Skip navigation

DSpace

機構典藏 DSpace 系統致力於保存各式數位資料(如:文字、圖片、PDF)並使其易於取用。

點此認識 DSpace
DSpace logo
English
中文
  • 瀏覽論文
    • 校院系所
    • 出版年
    • 作者
    • 標題
    • 關鍵字
  • 搜尋 TDR
  • 授權 Q&A
    • 我的頁面
    • 接受 E-mail 通知
    • 編輯個人資料
  1. NTU Theses and Dissertations Repository
  2. 工學院
  3. 工業工程學研究所
請用此 Handle URI 來引用此文件: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/60904
標題: 具多碼頭門越庫區系統之入站與出站貨車暨平行機台作業排程規劃
Inbound and Outbound Truck Scheduling with Considering Parallel-machine Operations in Cross Docking Systems
作者: Wen-Jui Liu
劉文瑞
指導教授: 黃奎隆(Kwei-Long Huang)
關鍵字: 供應鏈管理,貨車排程,平行機台,整數規劃,越庫區排程,啟發式演算法,
supply chain management,parallel machine,cross docking system,truck scheduling,mixed integer programming,
出版年 : 2013
學位: 碩士
摘要: 近年來由於供應鏈管理的興起,使得越庫區之相關研究議題日益受到關注,越庫區系統作為供應鏈管理的策略之一,能夠替物流中心帶來有效的管理、成本減少與貨物運送的效率,而越庫區的研究議題相當廣泛,由越庫區的位址選擇、越庫區的設施布置、越庫區的貨車排程到越庫區的內部資源排程問題,而本研究專注於越庫區的貨車排程,研究如何決定入站與出站貨車於越庫區的排程,並考慮內部含有平行機台的拆解作業,此拆解作業能將大包裝的產品拆解成小包裝後出貨。本研究之情境考慮多個平行的碼頭門,讓多輛貨車可以同時進出越庫區作業,且越庫區內擁有一個暫時存放卸貨產品的區域,此區域只能存放有限容量的卸貨產品,而經過越庫區的產品分為不需拆解與需要拆解的,而此些特性會影響到貨車排程的結果,而較佳的貨車排程與機台排程可以增加作業效率,能在短時間內將產品轉移至出站貨車上,使出站貨車能夠在到期時間前出貨。因此在此問題特性下,本研究提出整數規劃模式,目標為最小化最大遲到,並且於小案例時,以所提出數學規劃模式使用最佳化軟體求解並作驗證,當案例較大時,求解空間也呈指數型增加,因此本研究也提出啟發式演算法,並撰寫程式實作此演算法,使得能在大案例時,能以合理的時間找到近似最佳解。本研究之啟發式演算法,應用了專案排程與三階段的平行機台排程之概念,將入站工作、出站工作與機台工作,分別進行適當的排程。
關鍵字:供應鏈管理、貨車排程、平行機台、整數規劃、越庫區排程、啟發式演算法
Recently, more and more of research have focused on the topic of cross-docking systems, since the rise of supply chain management for distribution center. Cross-docking system is one of the techniques for supply chain management that reducing inventory cost and increasing cargos delivery efficiency. A wide range of research topics for the cross-docking, include location of cross-docking terminals, layout of the terminal and truck scheduling. Our research concentrates on the operation about the inbound and outbound trucks scheduling in which determines the arrival and departure times for the trucks. In addition, we consider multiple parallel machines that can decompose cargos to small package in system. With the multiple loading and unloading dock doors more than one trucks can simultaneously enter the cross docking system to load or unload cargos. There is a limited capacity space for storing the unloaded products temporarily. The objective is to minimize maximum lateness. A well-planed truck scheduling will increase the efficiency of the cross-docking system, and the outbound trucks can deliver products before due date. For the problem, we construct an integer programming model. We propose a heuristic algorithm to solve a large size problem instance. According to the numerical results our heuristic algorithm can indeed get good solutions in reasonable time.
Keywords: supply chain management, parallel machine, cross docking system, truck scheduling, mixed integer programming
URI: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/60904
全文授權: 有償授權
顯示於系所單位:工業工程學研究所

文件中的檔案:
檔案 大小格式 
ntu-102-1.pdf
  目前未授權公開取用
1.28 MBAdobe PDF
顯示文件完整紀錄


系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved