請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/9278
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 郭斯傑(Sy-Jye Guo) | |
dc.contributor.author | Yung-Min Tu | en |
dc.contributor.author | 杜詠珉 | zh_TW |
dc.date.accessioned | 2021-05-20T20:15:41Z | - |
dc.date.available | 2009-07-21 | |
dc.date.available | 2021-05-20T20:15:41Z | - |
dc.date.copyright | 2009-07-21 | |
dc.date.issued | 2009 | |
dc.date.submitted | 2009-07-09 | |
dc.identifier.citation | •王志鏞、胡宜仁,「業主主控保險計畫」,淡江大學保險經營研究所,2004
•石浩吉,「建築師工程師專業責任保險-承保範圍與投保策略之研究」台灣大學土木工程學研究所碩士論文2004 •杜辰生、邱美玲等人,「工程保險第一輯」,財團法人保險事業發展中心,2004 •何守東,「國際再保公司卻步台灣市場」,營建知訊第287期,頁63-68,2006 •何臺生,「工程保險保費上漲營造業因應之道」,營造天下80期,頁4-6,2002 •何臺生,「從保險原理探討國內公共工程營造險」,營建管理季刊第53期,頁49-54,2002 •何臺生,「淺談工程保險之要保人,被保險人及受益人」,營造天下第79期 •何臺生,「營造工程綜合保險理賠爭議探討」,營造天下95_96卷期,頁46-52,2003 •李牧軒,「台灣地區建築師專業責任保險之研究」國立台灣大學土木工程學研究所碩士論文,2001 •林連輝,「鄰屋保險之研究」國立台灣大學土木工程學研究所碩士論文,2005 •邱必洙、郭斯傑,「讀者評論:[何臺生]〈從保險原理探討國內公共工程營造險〉」,營建管理季刊第55期,頁55-57,2003 •徐積圓、姚乃嘉,「公共工程合約保險條款之探討」,營建管理季刊第36期,頁29-37,1998 •郭斯傑等人,「建立公共建設工程保險機制之研究」,行政院公共工程委員會研究報告,2002.12 •許禎祐,「水利工程保險現況與制度之研究 以水利署為例」,國立台灣大學土木工程學研究所碩士論文,2007 •張瓊婷,「洪水風險交易制度之建構與分析」,聯合國教科文組織水利/水資源教育機構 •黃亦駿「高科技廠房安裝工程綜合保險之研究」國立台灣大學土木工程學研究所碩士論文,2008 •楊尊堡,「政府辦理工程保險機構可行性」,中興大學土木工程研究所碩士論文,2004 •蔡逸霖,「經驗修正係數在營造綜合保險之研究」,台灣大學土木工程學研究所碩士論文,1999 •劉福標,台灣營建研究院,「工程保險實務」,營造工程保險計畫,頁52-86,1997 •賴建榮,「營造工程業主主控保險計畫之研究」台灣大學土木工程學研究所碩士論文,1999 •歐春吉,「洪水損失評估模式之建立及其保險制度上之應用」國立中央大學土木工程研究所,2004 •謝芳宜,「營造工程財物損失險保險金額釐訂之研究」淡江大學保險學系保險經營研究所,2002 •Bird, G.E.( 1995), The WRAP-UP Guide—Second Edition, International Risk Management Institute, Inc. Dallas, Texas. •Candace, P.H.( 1997), “Design/Build Insurance: Filling in the Gapes ,” ASCE, Vol.67, NO..9, pp. 56-59. •Harrington, S. E. and Niehaus,G. R. (1999), Risk management and insurance, McGraw-Hill, Boston, MA, U.S.A., pp. 8, 10-13, 271, 281. •Odeyinka, H.A. (2000), “An evaluation of the use of insurance in managing construction risks,” Construction Management and Economics, Vol. 18, pp. 519 •Schexnayder, Cliff J.(2004) “Transportation Agency Use of Owner-Controlled Insurance Programs,” Journal of Construction Engineering and Management , ASCE, Vol.130, NO.4, pp. 517-524. •中央氣象局網站:http://www.cwb.gov.tw/ •財團法人保險事業發展中心網站:http://www.tii.org.tw/index.asp •經濟部水利署網站:http://www.wra.gov.tw/default.asp •財團法人工程保險協進會: http://www.eia.org.tw/ | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/9278 | - |
dc.description.abstract | 「營造綜合工程保險」乃因營造工程風險極高、個案異質性懸殊,且承保條件限制多,無法用「大數法則」作歸納統計去訂定費率,亦難以適用於一般保險學的基本原理。且近年來由於台灣天災人禍頻傳,台灣營造工程已被大部分國際保險公司列為高風險「黑名單」,使得國際再保公司不是撤離台灣工程保險市場,就是提高承保門檻;再者,保險公司又以加貼附加條款作為手段,限制災損賠償金額,承包商為符業主合約要求也僅能勉強接受,否則將面臨無法承保之窘境。
承包商為降低費率而提高營造綜合工程保險自負額,雖然此問題已有所改善,但卻是以加貼縮限保障之附加條款作為替代。以水利工程常加貼133水利工程附加條款為例,規定儲物料需置放於高於過去廿年紀錄最高水位或發生頻率廿年一次洪水位以上之高地,最多只以三日內所需用量為限,若出險期間為六至十月,自負額都需乘以條款規定之倍數,對於儲物料規定實際施工面難以達成,自負額加乘倍數亦限縮了被保險人的保障權益,許多附加條款規定皆有規避工程主風險之虞,本研究以最難覓保的水利工程為例,歸納統計某產險公司2006至2009年間50份水利工程保單,以其常加貼之附加條款為探討主軸,針對保單內影響被保險人權益的最深的費率、自負額、附加條款和保單內容等加以論述及探討,50份保單內包含了三件出險案例,並以此三件出險案例,闡述目前水利工程保險常加貼之附加條款,對於案件出險所產生之影響。 本研究係以水利工程險保單為例,針對較常出現之附加條款的合理性為主要探討內容,除暸解水利工程保險制度現況外,並就爭議性條款之費率結構等作一概括性探討。彙整目前水利工程保險制度與現況之困難,歸納三方對於現有附加條款之意見,提出增減刪修與合理性費率之建議。 | zh_TW |
dc.description.abstract | Engineering all risks insurance encounters difficulties in setting reasonable rates according to majority rule, and it is also hard to comply with the general insurance principles. A few factors contribute to the situation: high risks of engineering projects, large scale of differences in project uniqueness, and immense underwriting conditions. Due to frequent natural disasters and human-caused accidents, most international insurance companies keep Taiwanese engineering projects in their blacklist. It results in withdrawal of international reinsurance companies and lifted underwriting conditions. In addition, insurance companies attach endorsement clauses to limit damage compensation. In order to gain favor of the insurance company and the owner, and to avoid the loss of insurance, contractors have no choice but embracing the underwriting conditions and additional articles reluctantly.
Therefore, contractors often need to increase the insurance deducible to lower the rate. Even though efforts are made to improve the situation, endorsement clauses to limit coverage began to emerge as replacements. Take the Article 133 in hydropower projects regulations for example, it states materials to be stored in places no lower than the highest water line over the past twenty years or the flood water level of the flood occurring every twenty years. The compensation for materials is limited to the amount for three-day usage only. Furthermore, if the endangerment is between June and October, the deducible will increase by the multiple stated in the contract. In fact, there are many difficulties for engineering when it comes to the height of material storage; the multiplied deducible also cuts back on security of rights of the insured. This paper seeks examples in hydropower projects, which claims the most difficulties in gaining insurance, and calculates fifty policies of a certain insurance company between 2006 and 2009. The discussion will circulate about some common endorsement clauses in the policy and go further into details of rates, deducible, additional articles, and content of the policy which have the most effects on the insured. There will be 3 cases of endangerment in the fifty policies reviewed, and they will be the basis from which extends the discussion about how additional articles influence the endangerment. The reasonableness of additional articles will be the focal point of the paper, and then we shall go through a general discussion about the fee structure of the controversial articles. Through collecting information on insurance policies and difficulties of engineering, This paper will then contain the three parties’ opinions on present additional articles, and propose suggestions on article and rate adjustments. | en |
dc.description.provenance | Made available in DSpace on 2021-05-20T20:15:41Z (GMT). No. of bitstreams: 1 ntu-98-R96521705-1.pdf: 1549283 bytes, checksum: 24f96402cfea49f477b78f58a8d97a52 (MD5) Previous issue date: 2009 | en |
dc.description.tableofcontents | 目錄
第一章 緒論 1 1.1 研究動機與目的 1 1.1.1 研究動機 1 1.2 研究目的 2 1.3 研究範圍與限制 3 1.3.1 研究範圍 3 1.3.2 研究限制 3 1.4 研究方法 3 1.5 研究內容與流程 5 1.5.1 研究內容 5 1.5.2 研究流程 6 第二章 文獻回顧 7 2.1 營造綜合保險 7 2.1.1 營造綜合保險概述 7 2.1.2 我國營造綜合保險之現況 8 2.1.3 營造綜合保險之特性 8 2.2 營造綜合工程險覓保困難的原因 10 2.2.1 營造綜合保險實務上的主要問題點 10 2.2.2 營造綜合保險覓保困難的原因 11 2.3 水利工程保險目前現況問題 12 2.3.1 保險業者對於水利工程保險開價之判斷依據 12 2.3.2 業主、廠商及保險業者對於水利工程保險之意見 12 2.4 營造工程綜合保險實際概況 14 2.4.1 營造工程綜合保險 14 2.4.2 營造綜合保險之費率 15 2.4.3 營造綜合保險之自負額 18 2.4.4 費率和自負額之關係 20 2.5 工程險實務上業主保費編列方式 22 2.5.1 保費之編列 22 2.5.2 目前採行的保費編列方式 22 2.6 業主統保 25 2.6.1 業主統保之意義 25 2.6.2 傳統投保方式與業主主控保險計畫(業主統保)之比較 26 2.6.3 工程實務上採統保之案例 27 2.6.4 小結 28 第三章 水利工程保險現況 30 3.1 專家訪談 30 3.1.1 保險相關之專家訪談 30 3.1.2 業主專家訪談 33 3.1.3 廠商專家訪談 36 3.2 水利工程保險資料 37 3.2.1 水利工程保險代碼分類 38 3.2.2 基本資料分析 39 3.3 營造綜合保險之附加條款 41 3.3.1 附加條款性質 42 3.3.2 附加條款現況 43 3.4 本研究統計之常用附加條款 45 3.5 常用附加條款之探討 46 3.5.1 不影響保障權益常用之條款 46 3.5.2 影響保障權益較小之常用條款 51 3.5.3 影響保障權益最大之常用條款 53 第四章 案例分析 64 4.1 案例比較分析 64 4.2 本研究水利工程分類 66 4.2.1 依水利工程類型分類 66 4.2.2 依水利工程規模分類 68 4.2.3 依造工程規模分類之案例比較 69 4.2.4 依不同工程類型分類之工程案例比較 80 4.2.5 案例比較小結 88 4.3 理賠案例 92 4.3.1 理賠案例分析 92 4.3.2 案例理賠小結 95 第五章 結論與建議 96 5.1 結論 96 5.2 建議 97 參考文獻98 附錄100 | |
dc.language.iso | zh-TW | |
dc.title | 營造綜合工程保險附加條款之研究-以水利工程為例 | zh_TW |
dc.title | Endorsement Clauses in Engineering All Risks Insurance with Taiwan's Hydropower Project as Example. | en |
dc.type | Thesis | |
dc.date.schoolyear | 97-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 王維志,黃榮堯 | |
dc.subject.keyword | 工程保險,附加條款,自負額,水利工程, | zh_TW |
dc.subject.keyword | engineering insurance,endorsement clauses,deducible, | en |
dc.relation.page | 118 | |
dc.rights.note | 同意授權(全球公開) | |
dc.date.accepted | 2009-07-10 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-98-1.pdf | 1.51 MB | Adobe PDF | 檢視/開啟 |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。