請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/74387
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 洪一薰 | |
dc.contributor.author | Yu-Wei Hsiao | en |
dc.contributor.author | 蕭有為 | zh_TW |
dc.date.accessioned | 2021-06-17T08:33:05Z | - |
dc.date.available | 2024-08-13 | |
dc.date.copyright | 2019-08-13 | |
dc.date.issued | 2019 | |
dc.date.submitted | 2019-08-10 | |
dc.identifier.citation | Aglan, C., & Durmusoglu, M. B. (2015). Lot-splitting approach of a hybrid manufacturing system under CONWIP production control: a mathematical model. International Journal of Production Research, 53(5), 1561-1583.
Anand, G., & Kodali, R. (2009). Development of a framework for implementation of lean manufacturing systems. International Journal of Management Practice, 4(1), 95-116. Andreeva, N. (2009). Lean manufacturing performance-metrics and evaluation. In Proceedings of 18th national scientific and technical conference with international participation, Sofia, Bulgaria (pp. 414-419). Azzi, A., Faccio, M., Persona, A., & Sgarbossa, F. (2012). Lot splitting scheduling procedure for makespan reduction and machine capacity increase in a hybrid flow shop with batch production. The International Journal of Advanced Manufacturing Technology, 59(5-8), 775-786. Boysen, N., Fliedner, M., & Scholl, A. (2009). Production planning of mixed-model assembly lines: overview and extensions. Production Planning and Control, 20(5), 455-471. Cai, H., Ding, Y., & Zhang, Y. (2018). Lot Splitting and Job Shop Scheduling with Limited Buffer. In 2018 10th International Conference on Intelligent Human-Machine Systems and Cybernetics (IHMSC) (Vol. 2, pp. 222-225). IEEE. Chan, W. T., & Hu, H. (2002). Production scheduling for precast plants using a flow shop sequencing model. Journal of computing in civil engineering, 16(3), 165-174. Demeter, K., & Matyusz, Z. (2011). The impact of lean practices on inventory turnover. International Journal of Production Economics, 133(1), 154-163. Domingo, R., Alvarez, R., Melodía Peña, M., & Calvo, R. (2007). Materials flow improvement in a lean assembly line: a case study. Assembly Automation, 27(2), 141-147. Engin, O., & Döyen, A. (2004). A new approach to solve hybrid flow shop scheduling problems by artificial immune system. Future generation computer systems, 20(6), 1083-1095. Gholami, M., Zandieh, M., & Alem-Tabriz, A. (2009). Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns. The International Journal of Advanced Manufacturing Technology, 42(1-2), 189-201. Korkmazel, T., & Meral, S. (2001). Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems. European Journal of Operational Research, 131(1), 188-207. Liao, C. J., Tjandradjaja, E., & Chung, T. P. (2012). An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem. Applied Soft Computing, 12(6), 1755-1764. Lin, J. T., & Chen, C. M. (2015). Simulation optimization approach for hybrid flow shop scheduling problem in semiconductor back-end manufacturing. Simulation Modelling Practice and Theory, 51, 100-114. Lin, Y. K., Pfund, M. E., & Fowler, J. W. (2011). Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems. Computers & Operations Research, 38(6), 901-916. Lu, J. C., & Yang, T. (2015). Implementing lean standard work to solve a low work-in-process buffer problem in a highly automated manufacturing environment. International Journal of Production Research, 53(8), 2285-2305. Marichelvam, M. K., Prabaharan, T., & Yang, X. S. (2014). Improved cuckoo search algorithm for hybrid flow shop scheduling problems to minimize makespan. Applied Soft Computing, 19, 93-101. Pan, Q. K., Wang, L., Mao, K., Zhao, J. H., & Zhang, M. (2012). An effective artificial bee colony algorithm for a real-world hybrid flowshop problem in steelmaking process. IEEE Transactions on Automation Science and Engineering, 10(2), 307-322. Pattloch, M., Schmidt, G., & Kovalyov, M. Y. (2001). Heuristic algorithms for lotsize scheduling with application in the tobacco industry. Computers & industrial engineering, 39(3-4), 235-253. Pavnaskar, S. J., Gershenson, J. K., & Jambekar, A. B. (2003). Classification scheme for lean manufacturing tools. International Journal of Production Research, 41(13), 3075-3090. Pay, R., 2008. Everybody’s jumping on the lean bandwagon, but many are being taken for a ride. Industry Week, May, 21–23. Riane, F., Artiba, A., & Elmaghraby, S. E. (1998). A hybrid three-stage flowshop problem: efficient heuristics to minimize makespan. European Journal of Operational Research, 109(2), 321-329. Ribas Vila, I., & Companys Pascual, R. (2009). A hybrid flow shop model for an ice cream production scheduling problem. Journal of Industrial Engineering and Management (JIEM), 2(1), 60-89. Ruiz, R., & Vázquez-Rodríguez, J. A. (2010). The hybrid flow shop scheduling problem. European journal of operational research, 205(1), 1-18. Sahoo, A. K., Singh, N. K., Shankar, R., & Tiwari, M. K. (2008). Lean philosophy: implementation in a forging company. The International Journal of Advanced Manufacturing Technology, 36(5-6), 451-462. Shao-Hao Chang (2018). Hybrid Flow Shop Scheduling with Unrelated Parallel Machines and Sequence-dependent Setup Time (Master’s thesis). National Taiwan University, Taipei, Taiwan. Silva, C., & Magalhaes, J. M. (2006). Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry. Computers & Industrial Engineering, 50(1-2), 76-89. Slomp, J., Bokhorst, J. A., & Germs, R. (2009). A lean production control system for high-variety/low-volume environments: a case study implementation. Production Planning and Control, 20(7), 586-595. Spearman, M. L., & Zazanis, M. A. (1992). Push and pull production systems: issues and comparisons. Operations research, 40(3), 521-532. Sundar, R., Balaji, A. N., & Kumar, R. S. (2014). A review on lean manufacturing implementation techniques. Procedia Engineering, 97, 1875-1885. Syed Mohsin Ali (2017). Linear Motion Products Report – 2017 (Report Edition Year: 2017-2018). London, UK: IHS Markit. Tang, L., & Wang, X. (2009). An improved particle swarm optimization algorithm for the hybrid flowshop scheduling to minimize total weighted completion time in process industry. IEEE transactions on control systems technology, 18(6), 1303-1314. TechNavio-Infiniti Research Ltd. (2018). Global Linear Motion Systems Market 2018-2022,December, 2018. TechNavio-Infiniti Research Ltd. Womack, J. P., Jones, D. T., & Roos, D. (1990). Machine that changed the world. Simon and Schuster. Yang, T., Kuo, Y., Su, C. T., & Hou, C. L. (2015). Lean production system design for fishing net manufacturing using lean principles and simulation optimization. Journal of Manufacturing Systems, 34, 66-73. Yaurima, V., Burtseva, L., & Tchernykh, A. (2009). Hybrid flowshop with unrelated machines, sequence-dependent setup time, availability constraints and limited buffers. Computers & Industrial Engineering, 56(4), 1452-1463. 產業經濟統計簡訊《330》。(2019年3月5日)。經濟部統計處。取自https://www.moea.gov.tw/Mns/DOS/bulletin/Bulletin.aspx?kind=9&html=1&menu_id=18808&bull_id=5768 蔡紀眉。(2017年9月29日)。連台積電也採用!製程千變萬化,混線生產客製彈性更大。數位時代第281期。 | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/74387 | - |
dc.description.abstract | 本研究在探討利用平行加工演算法(parallel processing method)於兩階段混合型流程式生產模式(two-stage hybrid flow shop model)來改善訂單生產派工情形。將現有派工模式下的加工訂單予以批量分割(lot splitting),並且考量各機台的等待時間,重新分配給訂單的可行加工機台,減少在製品等待的時間浪費,以達到精實生產(lean production)的概念。此生產排程考量兩階段中非相關平行機台(unrelated parallel machines)、加工訂單間的順序相依整備時間(sequence-dependent setup time)等性質,引入產業個案作為實證研究。最後以精實績效指標衡量訂單派工結果與差異。 | zh_TW |
dc.description.abstract | In this study, we explore the use of parallel processing method (PPM) in a two-stage hybrid flow shop model to improve the order dispatching. Based on current orders dispatch algorithm, we adopt a strategy in lot splitting with consideration of the waiting time of each machines and redistribute the orders batch size to dispatch them into feasible machines. The merit in this method is reducing the waste of waiting for work in progress (WIP) to reach the concept of lean production. By this parallel processing method, we take two-stage unrelated parallel machines and sequence-dependent setup time of dispatch order into consideration. Besides, a case study derived from industrial data is used to illustrate the potential of the proposed approach. Finally, the difference in order dispatch results is measured by the lean metrics. | en |
dc.description.provenance | Made available in DSpace on 2021-06-17T08:33:05Z (GMT). No. of bitstreams: 1 ntu-108-R06546007-1.pdf: 1887090 bytes, checksum: b5f67f316d4847349cea4807cb81dcb0 (MD5) Previous issue date: 2019 | en |
dc.description.tableofcontents | 誌謝 i
摘要 ii Abstract iii 目錄 iv 圖目錄 v 表目錄 vi 第一章 緒論 1 第二章 平行加工演算法 7 2.1問題定義 7 2.2分群派工演算法 8 2.3批量分配方法 12 2.4平行加工演算法 13 第三章 個案研究與數值分析 21 3.1個案研究背景 21 3.2精實績效衡量指標 23 3.3派工結果比較 25 3.4敏感度分析 28 第四章 結論與未來研究方向 31 參考文獻 32 | |
dc.language.iso | zh-TW | |
dc.title | 運用平行加工演算法建立精實混合型流程式生產排程 | zh_TW |
dc.title | Using Parallel Processing Method to Build the Lean Hybrid Flow Shop Scheduling | en |
dc.type | Thesis | |
dc.date.schoolyear | 107-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 陳文智,陳建霖 | |
dc.subject.keyword | 混合型流程式生產,精實生產,批量分配,順序相依整備時間,非相關平行機台, | zh_TW |
dc.subject.keyword | Hybrid flow shop,Lean production,Lot splitting,Sequence-dependent setup time,Unrelated parallel machines, | en |
dc.relation.page | 35 | |
dc.identifier.doi | 10.6342/NTU201902923 | |
dc.rights.note | 有償授權 | |
dc.date.accepted | 2019-08-12 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 工業工程學研究所 | zh_TW |
顯示於系所單位: | 工業工程學研究所 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-108-1.pdf 目前未授權公開取用 | 1.84 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。