請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/62089
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 張陸滿(Luh-Maan Chang) | |
dc.contributor.author | Pham Viet Ha | en |
dc.contributor.author | 范越河 | zh_TW |
dc.date.accessioned | 2021-06-16T13:27:08Z | - |
dc.date.available | 2013-07-30 | |
dc.date.copyright | 2013-07-30 | |
dc.date.issued | 2013 | |
dc.date.submitted | 2013-07-23 | |
dc.identifier.citation | REREFENCES
1. Luh-Maan Chang, Maged E. Georgy, Lei Zhang (2001), “Engineering Productivity Measurement”, Report, RT-156, Construction Industry Institute, Austin, TX, USA. 2. Baccarini, D. (1987), “Nomination V”, Chartered Quantity Surveyor, 9 (11), 21-22. 3. Barnes, M. (1988), “Construction Project Management”, Project Management, 6 (2), 69-79. 4. Brooke, Martin (2008), Estimating and tendering for construction work, Fourth Edition, MPG Book Ltd, Oxford, UK. 5. Burati, J.L., Farrington, J.J. and Ledbetter, W.B.(1992), “Causes of quality deviations in design and construction”, ASCE Journal of Construction Engineering and Management, Vol. 118, pp. 34-49. 6. Buttner, J and Ruthning, F (1991), Shell and Core Construction, Australian Construction Law Newsletter #17. 7. Burnison, Gordon (1970), Notes of cases: Failure of NSCs in building contracts, Northern Ireland Legal Quarterly, V 21, Q 442. Heinemann, UK. 8. Cartlidge, D. (2009), Quantity Surveyor's Pocket Book, First Edition, Elseveir, Burlington, MA, USA. 9. Chan, A, and Yeong, C, (1995), “A comparisonof strategies for reducing variations”, Construction Management and Economics Journal, 13, 467-473. 10. Chen, B (2006), “New guidelines to settle construction disputes”, Construction law international, volume 1, no 13. 11. Collis, J., and Hussey, R., (2003) Business Research: A Practical Guide for Undergraduate and Postgraduate Students, Hampshire, England. 12. Cooke, B. and Williams, P. (1998) Construction Planning, Programming and Control, Macmillan Press Ltd, Basingstoke, UK. 13. Doe, J. and Smith, H. (2008), “Who holds the programme risk?”, Construction law Journal, 10(1) 14. Eggleston, Brian (1997), Liquidated damages and extensions of time in construction contracts, Second Edition, Blackwell Publishing, Oxford, UK. 15. Eggleston, Brian (2001), The ICE conditions of contract, Seventh Edition, Blackwell Publishing, Oxford, UK. 16. FIDIC (1987), Conditions of contract for construction for building and construction work designed by the Employer, Fourth Edition, International Federation of Consulting Engineers, Lausanne, Switzerland. 17. FIDIC (1994), Conditions of subcontract for works of civil construction, First Edition, International Federation of Consulting Engineers, Lausanne, Switzerland. 18. FIDIC (1999), Conditions of contract for construction for building and construction work designed by the Employer, First Edition, International Federation of Consulting Engineers, Lausanne, Switzerland. 19. Fong, Chow (2004), Law and Practice of Construction Contracts, Third Edition, Sweet & Maxwell Asia, Singapore. 20. Green, David (2003) Torts law, Fifth Edition, Routledge, Hampshire, UK. 21. Hackett, M. and Robinson, I. (2003), Pre-contract practice and contract administration for the building team, Blackwell Publishing, Oxford, UK. 22. Hinze, J. and Tracy, A. (1994), “The MC–subcontractor relationship: the subcontractors’ views”, Journal of Construction Engineering and Management, 2(1), 274–87. 23. Ipko I, (2008), “Variability Analysis of Prime Cost Sums”, Civil Consultation Dimension, Vol. 10, No. 1, 40-44 24. Jordi, P (1999), “Miscellaneous contracts (Carriage, Deposit, Donation, Loan, Partnership, Service and Suretyship) and agency”, Annual Survey of South African Law, 214-231. 25. John B Molloy (1998), “Default of Nominated Sub-Contractors”, HKIS Newsletter, 7(6) 26. Karim, K., Marosszeky, M. and Davis, S. (2006), “Managing subcontractor supply chain for quality in construction”. Consultation, Construction and Architectural Management, 13(1), 27–42. 27. Kennedy, P. , Morrison, A. and Milne, D. O.(1997) “Resolution of disputes arising from set-off clauses between MCs and subcontractors”, Construction Management and Economics, 15: 6, 527 – 537 28. Knowles, Roger (2000), One hundred contractual problems and their solutions, Blackwell Science, , Oxford, UK. 29. Knutson, Robert (2005), FIDIC: An analysis ofinternational construction contracts, Kluwer law international, Haguen, The Netherlands. 30. Laryea, Samuel (2009), “Subcontract and supply enquiries in the tender process of contractors”, Construction Management and Economics, 27: 12, 1219 — 1230 31. Lo, T., Fung, I., and Tung, K (2006), Construction on Delays in Hong Kong Civil Consultation Projects, Journal of construction engineering and management, ASCE, PP 636-649. 32. March, Chris (2009), Finance and Control for Construction. Taylor & Francis, NY, USA. 33. Marsh, Peter (2000), Contracting for Engineering and construction Projects, Fifth Edition, the University of Michigan, USA. 34. Masrom, Asrul (2007), Nature of delay in nominated subcontracting, MSc. Dissertation, Universiti Teknologi Malaysia. 35. Mbachu, Jasper (2008), “Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry”, Construction Managementand Economics, 26 (5), 471 — 484. 36. McGuinness, John (2007), The Law and Management of Building Subcontracts, Second Edition, Blackwill Publishing, Oxford, UK. 37. Molloy, J (1998), Default of NSCs, Volume 7 Issue 6, Newsletter of Hong Kong institute of Surveyors. 38. Morgan, D., (1988) focus Groups on Qualitative Research, Newbury Park. 39. Murdoch, J. and Hughes, W., (1996), Construction contracts: Law and management, second edition, E & FN Spon, London, UK. 40. Ndekugri, I. and Rycroft, M. (2009), The JCT 05 Standard Building Contract: Law and Administration, Second Edition, Butterworth-Heinemann, MA, USA. 41. Powell-Smith, V., Sims, J., Dancaste, C. (2000), Contract documentation for contractors, Third Edition, Wiley Blackwell, Oxford, UK. 42. Rawling, Brian (2001), “Nominated or named?”, HKIS Newsletter, 10(5) 43. Shoesmith, David (1996), “A study of the management and procurement of building services work”, Construction Management and economics, 14, 93-101. 44. Sinjakli, Adel (2003), “NSCs under construction law”, Arab law quarterly journal V 18, issue 1, PP 104-106. 45. Shephered, C. and Koh M. (2006), “A significant advance: Hong Kong Standard forms of building contract updated”, Construction law international, V1, N1, PP 11-13. 46. Smith, Alastair (1997), “A Contractual short circuit”, The Quarterly law review for people in business, Vol 5, Part 1, PP 4-8. 47. Standen, D (2002), The new plain English building contracts, Australian Construction Law Newsletter #85. 48. Tadashi, E., Kenji, M. and Takahieon, Y. (2000), “The rules of NSC and prime cost contract (PCC) in UK. Lessons learned for Japanese style Construction Management system”, Kenchiku Seisan Shinpojiumu Ronbunshu Journal, V 16, PP 189-196. 49. Tomas, Sarah (2007), “Use of FIDIC in water projects-ten key points to consider”, Construction law international, Vol 2, No 2, PP 9-13. 50. Twort, A. and Rees, J. (2004), Civil Engineering Project Management, Fourth Edition, Elsevier Butterworth, Oxford, UK. 51. Wallace, I (2004), Hudson's building and Engineering contracts, 11th edition, Sweet & Maxwell, London, UK. 52. Wilkie, R. and Walker, I. (2002), Commercial management in construction, Blackwell Publishings, Oxford, UK. 53. William Mendenhall/ Jame E. Reinmuth (1978), Statitics for Management and Economics, Third Edition, Duxbury Press, North Scituate, MA, USA. | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/62089 | - |
dc.description.abstract | 改善越南營造廠分包選任的做法 | zh_TW |
dc.description.abstract | Since a Subcontracting is a very common aspect of the procurement strategy in construction. The practice of subcontract nomination has produced many problems to the construction industry in Vietnam. Examining the nature of associated challenges and investigating new approaches to improve the nomination practice become more critical and demanding. An initial research on what other people have written on this topic was carried out to better understand the problems and possible solutions. Then, a series of structured interviews were conducted with senior construction professionals in Vietnam to examine how the findings of the initial research apply and relate to Vietnam construction industry. The analysis and findings of the interviews formed the basis of a questionnaire. The respondents of the questionnaire were mainly asked to clarify the nomination problems and the approaches to improve the nomination practice. The research indicated that despite the significant reasons and benefits of nomination, the major problems and challenges are not encouraging to adopt it. The research found out that the full involvement of the main contractor in the nomination process from the outset is the best possible approaches to improve the practice of subcontract nomination in Vietnam. | en |
dc.description.provenance | Made available in DSpace on 2021-06-16T13:27:08Z (GMT). No. of bitstreams: 1 ntu-102-R00521724-1.pdf: 1672273 bytes, checksum: f4dfa1d8efa5d98d6da2d5a38fbbadec (MD5) Previous issue date: 2013 | en |
dc.description.tableofcontents | CONTENTS
ACKNOWLEDGMENTS I ABSTRACT II LIST OF FIGURES V LIST OF TABLES VI GLOSSARY VII CHAPTER 1: INTRODUCTION 1 1.1 Background 1 1.2 Motivation and Problem Statements 3 1.3 Purposes and Contributions 4 1.4 Research Scope and Limitation 4 1.5 Thesis Structure 5 CHAPTER 2: LITERATURE REVIEW 6 2.1 What is Contract Nomination? 6 2.2.1 Nominated Subcontractor 6 2.2.2 Reasons and Benefits of Nomination 11 2.2.3 Nomination Procedures 12 2.2.4 Contractual Relationships among Parties 14 2.2 Problems of Nomination 16 2.2.1 Conflict problems 17 2.2.2 Default of NSCs 20 2.3 Summary 26 CHAPTER 3: RESEARCH METHODOLOGY 27 3.1 Research Approach 27 3.2 Sampling Plan 29 3.2.1 Population 29 3.2.2 Target Organizations 29 3.2.3 Sampling Method 29 3.2.4 Time Scale 30 3.2.5 Critical Success Factors 30 3.2.6 Resource Constraints 30 3.3 Analysis of variance 30 CHAPTER 4: DATA COLLECTION AND ANALYSIS 33 4.1 Data Collection and Analysis of Interviews 33 4.1.1 Personal Interview with Mr. Pham Quang Minh 33 4.1.2 Phone Interviews 35 4.1.3 Discussion 35 4.2 Data Collection and Analysis of Questionnaires 36 4.2.1 General Information 37 4.2.2 Conflict problems 38 4.2.3 Default of NSCs 48 4.2.4 Discussion 56 CHAPTER 5: CONCLUSIONS AND RECOMMENDATIONS 57 5.1 Conclusions 57 5.2 Recommendations 58 REREFENCES 61 APPENDIX 66 | |
dc.language.iso | en | |
dc.title | 改善越南營造廠分包選任的做法 | zh_TW |
dc.title | Improving the Practice of Subcontract Nomination in Vietnam | en |
dc.type | Thesis | |
dc.date.schoolyear | 101-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 曾惠斌(Hui-Ping Tserng),荷世平(Shih-Ping Ho) | |
dc.subject.keyword | 選任,分包, | zh_TW |
dc.subject.keyword | nominated,subcontractor, | en |
dc.relation.page | 110 | |
dc.rights.note | 有償授權 | |
dc.date.accepted | 2013-07-23 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-102-1.pdf 目前未授權公開取用 | 1.63 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。