請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/6598
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 徐年盛 | |
dc.contributor.author | Sheng-Ting Lin | en |
dc.contributor.author | 林聖婷 | zh_TW |
dc.date.accessioned | 2021-05-17T09:15:06Z | - |
dc.date.available | 2017-08-16 | |
dc.date.available | 2021-05-17T09:15:06Z | - |
dc.date.copyright | 2012-08-16 | |
dc.date.issued | 2012 | |
dc.date.submitted | 2012-08-13 | |
dc.identifier.citation | [1] McDonald, M.G., and Harbaugh, A.W., 1988, A moudular three-dimensional finite-difference ground-water flow model: Techniques of Water-Resources Investigations of the United States Geological Survey, Book 6, Chapter A1, USGS, USA.
[2] 姜儷安、歐陽湘,「雲林地區地下水與水平衡初步分析」,濁水溪沖積扇地下水及水文地質研討會論文集,第181-206頁(1996)。 [3] 田巧玲、張炎銘、林維侃、蔡明坤,「濁水溪沖積扇之地下水水文概況」,濁水溪沖積扇地下水及水文地質研討會論文集,第207-221頁(1996)。 [4] 林君怡、葉明生、張良正、田巧玲,「濁水溪沖積扇地下水觀測網評估」,濁水溪沖積扇地下水及水文地質研討會論文集,第223-236頁(1996)。 [5] 張良正、龔誠山,「區域性地下水觀測站網檢討(II)-濁水溪沖積扇觀測站井佈置及觀測頻率檢討」(1996)。 [6] 中央地質調查所,「台灣地區地下水觀測網第一期計畫濁水溪沖積扇水文地質調查研究總報告」,經濟部水資源局委託計畫報告(1999)。 [7] 農業工程研究中心,「農田水利會灌溉管理基本資料庫維護及技術移轉」(2000)。 [8] 林崇亮、謝秉志、陳昶旭、林再興,「濁水溪沖積扇地下水資源儲藏量之研究」,鑛冶,第45卷,第3期,第49-59頁(2001)。 [9] 中興工程顧問股份有限公司,「彰雲地區農業用水合理需水量之探討」,經濟部水利處中區水資源局委託計畫報告(2001)。 [10] 江崇榮、陳瑞娥、頼慈華、黃智昭,「濁水溪沖積扇地下水區之補注水源評估」,第二屆資源工程研討會,第86-91頁(2005)。 [11] 江崇榮、黃智昭、陳瑞娥,「以地下水歷線分析法評估濁水溪沖積扇之地下水收支」,經濟部中央地質調查所彙刊,第十九號,第61-89頁(2006)。 [12] 中興工程顧問股份有限公司,「濁水溪沖積扇地面地下水聯合運用管理模式建立與機制評估」,經濟部水利署中區水資源局委託計畫報告(2007)。 [13] 徐年盛、汪中和、江崇榮、劉振宇、黃建霖、楊艾芸,「結合地下水平衡分析結果與氫氧同位素分析推估濁水溪沖積扇地下水各補注水源之水量」,第七屆地下水資源及水質保護研討會,第36-45頁(2009)。 [14] 中興工程顧問股份有限公司,「濁水溪水系本流上游河段治理規劃報告」,經濟部水利署第四河川局委託計畫報告,第3-44、3-45頁(2010)。 [15] 國立台灣大學,「雲林內陸地層下陷地區地下水抽水機制之探討與評估」,經濟部水利署委託計畫報告(2011)。 [16] 國立台灣大學,「台灣西部河川河槽作為地下水補注區可行性分析」,經濟部水利署委託計畫報告(2011)。 [17] 徐年盛、江崇榮、汪中和、劉振宇、劉宏仁、黃建霖,「地下水系統水平衡分析與補注源水量推估之研究」,中國土木水利工程學刊,23:4,第347-357頁(2011)。 [18] 經濟部水利署,「雲彰地區地層下陷具體解決方案暨行動計畫」,第2-6頁(2011)。 [19] 徐年盛、江崇榮、汪中和、劉振宇、劉宏仁、黃建霖,「多類灌溉型式下地下水系統抽水量與補注量之估算」,農業工程學報,第58卷,第1期,第69-90頁(2012)。 [20] 經濟部水利署,各項用水統計資料庫: http://wuss.wra.gov.tw/index.html [21] 經濟部水利署,地理資訊倉儲中心: http://gic.wra.gov.tw/gic/HomePage/Index.aspx# [22] 經濟部水利署,地層下陷資料庫: http://www.subsidence.org.tw/index2.aspx [23] 行政院農業委員會,灌溉管理情勢資料庫: http://coa.water.tku.edu.tw/water/Login.aspx [24] 行政院農業委員會,全臺土壤質地0-30公分、30-60公分、60-90公分、90-150公分。 | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/6598 | - |
dc.description.abstract | 濁水溪沖積扇係台灣農業重鎮又是新興工業發展區域,地面水源已無法滿足需求,地下水的供給為一重要供水來源。然為避免地下水不當抽用而造成地層下陷等不良後果,地下水資源之抽用應進行適當之管理,而各種管理策略是否有效,必須利用率定良好(Well calibrated)之地下水數值模式進行評估。欲建立率定良好之地下水數值模式,必須完成以下兩項工作:一是利用資料融合(Data fusion)技術,進行系統辨識;二為建立水文地質參數、補注量與抽水量之空間分布。
本研究首先蒐集研究範圍之現地基本資料,進行濁水溪沖積扇之地下水平衡分析,以推估區域性地下水之補注量與抽水量,接著利用MODFLOW建立濁水溪沖積扇補注量與抽水量空間分佈之模式。模式建立的過程,包括模式的架構,水文地質參數及邊界條件之設定,補注量與抽水量之給定,最後比較模式模擬水位與實際觀測水位進行模式的率定。補注量分為河床入滲補注、降雨補注、灌溉用水補注三部份設定之,並考慮研究區域內河床質地資料、土壤質地資料、耕作制度等因素,將補注量合理分配至模式網格中;抽水量分為公井抽水與民井抽水兩大部份設定之,公井抽水量分別依據自來水公司及農田水利會紀錄資料給定,民井抽水量則以地下水平衡分析結果配合水井清查資料設定之。 研究結果顯示,本研究於補注量及抽水量設定部分,詳細考慮諸多因素,對於濁水溪沖積扇地下水流的情形能更為真確的反應,具有相當之參考價值。模式經率定後,各含水層抽水比例有所變動,並發現第一含水層之民井抽水量可能有超估的情形,而第三、四含水層深層抽水情形較難掌握,需增設觀測井並進行更詳細之水井清查。 | zh_TW |
dc.description.abstract | Chou-Shui River alluvial fan is the agricultural center and emerging industrial area of Taiwan. Surface water has been unable to meet the rising demand, and groundwater has become an important source of water supply. However, groundwater resources should be appropriately managed to avoid land subsidence and other adverse consequences caused by improper pumping. To achieve this goal, we need a well calibrated groundwater numerical model to assess the effectiveness of various management strategies. To establish the numerical model, we must complete the following two tasks: First, utilizing the data fusion technology for groundwater system identification; Second, integrating site survey for clarification of spatial distribution of hydrogeological parameters, recharging, and pumping. Thus, in this study, we present a two-stage procedure to establish a representative groundwater model.
In the first stage, groundwater-hydrograph analysis is applied to evaluate the water balance of Chou-Shui River alluvial fan, and the total quantity of pumping and recharging is obtained. In the second stage, we used MODFLOW as the groundwater flow simulation model to correctly distribute the quantity of pumping and recharging into different space and time. The model establishment process includes aquifer stratification, hydrogeological parameters and boundary conditions setting, pmping and recharging distribution, and groundwater level observation fitting. The recharging is subdivided into three hydrologic components including rainfall infiltration, river leakage, and groundwater irrigation seepage. The subdivision is implemented according to riverbed materials, soil textures, and cropping systems. The pumping is subdivided into two components including public water supply pumping (involving pumping of both Water Corporation and Irrigation Association) and private pumping. The setting of each pumping is based on official pumping records and pumping well census results. The results show that, the groundwater resources of Chou-Shui River alluvial fan can be more properly distributed with the detailed settings of pumping and recharging. Furthermore, the quantity of pumping from first shallow unconfined aquifer might be overestimated before; the local pumping behavior in F3 and F4 are not clear, having to add the observation wells and more detailed pumping well census. | en |
dc.description.provenance | Made available in DSpace on 2021-05-17T09:15:06Z (GMT). No. of bitstreams: 1 ntu-101-R99521307-1.pdf: 3231462 bytes, checksum: 88baa161dce80a6edd9d5ced63a8f8ad (MD5) Previous issue date: 2012 | en |
dc.description.tableofcontents | 誌謝 ii
摘要 iii Abstract iv 目錄 vi 圖目錄 viii 表目錄 xi 第 一 章 前言 1 第一節 研究動機 1 第二節 文獻回顧 4 第三節 研究目的 6 第四節 研究流程 7 第 二 章 濁水溪沖積扇概述 9 第一節 區域地質 10 第二節 水文地質 13 第三節 河川水文 14 第四節 氣象條件 16 第五節 耕作制度 16 第六節 水井資料 18 第 三 章 濁水溪沖積扇地下水系統辨識 22 第一節 含水層概念分層辨識 22 第二節 含水層邊界辨識 24 第三節 系統水收支辨識 25 第 四 章 地下水流數值模式建立 30 第一節 MODFLOW地下水流數值模式介紹 30 第二節 濁水溪沖積扇地下水流數值模式參數設定 32 第三節 濁水溪沖積扇補注量與抽水空間模式建立 44 第四節 地下水流數值模式率定 59 第 五 章 結論與建議 72 第一節 結論 72 第二節 建議 73 參考文獻 75 | |
dc.language.iso | zh-TW | |
dc.title | 濁水溪沖積扇補注量與抽水量空間分佈模式建立 | zh_TW |
dc.title | Development of the Distribution Model of Pumping and Recharge for Chou-Shui River Alluvial Fan | en |
dc.type | Thesis | |
dc.date.schoolyear | 100-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 劉振宇,李振誥,江崇榮,張廣智 | |
dc.subject.keyword | 補注量,抽水量,濁水溪沖積扇,MODFLOW, | zh_TW |
dc.subject.keyword | Pumping Distribution,Recharging Distribution,Chou-Shui River Alluvial Fan,MODFLOW, | en |
dc.relation.page | 77 | |
dc.rights.note | 同意授權(全球公開) | |
dc.date.accepted | 2012-08-13 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-101-1.pdf | 3.16 MB | Adobe PDF | 檢視/開啟 |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。