors and scholars, this research explores the important indicators of global marketing strategy in headquarters and proposes 4 perspectives to classified relevant indicators.
3. This research explores the effect of ISO9000 directly on TQM implementation and also the effect through organizational culture change. Based on the research result, involvement of high-leveled supervisors, organization identification and encouragement are expected to bring about positive influence.
Keywords: Key Performance Indicator (KPI), Quality, Project Management, Marketing, Total Quality Management (TQM)
en
dc.description.provenanceMade available in DSpace on 2021-06-07T18:20:00Z (GMT). No. of bitstreams: 1
ntu-101-R97546012-1.pdf: 1156574 bytes, checksum: 8a369c9d3aef68184b7b810e001d6bf3 (MD5)
Previous issue date: 2012
en
dc.description.tableofcontents1 An Empirical Study on the Reference Model of the Determination and Prioritization of KPIs in Software Development Project Management from CMMI Certified Company's Viewpoint ...............7
1.1 Introduction...............9
1.2 Literature Review...............14
1.3 Methodologies...............30
1.4 Results and Findings...............44
1.5 Conclusions...............51
1.6 Limitation and Future Research...............56
1.7 References...............58
1.8 Appendix ...............63
2 A Hybrid MCDM Approach to the Determination and Prioritization of KPI – An Empirical Case Study of EWR's Marketing Business Unit from the Headquarters' Viewpoint ...............85
2.1 Introduction...............87
2.2 Literature Review...............91
2.3 Methodologies...............98
2.4 Results and Findings...............110
2.5 Conclusions...............117
2.6 References...............120
3 An Empirical Study of the Influence of ISO9000 Certification on TQM Implementation in Chemical Industry ...............125
3.1 Introduction...............127
3.2 Literature Review...............129
3.3 Methodology...............134
3.4 Case Study...............139
3.5 Research Findings and Discussion...............144
3.6 Conclusion...............148
3.7 References...............150
dc.language.isoen
dc.subject品質zh_TW
dc.subject關鍵績效指標 (KPI)zh_TW
dc.subject專案管理zh_TW
dc.subject行銷zh_TW
dc.subject全面品質管理 (TQM)zh_TW
dc.subjectTotal Quality Management (TQM)en
dc.subjectKey Performance Indicator (KPI)en
dc.subjectQualityen
dc.subjectProject Managementen
dc.subject Marketingen
dc.title關鍵績效指標與品質管理相關議題探討zh_TW
dc.titleA Study on Related Issues of Key Performance Indicators and Quality Managementen
dc.typeThesis
dc.date.schoolyear100-1
dc.description.degree碩士
dc.contributor.oralexamcommittee游喜賢,王雯宗,李滄修,余宏揚,陳聰傑
dc.subject.keyword關鍵績效指標 (KPI),品質,專案管理,行銷,全面品質管理 (TQM),zh_TW
dc.subject.keywordKey Performance Indicator (KPI),Quality,Project Management, Marketing,Total Quality Management (TQM),en
dc.relation.page152
dc.rights.note未授權
dc.date.accepted2012-01-12
dc.contributor.author-college工學院zh_TW
dc.contributor.author-dept工業工程學研究所zh_TW
顯示於系所單位:工業工程學研究所

文件中的檔案:
檔案 大小格式 
ntu-101-1.pdf
  未授權公開取用
1.13 MBAdobe PDF
顯示文件簡單紀錄


系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved