請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/39547
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 郭斯傑(Sy-Jye Guo) | |
dc.contributor.author | Pham Tuyen | en |
dc.contributor.author | 範宣 | zh_TW |
dc.date.accessioned | 2021-06-13T17:31:30Z | - |
dc.date.available | 2012-07-18 | |
dc.date.copyright | 2011-07-18 | |
dc.date.issued | 2011 | |
dc.date.submitted | 2011-07-08 | |
dc.identifier.citation | Flangan, Roger and Norman, G. (1999), Risk Management in Engineering Construction. BSP Professional Boos, Oxford.
Hayes, R„ Perry, J. and Thompson, J. (1986), Risk Management in Engineering Construction: A Guide to Project Analysis and Risk management. Thomas Telford, London. Gay, M., Rippentrop, G., Hansmire, W.H. and Romero, V.S., “Tunnelling on the tren urbano project”, chapter 35, San Juan, Puerto Rico. Greifeneder, E., (2003), “Comparison of cut-and-cover tunnelling method vs, new austrian tunnelling method (NATM) for urban tunnels with shallow overburden”, Master’s thesis. Jobling, P., Merna, A., and Smith, N. J, (2006) “ Managing risk in construction project”. Eskesen, S. D., Tengborg, P., Kampmann, J., Veicherts, T. H., (2004) “Guidelines for tunneling risk management” :International Tunnelling Association. Third edition project management institute, “ A guide to the project management body of knowledge” (pmbok@ guide). Health and safety executive, (1996), “Safety of new austrian tunnelling method tunnels - a review of sprayed concrete lined tunnels with particular reference to london clay”, HSE books, 86pp. Health and safety executive, (1993), “The cost of accidents at work' HSE books, Sudbury, Suffolk. Law No. 16/2003/QH11 of National Assembly issued on 31 March, 2004 Law on construction - Socialist Republic Of Vietnam. Decree No. 16-2005-ND-CP of the Government issued on 7 February, 2005 on management of investment projects for construction of works - Socialist Republic Of Vietnam. Decree No. 209/2004/ND-CP of the Government issued on 16 December, 2004 on quality management of construction works -Socialist Republic Of Vietnam. Http://www.ita-aites.org/ Http://international.fhwa.dot.gov | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/39547 | - |
dc.description.abstract | 该论文提出了对风险的承包商在施工阶段对建设河内地铁项目风险管理实践的角度评估研究的细节。通过对风险的后果,风险频率和专家在河内地铁项目的讨论重点,这一论断表明良好的风险承包商的应对策略。
为了达到研究目的,研究者进行了文献综述的主体,明确重要的风险参数和分类相关的施工风险,设计相关的后果和对河内地铁项目的这些风险的频率下了问卷。调查问卷分发给35从教授,施工经理专家,地质专家,业主,承包商在越南的受访者。 从35收到的答复因素,分析,归纳和专家的讨论。结果分析表明,高风险,中等风险和河内地铁施工阶段承包商的低风险。风险应对策略计划,提出高风险和中等风险和短期风险应对策略计划创建的细节。通过建立风险应对策略,河内地铁承包商有效果的工具,面对在这个项目的风险。 | zh_TW |
dc.description.abstract | The thesis presents the details of a study on the assessment of risks management practice of construction stage contractors perspective in Hanoi metro project toward construction risks. By focusing on risk consequence, risk frequency and expert discussion in Hanoi metro project, this thesis suggests good risk response strategy for contractor.
To achieve the study objectives the researcher conducted a literature review of the subject, defined important risk parameters and categorized related to construction risks, designed a questionnaire related to consequence and frequence of these risks on Hanoi metro projects. The questionnaire was distributed to thirty five respondents from the professors, construction manager experts, geological experts, the owners, the contractors in Vietnam. Responses from thirty five factors were received, analyzed, summarized and expert discussion. Analysis of the results indicated that high risks, medium risks and low risks of Hanoi metro contractors in construction stage. The risk response strategy plan is presented detail with high risks and medium risk and the short risk respond strategy plan is created. By creating the risk response strategy, the Hanoi metro contractor have the effect tool to face with the risk in this project. | en |
dc.description.provenance | Made available in DSpace on 2021-06-13T17:31:30Z (GMT). No. of bitstreams: 1 ntu-100-R98521750-1.pdf: 5071568 bytes, checksum: c0c085f49501d4912275459516bde037 (MD5) Previous issue date: 2011 | en |
dc.description.tableofcontents | TABLE OF CONTENTS
ACKNOWLEDGEMENTS i ABSTRACT ii LIST OF FIGURES vi LIST OF TABLES vii Chapter 1 Introduction 1 1.1 Vietnam transportation 1 1.1.1 Roads, tunnels and bridge 2 1.1.2 Railway transport 3 1.2 Problem statement 4 1.3 Research objectives 4 1.4 Research methodology 5 1.5 Overview of research structure 6 Chapter 2 Literature Review 7 2.1 Introduction 7 2.2 Definition of risk 7 2.3 Risk management process 9 2.3.1 Risk identification 10 2.3.2 Risk assessment 13 2.3.3 Risk response 15 2.4 Background of Hanoi metro project 18 2.4.1 Section Nhon - Hanoi railway station 20 2.4.2 Section Noibai airport - Hadong 25 2.4.3 Some features of Hanoi related to the construction of underground works 27 Chapter 3 Risk Identification and Assessment 29 3.1 Research process 29 3.2 Risk identification 30 3.2.1 Risk categories 30 3.2.2 Questionnaire survey design 36 3.2.3 Questionnaire survey’s procedure 37 3.2.4 Questionnaire survey respondent’s profile and survey’s results 38 3.3 Risk assessment 38 3.3.1 Risk matrix 39 3.3.2 Risk assessment result 41 Chapter 4 Risk Response 47 4.1 Objective of response management process 47 4.2 Response strategic 48 4.3 High risk response strategic 49 4.3 Medium risk response strategic 53 4.4 The other risk response strategic 56 Chapter 5 Conclusions and Recommendations 58 5.1 Conclusions 58 5.1.1 Identification and assessment risks. 58 5.1.2 Risk response strategies 60 5.2 Recommendations 61 5.3 Suggestions for futher studies 61 REFERENCES 63 APPENDIX 65 | |
dc.language.iso | en | |
dc.title | Hanoi 捷運 工程施工階段 承建商 風險管理之探討 | zh_TW |
dc.title | Risk Management for the Hanoi Metro Project
in Construction Stage - The Contractor’s Perspective | en |
dc.type | Thesis | |
dc.date.schoolyear | 99-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 曾惠斌(Hui-Ping Tserng),陳柏翰(Po-Han Chen) | |
dc.subject.keyword | 風險管理,河內地鐵項目,施工階段,承包商的視角, | zh_TW |
dc.subject.keyword | Risk management,Risk response strategies,Hanoi metro project,Construction stage,Contractor’s perspective, | en |
dc.relation.page | 83 | |
dc.rights.note | 有償授權 | |
dc.date.accepted | 2011-07-08 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-100-1.pdf 目前未授權公開取用 | 4.95 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。