Skip navigation

DSpace

機構典藏 DSpace 系統致力於保存各式數位資料(如:文字、圖片、PDF)並使其易於取用。

點此認識 DSpace
DSpace logo
English
中文
  • 瀏覽論文
    • 校院系所
    • 出版年
    • 作者
    • 標題
    • 關鍵字
    • 指導教授
  • 搜尋 TDR
  • 授權 Q&A
    • 我的頁面
    • 接受 E-mail 通知
    • 編輯個人資料
  1. NTU Theses and Dissertations Repository
  2. 工學院
  3. 土木工程學系
請用此 Handle URI 來引用此文件: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/63622
標題: 驗收缺失之研究-以高科技廠房潔淨室工程為例
Study of Quality Improvement For Final Acceptance
- A High-tech Clean Room Engineering
作者: Yen-Chun Lin
林延俊
指導教授: 張陸滿(Luh-Maan Chang)
關鍵字: 潔淨室工程,要徑工法,排程,工程品質,驗收缺失,
Cleanroom Engineering,Critical Path,Scheduling,Project quality,Defect of Acceptance.,
出版年 : 2012
學位: 碩士
摘要: 工程從規劃、設計、發包及施工完成,乃至營運管理,係於有限資源下完成,該完成物具備唯一及獨特性,不易複製,建設期間能否如質、如期及如預算完成,完成後又能否依規劃當初所確認的需求發揮功效,確需專家共同努力,始得完成。一個高科技廠房新建工程,從無到有,從荒地到產品的產出,以一個12吋晶圓廠從規劃設計、發包、興建、驗收到運轉合理的時間約需二年,根據在台灣已有多年且足夠的經驗,可將建廠時程縮短為12個月,無非是採用「同步建造」將設計、發包與興建同時執行,來加速完成廠房的興建。高科技廠房潔淨室工程,面對廠房建廠時程的壓縮、快捷要徑施工法等策略,邊施工邊設計、邊修改邊施工,忽略了設計與施工的程序,所引起的排程不合理、設計不周詳、試車調整沒落實等種種維持工程品質的困難,導致工程品質的不堪,往往是驗收缺失無法收拾。本研究即是針對驗收缺失之研究,目的是探討驗收缺失之型態及原因,並進一步探求預防之措施。
Projectfrom planning, design, contracting and construction is completed, as well as operational management, completed in the limited resources, the completion of the master with the sole and unique and difficult to copy. During the construction of whether such as quality, schedule and budget is completed and whether the original in accordiance with the plan confirmed by the demand to be effective, where the efforts of experts before they may complete. A high-tech plant new construction, from wasteland to the output of the product, a 12-inch wafer fabs from the planning and design, contracting, construction, acceptance to the operation of a reasonable period of time will take about two years. For many years and have enough experience in Taiwan construction time shortened to 12 months, is that synchronous construction will design, bidding and construction of the simultaneous execution, to accelerate the completion of plant construction. High-tech clean room engineering, the face of the compression of time, to be the critical path construction method and strategy, while construction design side to modify the construction, ignored the design and construction process, caused by the unreasonable schedule not well thought out design, test adjustment did not implement the various difficulties in the maintenance of project quality due to scheduling unreasonable, not well thought out design, not implementation of the test to adjust etc, various difficulties in the maintenance of project quality, the engineering quality of the state is often the acceptance of missing can not clean up. The study is for the defect of acceptance, the purpose is to study the types and causes of the acceptance of defect, and futher study prevention measures.
URI: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/63622
全文授權: 有償授權
顯示於系所單位:土木工程學系

文件中的檔案:
檔案 大小格式 
ntu-101-1.pdf
  未授權公開取用
2.46 MBAdobe PDF
顯示文件完整紀錄


系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved