請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/33591
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 郭斯傑(Sy-Jye Guo) | |
dc.contributor.author | Bing-Hong Chen | en |
dc.contributor.author | 陳炳宏 | zh_TW |
dc.date.accessioned | 2021-06-13T04:49:10Z | - |
dc.date.available | 2006-07-28 | |
dc.date.copyright | 2006-07-28 | |
dc.date.issued | 2006 | |
dc.date.submitted | 2006-07-16 | |
dc.identifier.citation | 英文參考文獻
Bing Li , A. Akintoye ,P. J. Edwards and C. Hardcastle(2005).“Critical success factors for PPP/PFI projects in the UK construction industry.” Construction Management and Economics, 459-471. HM Treasury(2004).”Standardisation of PFI Contracts Version 3”,UK. Lin Qiao ,Shou Qing Wang ,Robert L. K. Tiong and Tsang-Sing Chan(2001)“Framework for Critical Success Factors of BOT projects in China.” The Journal of Project Finance, 53-61 Mohamed M. Askar and Ahmed A. Gab-Allah(2002).“Problems facing parties involved in Build, Operate, and Transport projects in Egypt.” Journal of Management in Engineering, ASCE, 173-178. Mott MacDonald(2002).“Review of large public procurement in the UK.”,Surrey,UK. NAO(1999).“Examining the Value For Money of Deals Under the Private Finance Initiative.” UK. NAO(2003).“PFI : Construction Performance.” The Stationary Office,London,UK. Robert L. K. Tiong ,Khim-Teck Yeo and S. C, McCarthy(1992).“Critical success factors in winning BOT contracts.” Journal of Construction Engineering and Management, ASCE, 217-228. Robert L. K. Tiong(1990).“Comparative study of BOT projects” Journal of Management in Engineering, ASCE, 107-122. Robert L. K. Tiong(1995).“Risks and guarantees in BOT tender.” Journal of Construction Engineering and Management, ASCE, 183-188. Robert L. K. Tiong(1996).“CSFs in competitive and negotiation model for BOT projects.” Journal of Construction Engineering and Management, ASCE, 205-211. Rukuts(2004).“PPP Projects in the United Kingdom : the Successes and Failures.” HKIS 20th Anniversary Conference on Public Private Partnerships,London,UK. 中文參考文獻 內政部營建署,「九十四年度營建知識管理系統-建構營建產業知識地圖、分類架構及知識交流標準」,成果報告書,台北(2005)。 太平洋島國際管理顧問有限公司,「富源森林遊樂區投資執行計畫書」,台北(2004)。 王明德、王文宇、黃明聖、張倩瑜、邱必洙,「民間參與公共建設國際案例分析」,研究報告,行政院公共工程委員會,台北(2003)。 王明德、張倩瑜、邱必洙、荷世平,「民間參與公共建設政策之績效評估制度及其運作機制之建置(第一期)」,研究報告,行政院公共工程委員會,台北(2004)。 王鎮凡,「民間參與公共工程施工品質管理制度之研究」,碩士論文,國立中央大學土木工程研究所,桃園(2002)。 王寶玲,「民間參與公共建設投資契約標準文件及要項之研議」,研究報告,行政院公共工程委員會,台北(2002)。 世新大學、世新大學,「華僑會館委託民間營運專案-投資計畫書」,台北(2002)。 台中市政府、鄉林建設公司,「台中國際會議及展覽中心開發興建暨營運契約」,台中(2004)。 台北縣政府、游泳家股份有限公司,「台北縣秀朗國民小學游泳館投資契約」,台北(2002)。 交通部基隆港務局、台北港貨櫃碼頭股份有限公司,「台北港貨櫃儲運中心興建暨營運契約書」,基隆(2003)。 交通部基隆港務局業務組,「民間機構參與興建暨營運台北港貨櫃儲運中心計畫之執行經驗」,基隆(2003)。 交通部臺灣鐵路管理局,「萬華(東、西)車站大樓民間參與興建營運案申請須知」,台北(2005)。 交通部臺灣鐵路管理局,「萬華(東、西)車站大樓民間參與興建營運案興建營運契約草案」,台北(2005)。 行政院公共工程委員會,「研商僑委會華僑會館委託經營計畫促參案營運情形會議」,台北(2005)。 行政院公共工程委員會網站(http://www.pcc.gov.tw/)。 行政院農業委員會林務局,「徵求民間參與興建暨營運富源森林遊樂區案申請須知」,台北(2003)。 行政院環境保護署,「鼓勵公民營機構興建營運一般事業廢棄物(含垃圾焚化灰渣)最終處置場設置計畫」,台北(2002)。 李長平,「台北縣政府鼓勵民間機構興建營運一般事業廢棄物(含垃圾焚化灰渣)BOO最終處置場設置計畫之執行經驗」,台北(2003)。 林偉崇,「改由政府辦理或解約之民參案例分析暨退場機制初步探討」,中華技術第69期,台北(2005)。 林澔貞、盧英秀,「民間機構參與興建暨營運富源森林遊樂區案之執行經驗」,台北(2004)。 洪建智,「BOT工程管理機制之研究」,碩士論文,國立台灣大學土木工程學研究所,台北(2004)。 英國財政部(HM Treasury)網站(http://www.hm-treasury.gov.uk/)。 英國副首相辦公室(Office of the Deputy Prime Minister)網站(http//www.local.odpm.gov.uk/)。 展頡知識管理顧問公司譯,「專案管理知識體系指南」中文版,台北(2003)。 馬惠美,「從促進民間參與公共建設法論公權力之監督管理與BOT契約之執行-以高速鐵路及捷運建設為中心」,碩士論文,東海大學法律學研究所,台中(2002)。 國立中正大學,「國立中正大學第三期學生宿舍民間參與興建營運招商作業案契約草案」,嘉義(2004)。 國立中正大學,「國立中正大學第三期學生宿舍民間參與興建營運招商作業案執行經驗」,嘉義(2004)。 國立台灣大學、波若國際有限公司,「國立臺灣大學第二學生活動中心地下會議中心及二樓空間設施委託營運合約」,台北(2003)。 國道新建工程局辦理東西向快速公路八里新店線八里五股段暨代辦內政部營建屬2-3A、2-3Z標工程施工期程檢討報告,台北(2005)。 崔君瑋,「我國公共建設BOT計劃主辦機關之法律地位-以烏日垃圾焚化廠之興建營運為例」,碩士論文,東海大學法律學研究所,台中(2002)。 張倩瑜、王明德,”推動促參政策的目標是什麼?以英國經驗為例”,台灣經濟論衡,台北(2005)。 理律法律事物所、普華國際財務顧問公司,「僑務委員會-華僑會館委託民間參與營運招商作業案-先期計畫書」,台北(2002) 莊曜聰,「BOT計畫之政府監督管理程度」,碩士論文,國立成功大學土木工程研究所,台南(2003)。 郭斯傑、王寶玲、張倩瑜、邱必洙,「促參案件履約階段執行經驗調查與建議」,研究報告,行政院公共工程委員會,台北(2005)。 彭振聲,「高雄市楠梓污水下水道系統(政府規劃)BOT委託技術服務案之執行經驗」,高雄(2005)。 彭振聲、魏家傑、梁書華,「國內首宗以民間參與方式辦理之污水下水道系統-高雄市楠梓污水下水道系統BOT案」,中華技術第68期,台北(2005)。 鄉林建設公司,「台中國際會議及展覽中心」,台中(2004)。 馮正民、葉德建、林建元、邱裕鈞,「研擬民間參與公共建設整體作業手冊」,研究報告,行政院公共工程委員會,台北(2001)。 黃玉霖、王文宇、李孝安、張倩瑜、邱必洙,「各類型民間參與公共建設案件執行成效之調查與分析」,研究報告,行政院公共工程委員會,台北(2003)。 黃森義,「民間參與公共建設融資風險之相關研究」,研究報告,行政院公共工程委員會,台北(2003)。 葉明源,「國立臺灣大學第二學生活動中心部分空間委託民間營運案執行經驗」,台北(2003)。 詹中原,「民營化政策-公共行政理論與實務之分析」,五南圖書出版,台北(1994)。 僑務委員會,「僑務委員會-華僑會館委託民間營運契約書」,台北(2002)。 熊彬成、陳寬享,”英國推動民間參與公共建設之作法與發展現況”,(2003)。 劉憲宗、郭斯傑、林明鏘,「台北市中小學校舍建築執照補照可行性研究--以台北市中正區忠義國小忠義樓為例」,台北(2006)。 歐洲隧道(Eurotunnel)網站(http://www.eurotunnel.com/ukcP3Main/ukcCorporate/)。 鄭錫禧,「民間機構參與興建暨營運台中國際會議及展覽中心開發案之執行經驗」,台中(2005)。 羅建龍,「BOT營運績效評估模式研究與建立」,碩士論文,國立台灣科技大學營建工程系,台北(2000)。 | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/33591 | - |
dc.description.abstract | 根據工程會95年第一季已簽約促進民間參與公共建設案件辦理情形之彙整,91至95年第一季完成簽約之311件列管案件中,曾經發生進度落後情形者有78件(25.08%),解除契約者有6件(1.93%);而目前尚在列管中的231件案件中,進度落後者尚有41件(17.75%),在41件案例中解除契約者亦有3件(1.52%)。上述履約困難案件之產生,或係契約履行過程存在若干障礙,或係前置作業仍有不足之處所致,亟待有系統地調查、釐清其成因。
由於國內相關的學術焦點皆在討論可行性評估或招商階段之研究,對促參案件履約階段發生困難的研究相當缺乏,然而就促參案件之生命週期而言,投資契約簽訂之後,才代表主辦機關與民間機構夥伴關係的真正開始,在未來10到50年之履約期限內,促參案件該如何完成預期的興建、營運工作,並且如期如質的提供該項公共建設服務,是促參案件成功的重要課題,故對於履約階段發生的困難有其深入研究之必要。 本文蒐集的履約困難案例包含不同的促參方式(BOT,BOO,ROT,OT)以及各種建設類別(交通建設,文教設施,環境汙染防治設施,農業設施,污水下水道設施,重大工商業設施,運動設施,衛生醫療設施,觀光遊憩設施,社會福利設施),案例金額分佈自500萬元至200億元,履約期限自3年到60年不等,藉以分析國內促參案件履約進度落後情形。 研究方法採用文獻回顧與專家訪談,彙整歸納出國內促參案件關鍵失敗因子有以下幾點:(1)行政審查配合;(2)政府承諾事項;(3)法令認知差異;(4)資金取得困難;(5)違反契約規定;(6)營運收入風險;(7)當地民眾抗爭;(8)履約進度落後。 本研究利用系統圖的方式表達關鍵失敗因子與原因之間的關係,提供政府機關預防或減少促參案件履約困難發生,同時作為民間企業投資促參專案的可行性評估依據。 | zh_TW |
dc.description.abstract | Based on the awareded PPIP(Private Participation in Infrastructure Projects)cases until the first season of 2006 from Public Construction Commission, 78 projects(25.08%)were behind schedule and 6 projects(1.93%) were early terminated in 311 projects. In 231 register projects, there were 41 delayed projects(17.75%)and 6 canceled projects(1.93%)as well. The causes, conditions, and processes behind the implementation of these problematic PPIP projects need to be investigated and analyzed.
Lack of in-depth discourse and research on the difficulties in the PPIP, with long contractual period throughout 10 to 50 years, it is critical to provide a long-term response to fulfill the requirement of project management and the expectations of stakeholders and citizens at construction and operation stages. Accordingly, this research aimed to investigate the potential problems for implementing PPIP projects in current circumstance and to analysze the causes, conditions, and processes. The experience of construction and operation in selected cases from Taiwan have been documented in adequate details, including different types of private participation(BOT, BOO, ROT, and OT)and facilities(transportation, cultural and education, agriculture, water and sewerage, industrial and commercial, medical treatment).The amount of selected cases range from half of million to 20 billion NT dollars, and the contractual period were scatter from 3 to 60 years. The methodology of this research was literature study and interview from experts. The Critical Failure Factors (CFF) for the public-private partnerships (PPP), generalized from Taiwanese cases, include: (1) Deficient approval process; (2) Delay execution of government’s commitment; (3) Cognitive difference about regulations; (4) Difficulty in loan acquisition; (5) Different interpretation of contractual clauses; (6) Overoptimistic estimate of operating incomes; (7) Opposition from the community; and (8) Delay execution of contract’s implement. The relationship between these Critical Failure Factors and their causal factors are represented in the form of the systematic diagram. The government will be able to prevent and reduces the potential problems of PPP cases. The private enterprises will be able to evaluate the project viability of PPP over the long-term contractual period. | en |
dc.description.provenance | Made available in DSpace on 2021-06-13T04:49:10Z (GMT). No. of bitstreams: 1 ntu-95-R93521711-1.pdf: 2957473 bytes, checksum: 6692c7f7dacac2d2693406f854330c56 (MD5) Previous issue date: 2006 | en |
dc.description.tableofcontents | 誌謝 一
摘要 三 Abstract 四 目錄 五 圖目錄 九 表目錄 一一 第1章 緒論 1 1-1 研究動機 1 1-2 研究目的 2 1-3 研究範圍與限制 2 1-3-1 研究範圍 2 1-3-2 研究限制 3 1-4 研究方法 3 1-5 研究內容與流程 4 1-5-1 研究內容 4 1-5-2 研究流程 5 第2章 文獻回顧 7 2-1 國內外促參現況 7 2-1-1 國內促參現況 7 2-1-2 英國PFI制度概況 14 2-1-3 我國促參制度與英國PFI制度之比較 19 2-2 英國PFI制度關鍵成功因素(Critical Success Factors,CSFs) 21 2-3 促參建設之履約管理 26 2-3-1 履約困難定義 26 2-3-2 現行法令相關規定 28 2-3-3 相關文獻論述 32 第3章 履約困難之促參案例分析 39 3-1 國內外履約困難促參案例概述 39 3-1-1 國內履約困難促參案例概述 39 3-1-2 國外履約困難促參案例概述 43 3-1-3 小結 44 3-2 僑委會華僑會館OT計畫 45 3-2-1 計畫背景介紹 45 3-2-2 執行狀況與困難 48 3-2-3 目前因應作法與分析 49 3-3 秀朗國小游泳池BOT計畫 51 3-3-1 計畫背景介紹 51 3-3-2 執行狀況與困難 54 3-3-3 目前因應作法與分析 55 3-4 國立台灣大學第二學生活動中心部分空間OT計畫 57 3-4-1 計畫背景介紹 57 3-4-2 執行狀況與困難 61 3-4-3 目前因應作法與分析 62 3-5 台北縣一般事業廢棄物最終處置場BOO計畫 64 3-5-1 計畫背景介紹 64 3-5-2 執行狀況與困難 67 3-5-3 目前因應作法與分析 68 3-6 台北港貨櫃儲運中心BOT計畫 70 3-6-1 計畫背景介紹 70 3-6-2 執行狀況與困難 74 3-6-3 目前因應作法與分析 76 3-7 農委會富源森林遊樂區ROT計畫 78 3-7-1 計畫背景介紹 78 3-7-2 執行狀況與困難 83 3-7-3 目前因應作法與分析 84 3-8 台中國際會議暨展覽中心BOT計畫 85 3-8-1 計畫背景介紹 85 3-8-2 執行狀況與困難 90 3-8-3 目前因應作法與分析 90 3-9 國立中正大學第三期學生宿舍BOT計畫 91 3-9-1 計畫背景介紹 91 3-9-2 執行狀況與困難 97 3-9-3 目前因應作法與分析 98 3-10 高雄市楠梓污水下水道系統BOT計畫 101 3-10-1 計畫背景介紹 101 3-10-2 執行狀況與困難 104 3-10-3 目前因應作法與分析 106 3-11 台鐵萬華車站大樓BOT計畫 109 3-11-1 計畫背景介紹 109 3-11-2 執行狀況與困難 113 3-11-3 目前因應作法與分析 113 3-12 履約困難經驗啟示 115 第4章 促參案件關鍵失敗因子(Critical Failure Factors,CFFs) 117 4-1 關鍵失敗因子概述 117 4-2 國內促參案例之關鍵失敗因子 122 4-3 關鍵失敗因子改善方法 124 第5章 結論與建議 133 5-1 結論 133 5-2 建議 135 5-3 後續研究 139 參考文獻 141 英文參考文獻 141 中文參考文獻 141 附錄一 國內履約困難促參案件列表 145 附錄二 訪談紀要 149 附 2-1 僑委會華僑會館OT計畫 149 附 2-2 秀朗國小游泳池BOT計畫 150 附 2-3 國立台灣大學第二學生活動中心部分空間OT計畫 152 附 2-4 台北縣一般事業廢棄物最終處置場BOO計畫 154 附 2-5 台北港貨櫃儲運中心BOT計畫 155 附 2-6 農委會富源森林遊樂區ROT計畫 158 附 2-7 台中國際會議暨展覽中心BOT計畫 161 附 2-8 國立中正大學第三期學生宿舍BOT計畫 162 附 2-9 高雄楠梓污水下水道系統BOT計畫 163 附 2-10 台鐵萬華車站大樓BOT計畫 164 簡歷 166 | |
dc.language.iso | zh-TW | |
dc.title | 民間參與公共建設履約困難案例之研究 | zh_TW |
dc.title | Critical Failure Factors for Public-Private Partnerships Projects in Taiwan. | en |
dc.type | Thesis | |
dc.date.schoolyear | 94-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 王明德(Ming-De Wang),王隆昌(Long-Chang Wang),邱必洙(Pi-Chu Chiu) | |
dc.subject.keyword | 關鍵失敗因子,民間參與公共建設,履約困難, | zh_TW |
dc.subject.keyword | Critical Failure Factors,Private Participation in Infrastructure Projects,Contract Implementation with Problem, | en |
dc.relation.page | 167 | |
dc.rights.note | 有償授權 | |
dc.date.accepted | 2006-07-17 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-95-1.pdf 目前未授權公開取用 | 2.89 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。