請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/55239完整後設資料紀錄
| DC 欄位 | 值 | 語言 |
|---|---|---|
| dc.contributor.advisor | 曾惠斌(Tserng Hui-Ping) | |
| dc.contributor.author | Jia-Nuo Han | en |
| dc.contributor.author | 韓佳諾 | zh_TW |
| dc.date.accessioned | 2021-06-16T03:52:46Z | - |
| dc.date.available | 2020-08-14 | |
| dc.date.copyright | 2020-08-14 | |
| dc.date.issued | 2020 | |
| dc.date.submitted | 2020-08-03 | |
| dc.identifier.citation | [1] Birge , J.R,and Zhang, R. Q. Risk-neutral option pricing methods for adjusting constrained cash flows. Eng. Economy, 1999: 15-17. [2] Patrick T I Lam.A sectoral review of risks associated with major infrastructure projects. International Journal of Project Management. 1999, Vol. 17, No. 2: 77-87 [3] Bakat, Jan, S. financial engineering for BOT power projects: simplified model for optimal capital structure, MS thesis, Middle East Technical University, Ankara, Turkey, 2000:26-29. [4] Chung, Boo Young, An Analysis of Success and Failure Factors for ERP Systems in Engineering and Construction Firms. Miskilay J, University of Maryland, 2007,11,19. [5]Shahu , R., Pundir, A.K. Ganapathy, L (2012). An Empirical Study on Flexibility: A Critical Success Factor of Construction Projects. Glob J Flex Syst Manga 13, 123–128. [6]許樹珀.實用決策方法—層次分析原理.天津市:天津大學出版社,1988,42-43 [7]王雪青,何伯森.BOT 立項中的法律、融資和風險問題.天津市:社會科學版, 1999(12) 49-50. [8]安中仁.BOT 方式與水利建設.北京:中國水利水電出版社,2001,35-38 [9]馬永喜.項目融資與我國基礎設施建設.國際經濟合作.2002 (8) : 15-17 [10]姚亮,周晶.BOT 項目風險及來源分析.東南大學學報:哲學社會科學版,2002,(S2)9-12. [11]戴大雙,于英慧,韓明傑.BOT 項目風險量化方法與應用.科技管理研究, 2005,25(2): 98-100. [12]汪忠,黃瑞華. 國外風險管理研究的理論、方法及其進展.陝西,西安交通大學,管理學院.外國經濟與管理. 2005,v 27,No 2,25-31 [13]王新衛. BOT 項目融資在電力工程中成功關鍵因素研究.東北大學,工商管理學院,2008,6. [14] 夏立明,催民婧,趙春雪.基於因素分析構建高速公路項目施工進度的風險指標體系.天津,天津理工大學,管理學院,天津工業大學學報.2011,v30,No 6,85-88. [15]唐文彬,張飛漣. 城市軌道交通投融資風險評價方法.湖南.中南大學,長沙理工大學,土木與建築學院,經濟與管理學院,系統工程.2011,v29,No 1,117-122. [16] 湯淳.基於層次分析法的 BOT+EPC 工程項目風險管理研究.重慶交通大學, 2013. [17] 裴淥泠. BOT+EPC 模式下高速公路項目總承包方風險分擔研究.重慶交通大學,2015. [18] 亞洲開發銀行.推動中華人民共和國內河航運發展.2016.菲律賓馬尼拉,亞洲銀行.1-60. [19]姚金炳,趙文賓.中國內河航運發展的機遇與挑戰.2019.雲南,雲南水運規劃設計研究院. [20]李森,黃智俊. 長三角園區產業一體化發展風險研究.李森園區智庫.產業園區和開發區研究.2019(8). [21]楊德宏.永定河流域產業開發面對的機遇與挑戰.中諮海外資訊有限公司.中國水利,2019(11). | |
| dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/55239 | - |
| dc.description.abstract | 近年以來中國大陸地區大力發展基礎設施建設,包括鐵路、公路、橋樑等設施的建造,但是內陸航運的建設發展卻顯得尤為緩慢,嚴重阻礙內陸流域經濟發展!投資建設內河航運工程從長遠上看,可快速的聯通內陸地區和沿海經濟發達地區,達到有效地經濟聯動性。本文以廣西壯族自治區賀州市賀江航運工程“BOT+產業開發'項目為研究案例,由於該項目是大陸地區首個“BOT+產業開發'模式進行建設開發的項目,因此並沒有具體的航運工程運用此模式全壽命完成。實際運作不成熟,需要在逐步摸索中完成並改善,BOT+產業開發模式下的風險分析和控制方法是本文主要探討的問題,解決完善該問題便可減少在項目實施過程中所遇到的困難。 根據國家和地區相關政策結合研究項目情況,在賀江航運一期工程階段存在盈利能力較差的問題,營運期內使用者付費總額均不足以支付項目所貸款的利息,有較大的資金缺口,因此單一的 BOT 模式,或 PPP 模式還是政府投資都很難將該項目徹底實施。由此營運而生全新的建設模式 “BOT+產業開發'模式,通過額外的捆綁其他的產業開發,利用投資收益沖抵項目建設投資支出,來達到降低項目建設資金缺口的目的。 本文通過梳理國內外多種模式下的建設風險管理相關理論,並通過專家訪談和問卷調查,通過因素分析對賀州市賀江航運工程“BOT+產業開發'項目風險因素進行分析,識別出兩大類主要風險因素。根據識別出的風險因素構建風險指標評價體系,運用層次分析法對該航運工程進行風險綜合評價,對其重要度進行排序。再根據重要程度,對該“BOT+產業開發'工程的主要風險進行控制,並提出相應的控制措施,事先對賀江航運工程“BOT+產業開發'項目進行控制管理。 | zh_TW |
| dc.description.abstract | In recent years, the mainland China has vigorously developed infrastructure construction, including the construction of railways, highways, bridges and other facilities, but the construction and development of inland shipping has been particularly slow, seriously hindering the economic development of inland river basins! This article takes the “BOT+Industry Development” project of Hejiang Shipping Project in Hezhou City, Guangxi Zhuang Autonomous Region as a research case. Since this project is the first “BOT+Industry Development” model construction and development project in the mainland, there is no specific shipping project to use this project. The model has completed its life span. The actual operation is immature and needs to be completed and improved through gradual exploration. The risk analysis and control methods in the BOT+ industry development model are the main issues discussed in this article. Solving this problem can reduce the difficulties encountered in the project implementation process. In this paper, through combing the relevant theories of construction risk management under various modes at home and abroad, and through expert interviews and questionnaires, through factor analysis, the risk factors of the 'BOT+Industry Development' project of Hejiang Shipping Engineering in Hezhou City were analyzed to identify two major types of risks factor. According to the identified risk factors, a risk index evaluation system is constructed. AHP is used to comprehensively evaluate the risk of the shipping project and rank its importance. According to the importance, the main risks of the 'BOT+Industry Development' project are controlled, and corresponding control measures are proposed to control and manage the 'BOT+Industry Development' project of the Hejiang Shipping Project in advance. | en |
| dc.description.provenance | Made available in DSpace on 2021-06-16T03:52:46Z (GMT). No. of bitstreams: 1 U0001-3007202017215900.pdf: 2696815 bytes, checksum: 62c78cb38ab75a4b8b72359df9894015 (MD5) Previous issue date: 2020 | en |
| dc.description.tableofcontents | 摘要..............................ii Abstract........................iii 目錄............................iv 圖目錄..........................vii 表目錄........................ viii 第一章 緒論................... 1 1.1研究背景及意義............. 1 1.1.1研究目的................. 3 1.2研究內容及方法............. 4 1.2.1主要研究內容............. 4 1.2.2研究方法................. 4 1.2.3研究結構................. 4 1.3本章小結................... 5 第二章 相關理論概述........... 6 2.1國內外相關研究............. 6 2.1.1國外研究現狀............. 6 2.1.2 國內研究現況............ 7 2.1.3文獻綜合評述............. 7 2.2 BOT+產業開發模式概述...... 8 2.2.1BOT基本理論.............. 8 2.2.2產業開發概念............. 12 2.2.3 BOT+產業開發 模式....... 12 2.3項目風險管理相關理論....... 13 2.3.1風險及工程項目風險管理... 13 2.3.2 BOT 模式的風險.......... 17 2.3.3產業開發風險............. 18 2.3.4 BOT+產業開發模式下的風險管理..... 19 2.4 小結............................... 23 第三章 內河航運項目風險管理現狀分析.... 24 3.1 賀州市內河航運工程項目概括......... 24 3.1.1項目概述.......................... 24 3.1.2項目建設規模...................... 25 3.2工程項目管理問題分析................ 26 3.2.1 政府政策風險..................... 26 3.2.2配套產業開發風險.................. 27 3.2.3市場與經濟風險.................... 28 3.2.4不可抗力風險...................... 28 3.3本章小結............................ 29 第四章 工程項目風險分析................ 30 4.1“BOT+產業開發”內河航運項目風險因素識別:....30 4.2 BOT+產業開發內河航運風險因素問卷調查:......31 4.2.1問卷設計...................................31 4.2.2問卷發放與回收............................ 31 4.3風險因素問卷分析............................ 32 4.3.1變數選取.................................. 32 4.3.2因素分析.................................. 33 4.4“BOT+產業開發”模式內河航運風險因素分析.... 36 4.5小結........................................ 36 第五章 內河水運項目風險評估與控制.............. 38 5.1 “BOT+產業開發”內河航運工程風險評價流程... 38 5.2“BOT+產業開發”模式內河航運工程風險方法.... 39 5.2.1 層次分析................................. 39 5.2.2“BOT+產業開發”內河航運風險指標體系建立.. 41 5.3 BOT+產業開發 內河水運工程綜合評價.......... 42 5.3.2 風險評估................................. 45 5.4“BOT+產業開發”內河航運項目風險控制與應對.. 46 5.4.1 從實際案例的風險管理總結出規避及管理手段. 46 5.4.2內河航運BOT+產業開發風險管理應對措施和實施方法.... 47 5.5本章小結............................................ 48 第六章 結論與建議...................................... 49 參考文獻............................................... 51 附錄................................................... 53 BOT+產業開發內河航運風險因素調查問卷................... 53 層次分析(AHP)問卷數據................................ 57 | |
| dc.language.iso | zh-TW | |
| dc.subject | 航運工程 | zh_TW |
| dc.subject | AHP | zh_TW |
| dc.subject | 風險指標 | zh_TW |
| dc.subject | 因素分析 | zh_TW |
| dc.subject | 風險管理 | zh_TW |
| dc.subject | BOT+產業開發 | zh_TW |
| dc.subject | AHP | en |
| dc.subject | BOT+Industrial | en |
| dc.subject | Development | en |
| dc.subject | Risk Management | en |
| dc.subject | Factor Analysis | en |
| dc.subject | Risk Index | en |
| dc.subject | Shipping Engineering | en |
| dc.title | “BOT+產業開發”模式下內河水運的風險分析研究 ——賀江航運工程為例 | zh_TW |
| dc.title | Risk analysis of inland water transportation under the mode of “BOT+industrial development” ——Example of Hejiang shipping project | en |
| dc.type | Thesis | |
| dc.date.schoolyear | 108-2 | |
| dc.description.degree | 碩士 | |
| dc.contributor.oralexamcommittee | 林祐正(Yu-Cheng Lin),林艺馨(Yi-Xing Lin) | |
| dc.subject.keyword | 航運工程,BOT+產業開發,風險管理,因素分析,風險指標,AHP, | zh_TW |
| dc.subject.keyword | Shipping Engineering,BOT+Industrial,Development,Risk Management,Factor Analysis,Risk Index,AHP, | en |
| dc.relation.page | 57 | |
| dc.identifier.doi | 10.6342/NTU202002121 | |
| dc.rights.note | 有償授權 | |
| dc.date.accepted | 2020-08-03 | |
| dc.contributor.author-college | 工學院 | zh_TW |
| dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
| 顯示於系所單位: | 土木工程學系 | |
文件中的檔案:
| 檔案 | 大小 | 格式 | |
|---|---|---|---|
| U0001-3007202017215900.pdf 未授權公開取用 | 2.63 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。
