請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/38620
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 陳靜枝(Ching-Chin Chern) | |
dc.contributor.author | I-Chieh Yang | en |
dc.contributor.author | 楊依潔 | zh_TW |
dc.date.accessioned | 2021-06-13T16:39:27Z | - |
dc.date.available | 2005-07-28 | |
dc.date.copyright | 2005-07-28 | |
dc.date.issued | 2005 | |
dc.date.submitted | 2005-07-04 | |
dc.identifier.citation | [1] 林仲輝,考慮共用料之供應鏈網路主規劃排程演算法,台灣大學資訊管理研究所碩士論文,民國93年。
[2] 徐昆羿,供應鏈網路之轉換─以最短路徑演算法解決廠商組合問題,台灣大學資訊管理研究所碩士論文,民國89年。 [3] 高郁凱,以連續時間模式解決主規劃排程問題,台灣大學資訊管理研究所碩士論文,民國91年。 [4] 張書豪,接單後生產系統中考量零組件共同性之最佳零組件備料模式,台灣大學商學研究所碩士論文,民國92年。 [5] 謝志欣,供應鏈管理之主規劃排程演算法─以最短路徑演算法滿足訂單需求,台灣大學資訊管理研究所碩士論文,民國90年。 [6] 謝志祥,供應鏈管理之多目標主規劃排程演算法,台灣大學資訊管理研究所碩士論文,民國92年。 [7] Balakrishnan, A. and J. Genunes, “Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning,” Manufacturing & Service Operations Management, Vol.2, No.2, 2000. [8] Bazaraa, M. S., H. D. Sherali, and C. M. Shetty, “Nonlinear Programming: Theory and Algorithms, 2nded,” Wiley, 1993. [9] Beamon, B. M. “Supply Chain Design and Analysis,” International Journal of Production Economics, Vol.55, 1998, pp.281—294. [10] Brailsford, S. C., C. N. Potts, and B. M. Smith, “Constraint Satisfaction Problems: Algorithms and Applications,” European Journal of Operational Research, Vol.119, 1999, pp.557—581. [11] Chopra, S. and P. Meindl, “Supply Chain Management: Strategy, Planning, and Operation,” Prentice-Hall, Inc., 2001. [12] Foster, T. A., “Supply Chain Top 100 Software Vendors,” Logistic Management (2002), Vol.42, Iss.9, 2003, pp.S3—S12. [13] Genues, J., “Solving Large-Scale Requirements Planning Problems with Component Substitution Options,” Computer & Industrial Engineering, Vol.44, 2003, pp.475—491. [14] Haskose, A., B. G. Kingsman, and D. J. Worthington, “Modelling Jobbing Shops as a Queuing Network for Workload Control,” International Journal of Production Economics, Vol.78, 2002, pp.271—285. [15] Hillier, F.S. and M.S. Hillier, “Introduction to Management Science: A Modeling and Case Studies Approach with Spreadsheet, 2nded,” The McGraw-Hill Company, 2003. [16] Krajewski, L. J. and L. P. Ritzman, “Operation Management: Processes and Value Chains, 7thed,” Prentice-Hall, Inc., 2002. [17] Kreipl, S. and M. Pinedo, “Planning and Scheduling in Supply Chains: An Overview of Issues in Practice,” Production and Operation Management Society, Vol.13, No.1, 2004, pp.77—92. [18] Lee, Y. H., C. S. Jeong, and C. Moon, “Advanced Planning and Scheduling with Outsourcing in Manufacturing Supply Chain,” Computers & Industrial Engineering, Vol.43, 2002, pp.351—374. [19] Lee, Y.H. and S. H. Kim, “Production-Distribution in Supply Chain Considering Capacity Constraints,” Computer & Industrial Engineering, Vol.43, 2002, pp.169—190. [20] Lyon, P., R. J. Milne, R. Orzell, and R. Rice, “Matching Assets with Demand in Supply-Chain Management at IBM Microelectronics,” Interfaces, Vol.31, No.1, 2001. [21] Min, H. and G. Zhou, “Supply Chain Modeling: Past, Present and Future,” Computer & Industrial Engineering, Vol.43, 2002, pp.231—249. [22] Moon, C., J. Kim, and E. Hur, “Integrated Process Planning and Scheduling with Minimizing Total Tardiness in Multi-Plants Supply Chain,” Computer & Industrial Engineering, Vol.43, 2002, pp.331—349. [23] Simchi-Levi, D., P. Kaminsky, and E. Simchi-Levi, “Designing and Managing the Supply Chain: Concepts, Strategies, and Case Studies,” USA, The McGraw-Hill Company, 2000. [24] Stadtler, H. and C. Kilger, “Supply Chain Management and Advance Planning: Concepts, Models, Software and Case Studies,” Springer-Verlag Berlin Heidelberg, 2000. [25] Vergara, F. E., M. Khouja, and Z. Michalewicz, “An Evolutionary Algorithm for Optimizing Material Flow in Supply Chains,” Computer & Industrial Engineering, Vol.43, 2002, pp.407—421. [26] Wacker, J.G. and M. Treleven, “Component Part Standardization: Analysis of Commonality Sources and Indices,” Journal of Operations Management, Vol. 6, pp.347—368. [27] Yan, H., Z. Yu, and T. C. E. Cheng, “A Strategic Model for Supply Chain Design with Logical Constraints: Formulation and Solution,” Computer & Operations Research, Vol.30, 2003, pp.2135—2155. [28] ILOG, CPLEX algorithms: http://www.ilog.com/products/cplex/product/algorithms.cfm “ILOG CPLEX 8.0 User’s Manual”, 2002. | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/38620 | - |
dc.description.abstract | 在競爭激烈、變動快速的企業環境下,整合供應鏈成員之進貨、生產、配送時程,發揮整體效益之最大化,為重要之供應鏈管理議題。由於未來環境之變動性,產品結構不再是固定不可變動之設計,而是可以根據實際生產情形、產能限制、存貨狀況等,以替代料取代原始物料而動態改變、具彈性之產品結構。規劃具替代料性質生產排程為重要但複雜之議題,本研究即為考量替代料之主規劃排程研究,屬先進規劃排程中,整合一個月以上至一年內之採購、生產與配銷計畫,並考量物料供給與產能限制,作最佳化之研究。
本研究考量多個最終產品之產品結構,具有替代料及共同料之特性,並考量其替代優先次序與替代成本;期望在有限產能之供應鏈網路架構環境下,規劃訂單需求,選擇適當的期間交由適當的廠商生產處理,以達到最小化訂單延遲成本、最小化替代料使用情形與最小化生產處理、運輸及存貨成本。 供應鏈網路問題一般採用線性規劃與混合整數規劃建立模型並求取最佳解,本研究亦提出一混合整數規劃模型以描述問題,然而當供應鏈網路或訂單規模增大導致問題複雜度增加時,混合整數規劃模型之限制式與變數將快速成長,使模型需要花費大量時間求解或完全無法求得解答;因此本研究提出動態搜尋替代產品結構之啟發性規劃排程演算法,可有效率的完成規劃,並隨時反映訂單處理狀態與產能使用情形。 在啟發性演算法中,首先進行訂單排序,找出最佳分配產能之訂單執行順序後,再一一對訂單進行規劃排程。在對每一張訂單規劃排程時,先尋找原始產品結構下之最小成本廠商組合,若無法滿足需求,則進行調整網路架構以尋找次佳廠商組合;當原始產品結構之產能無法滿足需求時,則依照存貨、產能情形,動態決定替代產品結構。動態決定替代產品結構之方法有二:(1)產品結構分層加入替代料法,此法可保留大部分原產品結構之特性;(2)瓶頸物料填補替代料法,此法則偵測產能不足之物料,有效率的填補產品結構缺漏。最後,本研究建立一規劃排程系統,並進行情境分析之實例討論,以驗證本演算法之效能與效率。 | zh_TW |
dc.description.abstract | In competitive and dynamic business environment, it is significant to integrate and coordinate procurement, production and distribution of members in the supply chain. Owing to the variation of the future, product structure can not be fixed or unchangeable but a flexible bill-of-materials (BOM) which can change dynamically using substitutions according to the actual capacity and inventory condition.
Planning with substitutions is an important, however complex, issue in supply chain management. Considering substitutionality, this study focuses on “Master Planning” of “Advanced Planning and Scheduling”, which is to synchronize the materials along the complete supply chain and to support the decisions during one month to one year on effective utilization of production, transportation and capacity. This study considers the product structures for multiple final products with substitutionality and commonality. Substitute priority and cost are also taken into consideration. With limited capacity in supply chain, this study plans all demand and minimizes the delay cost, penalty of using substitutions and sum of the production cost, holding cost, transportation cost, and inventory cost. In previous study, “Mixed Integer Programming” is a popular way to solve the supply chain problem. In this study, a MIP model is also proposed. However, while the problem gets more complex, MIP model becomes unacceptable in time or unsolved due to the time and resource required. Therefore, this study proposes a heuristic algorithm named “Dynamically Searching Substitute BOM Algorithm, DSSBA” to solve the problem efficiently and satisfy the real business environment needs. In DSSBA, demand orders are sorted based on the requirement of final product, due date, capacity, etc. Then, orders are planned in sequence one by one. The production plan for each order is to find the minimum cost production tree and the available capacity using original BOM. If the demand is not fulfilled completely, the supply chain network structure is modified and then a new minimum cost production tree will be found. If the demand can not be fulfilled using original BOM, substitute BOMs will be used. There are two algorithms to search substitute BOMs: one is “Adding Substitutions by Level”, which retains most of materials of original BOM; the other is “Filling Bottlenecks with Substitutions”, which detects insufficient materials and then complements them. To show the effectiveness and efficiency of DSSBA, a prototype is constructed and scenario analysis is illustrated. | en |
dc.description.provenance | Made available in DSpace on 2021-06-13T16:39:27Z (GMT). No. of bitstreams: 1 ntu-94-R92725003-1.pdf: 1813500 bytes, checksum: f335c9526c656c0e7e3be5f5a14cb15a (MD5) Previous issue date: 2005 | en |
dc.description.tableofcontents | 謝詞 一
中文摘要 二 THESIS ABSTRACT 三 目錄 四 圖目錄 七 表目錄 十 第一章、 緒論 1 第一節、 研究動機 1 第二節、 研究目的 4 第三節、 研究範圍 5 第四節、 研究架構 6 第二章、 文獻探討 8 第一節、 供應鏈與供應鏈管理之定義 8 第二節、 供應鏈管理之作法、研究範疇與模式分類 9 2-2-1、供應鏈管理之作法 9 2-2-2、供應鏈管理之研究範疇 10 2-2-3、供應鏈管理之模式分類 10 第三節、 先進規劃排程 11 第四節、 替代料相關研究與探討 14 第五節、 規劃排程問題之方法論 16 2-5-1、線性規劃與混合整數規劃 16 2-5-2、拉氏釋限法 17 2-5-3、基因演算法 17 2-5-4、限制規劃法 18 2-5-5、啟發式演算法 19 第三章、 問題描述與混合整數線性規劃模型 21 第一節、 問題描述 21 3-1-1、產品結構 22 3-1-2、供應鏈網路架構 28 3-1-3、規劃時距 30 3-1-4、訂單資訊 31 第二節、 假設條件 32 第三節、 混合整數線性規劃模型 35 3-3-1、混合整數線性規劃模型之變數 35 3-3-2、混合整數線性規劃模型之限制式 38 3-3-3、混合整數線性規劃模型之目標函式 39 3-3-4、多目標之混合整數線性規劃模型 40 3-3-5、複雜度分析 42 第四節、 混合整數線性規劃模型之限制 43 第四章、 動態決定替代產品結構之啟發性規劃排程演算法 46 第一節、 規劃排程演算法之前置作業 48 4-1-1、原始網路架構 48 4-1-2、依最終產品之產品結構建構子網路並設定成本 49 4-1-3、搜尋最小成本樹 50 第二節、 訂單排序演算法 51 第三節、 規劃排程演算法之詳細流程—產品結構分層加入替代料法 ------------------------------------------------------------------- 59 第四節、 瓶頸物料填補替代料法 75 第五節、 複雜度分析 82 第五章、 系統說明與模式分析 86 第一節、 規劃排程系統說明 86 5-1-1、資料結構 86 5-1-2、系統畫面與執行步驟 91 第二節、 演算法與混合整數線性規劃模型之情境設計 93 第三節、 演算法與混合整數線性規劃模型之實例討論 98 5-3-1、低共用、簡單替代、需求小、產能鬆 99 5-3-2、低共用、簡單替代、需求小、產能緊 101 5-3-3、低共用、簡單替代、需求大、產能鬆 107 5-3-4、低共用、簡單替代、需求大、產能緊 109 5-3-5、低共用、複雜替代、需求小、產能鬆 113 5-3-6、低共用、複雜替代、需求小、產能緊 115 5-3-7、低共用、複雜替代、需求大、產能鬆 118 5-3-8、低共用、複雜替代、需求大、產能緊 120 5-3-9、高共用、簡單替代、需求小、產能鬆 124 5-3-10、高共用、簡單替代、需求小、產能緊 125 5-3-11、高共用、簡單替代、需求大、產能鬆 127 5-3-12、高共用、簡單替代、需求大、產能緊 129 5-3-13、高共用、複雜替代、需求小、產能鬆 131 5-3-14、高共用、複雜替代、需求小、產能緊 133 5-3-15、高共用、複雜替代、需求大、產能鬆 135 5-3-16、高共用、複雜替代、需求大、產能緊 138 5-3-17、ASL與FBS演算法之情境比較 140 第四節、 演算法之效能分析 143 第五節、 真實案例測試 145 第六節、 演算法之規劃結果與最佳解之差異分析 147 5-6-1、訂單排序演算法之影響 147 5-6-2、選擇生產樹使用貪婪演算法之影響 148 5-6-3、存貨成本處理方式之影響 148 5-6-4、尋找替代料演算法之影響 149 第六章、 結論 150 第一節、 總論 150 第二節、 未來研究方向 151 參考文獻 152 附錄A、尋找替代料演算法之虛擬程式碼 154 附錄B、演算法之規劃排程結果 156 | |
dc.language.iso | zh-TW | |
dc.title | 供應鏈網路中考量替代料之主規劃排程演算法 | zh_TW |
dc.title | A Heuristic Master Planning Algorithm for Supply Chain Network with Substitutionality | en |
dc.type | Thesis | |
dc.date.schoolyear | 93-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 蔣明晃(David Ming-Huang Chiang),許鉅秉(Jiuh-Biing Sheu),翁崇雄(Chorng-Shyong Ong) | |
dc.subject.keyword | 供應鏈管理,先進規劃排程,主規劃排程,啟發式演算法,產品結構,替代料, | zh_TW |
dc.subject.keyword | Supply Chain Management,Advanced Planning and Scheduling,Master Planning,Heuristic Algorithm,Substitutions, | en |
dc.relation.page | 186 | |
dc.rights.note | 有償授權 | |
dc.date.accepted | 2005-07-05 | |
dc.contributor.author-college | 管理學院 | zh_TW |
dc.contributor.author-dept | 資訊管理學研究所 | zh_TW |
顯示於系所單位: | 資訊管理學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-94-1.pdf 目前未授權公開取用 | 1.77 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。