請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/62115
標題: | 多目標使用商業建築施工風險管理在越南之研究
─以My Dinh 廣場為例 Risk Management for Multiple Usages Commercial Building Construction Project in Vietnam – Case Study of the My Dinh Plaza The Contractor’s perspective |
作者: | Duc-Nghia Doan 段德義 |
指導教授: | 郭斯傑(Guo, Sy-Jye) |
關鍵字: | 風險管理,承包商的角度來看,多使用和商業建築項目設計,建設和移交階段, Risk management,Contractor’s perspective,multiple usage and commercial building project,design, construction and handover stage., |
出版年 : | 2013 |
學位: | 碩士 |
摘要: | Construction is a risky industry and there is no other industry that requires proper application of business practices much as construction industry. The main objective of this research is to gain understanding of 35 risk factors that could be faced in multiple usage and commercial building projects in Vietnam. The study aims also to investigate the effectiveness of risk preventive and remedial methods. Moreover, the usage of risk analysis techniques is addressed.
The objectives of this research have been achieved through a comparative study of closed-ended questionnaires and a case study in Vietnam. The results of analyzing the questionnaire that were directed to contractor respondents concluded that the most important risk factors are: occurrence of accidents, contractor’s financial failure, unqualified designer, incorrect design and delayed disputes resolution. The results show that there are many risk factors contractors could not allocate them on the party that should bear these factors’ consequences. The study findings show that the contractors suffer from lack of innovative methods to prevent or mitigate risks. Contractors – according to results – do not utilize risk analysis techniques but depend widely on direct judgment in estimating time and cost. The results of this study recommended that there is an essential need for more standardization and effective forms of contract, which address issues of clarity, fairness, roles and responsibilities, allocation of risks, dispute resolution and payment. Contractors need to identify possible risk factors that could be faced and to allocate them contractually. There is a need to keep a computerized historical data of finished projects to help in rights reservation and to be an information source for future comparison. A standard form of contracts which address issues of clarity, fairness, roles and responsibilities, allocation of risks, dispute resolution and payment should be adopted for all the construction projects in Vietnam instead of the consequential disorder that was a result of applying different types of contracts. More effort should be made to properly apply risk management in the construction industry. |
URI: | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/62115 |
全文授權: | 有償授權 |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-102-1.pdf 目前未授權公開取用 | 2.44 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。