請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/33334
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 曾惠斌 | |
dc.contributor.author | Kun-Tien Lin | en |
dc.contributor.author | 林坤田 | zh_TW |
dc.date.accessioned | 2021-06-13T04:35:10Z | - |
dc.date.available | 2007-07-25 | |
dc.date.copyright | 2006-07-25 | |
dc.date.issued | 2006 | |
dc.date.submitted | 2006-07-20 | |
dc.identifier.citation | 參考文獻
1. Albert P.C. Chan, Danny C.K. Ho,C.M.Tam,(2001) 'Design and Build Projects Success Factors Multivariate Analysis', Journal of Construction Engineering and Management, 127, 93-100. 2. Anthony D. Songer,Keith r.Molenaar,(1996) 'Selecting Design-Build:Public and Private Sector Owner Attitudes', Journal of Management in Engineering,12, 47-53. 3. Anthony D. Songer,Keith R.Molenaar,(1997) 'Project Characteristics for Successful Public Sector Design-Builder ', Journal of Construction Engineering and Management, 123, 34-40. 4. Chan, A.C., Ho, D.K. and Tam, C.M. (2001) 'Design and Build Projects Success Factors Multivariate Analysis', Journal of Construction Engineering and Management, 127, 93-100. 5. DBIA of U.S.A. (2001). ' Design-Build Single Source Book' January. 6. Friedlander,(1998) ' Design-Build Solution', Journal of Management in Engineering, 14, 59-64. 7. Songer, A.D. and Molenaar, K.R.,(1996) 'Selecting Design-Build:Public and Private Sector Owner Attitudes', Journal of Management in Engineering,12, 47-53. 8. Songer, A.D. and Molenaar, K.R., (1997) 'Project Characteristics for Successful Public Sector Design-Builder ', Journal of Construction Engineering and Management, 123, 34-40. 9. 林文盛(1994) ,「公共工程統包制度之研究」,台灣科技大學營建工程系,碩士論文。 10. 陶家偉、梁樾等(1994),「公共工程統包制度之研究」,行政院公共建設督導會報專案研究計畫成果報告,台北。 11. 黎煥霖(1994),「同步相量量測值在電力系統暫態穩定度即時預測的應用」,台灣大學電機工程研究所,碩士論文。 12. 宋伯永(1995),「工程統包制度淺談」,水利,5期,頁167-172。 13. 王啟元、陳邁、李得璋(1995),「建築工程施行設計與施工結合(Design-Build)制度之可行性分析」,台灣省政府住宅及都市發展局。 14. 行政院公共工程委員會(1998),「統包實施辦法、最有利標評選辦法」,台北。 15. 蔡國龍(1999),「統包策略運用於新市鎮公共工程之研究」,中華大學土木工程系,碩士論文。 16. 蔡登峰(2000),「臺灣地區大型垃圾焚化場統包工程績效之研究」,高雄第一科技大學營建工程研究所,碩士論文。 17. 施明賢(2000),「統包工程業主基本設計完成度對工程成本與工期之影響—以學校建築工程為例」,高雄第一科技大學營建工程研究所,碩士論文。 18. 李得璋(2000),「公共工程統包制度之推動」,營建工程統包制度研討會,台北,第Π-1-32頁。 19. 曾惠斌等(2001),「以統包制度加速推動國家計劃之研究」,行政院公共工程委員會研究報告120。 20. 「政府採購法令彙編」,行政院公共工程委員會(2001),台北。 21. 廖宗盛(2002),「公共工程統包制度執行問題研析與改進對策之研究」,國立台灣大學土木工程研究所,博士論文。 22. 戴期甦(2002),「成功設計管理因素之探討」,中華大學營建管理研究所,碩士論文。 23. 卓正倫(2002),「設計完成度審查模式之研究」,國立交通大學土木工程研究所,碩士論文。 24. 林裕修(2002),「公有建築以統包方式辦理在需求規範訂立及其變動影響之研究」,朝陽科技大學營建工程研究所,碩士論文。 25. 郭明祥(2002),「高科技廠房採用統包方式之執行面缺失與設計作業關聯性之探討」,交通大學土木工程研究所,碩士論文。 26. 賴銘利(2002),「界面作業群組化管理模式之實務運用探討」,國立交通大學土木工程研究所,碩士論文。 27. 詹堯安(2003),「設計與施工界面問題之研究—以公路工程為案例」,高雄第一科技大學營建工程研究所,碩士論文。 28. 林家煌(2003),「公共工程統包專案設計管理之之研究」,國立台灣大學土木工程研究所,碩士論文。 29. 陳淑君(2003),「公共工程統包採購制度執行最有利標選商評選項目之研究」,國立台灣大學土木工程研究所,碩士論文。 30. 陳振川(2005),「台灣大學推動統包與最有利標經驗及效益之研究」,國立台灣大學前營繕組組長。 31. 郭奉宜(2005),「統包工程之進度規劃模式」,國立交通大學土木工程研究所,碩士論文。 32. 行政院公共工程委員會(2005),「統包模式之工程進度及品質管理參考手冊」,台北。 33. 蕭新祿(2005),「工程採取統包模式及傳統模式之案例比較」,逢甲大學大學土木工程研究所,碩士論文。 34. 行政院公共工程委員會(2006),「統包制度及統包工程執行情形之研討」,台北。 | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/33334 | - |
dc.description.abstract | 摘 要
統包工程之優點與功效,已經獲國內外產、官、學界人士一致的肯定,我國的公共工程建設也正逐漸採取此種模式,且比例逐年上升中。 近年來,國內有關統包工程的研究報告為數甚多,但多以業主角度觀察所得;而工程實際執行單位在統包商,且統包工程之責任大多在統包商身上,但可供其參考之資料卻嫌不足。因此,本研究針對統包工程之部分進度管理重點,以統包商角度說明其控管應注意事項。 統包建築工程工種、材料多,施工界面、步驟繁複,且工種作業交替多,其設計、施工複雜性,協調整合困難度,均較其他類型統包工程複雜。因此,本研究以較複雜的統包建築工程為例以探討統包工程,乃希望本研究成果適用於各類型統包工程。 本研究之統包工程進度因素構面,乃以公共工程委員會所彙編統包模式之工程品質與進度管理參考手冊中統包商履約各階段工作項目內容為基礎,並加上進度控管所需增列之部分工程項目及里程碑等彙整而成。問卷調查表之製作則以統包工程進度因素構面之內容為基礎,並利用層級分析法(AHP)及序位法作統計分析,求得影響統包工程各階段進度因素之相對權重及序位,以提供工程界人士執行統包工程進度時之參考,使進度管理能對症下藥、充分掌控,風險降至最低,工程得以如期、如質順利運作,終而獲利。 | zh_TW |
dc.description.abstract | Abstract
Several advantages and the efficiency of Design-Build construction have been confirmed by the academia, administration and enterprise. There is a tendency that this construction procurement model will be the main stream in our country gradually. In recent years, lots of literatures related to Design-Build construction were published in Taiwan. Nevertheless, most of them were written from the viewpoint of owner. In fact, the liability of construction execution is primarily depended on the contractor and only few materials about this concern could be referred. For this reason, we would like to investigate the key factor affecting the schedule of Design-Build construction from the viewpoint of contractor in this thesis. Design-Build architectural constructions are more complex than other kind of Design-Build constructions, since there are more materials, working steps and complication of work interfaces. This thesis focuses on Design-Build architectural constructions and hope that it can be employed in all Design-Build constructions. The contents of the work items in this thesis are on the basis of the reference book “Quality and Schedule Management of Design-Build Constructions” edited by Public Construction Commission, Executive Yuan. In addition, we have added some work items such as milestone in the thesis; hoping the framework would be more complete so it is more convenient for people to carry out construction schedule control. The questionnaires included in this thesis are based on the factor phase of Design-Build schedule control. Besides, we use AHP (Analysis Hierarchy Process)and ranking method to perform statistical analysis so that we can get the relative weight or sequence of the key factors in Design-Build construction schedule control. All of the results could be offered as engineer’s reference and might be employed in engineering implementation; with lowest risks and cost-effective management engineers can achieve the duration and quality control of the constructions as expected. | en |
dc.description.provenance | Made available in DSpace on 2021-06-13T04:35:10Z (GMT). No. of bitstreams: 1 ntu-95-P92521707-1.pdf: 729761 bytes, checksum: dcc8b68a772cc42444673eb88c1968e5 (MD5) Previous issue date: 2006 | en |
dc.description.tableofcontents | 目 錄
誌謝…………………………………………………………………………………………..一 摘要……………………………………………………………………….………………….二 Abstract……………………………………………………………………………….………三 目錄………………………………………………………………………….……………….四 圖目錄………………………………………………………………………………………..六 表目錄………………………………………………………………………….…………….七 第一章 緒論…………………………………………………………………..………………1 1.1. 前言…………………………………………………………………………..…………..1 1.2. 研究動機與目的………………………………………………………..………………..2 1.2.1研究動機………………………………………………………..…………………….2 1.2.2研究目的…………………………………………………………..………………….2 1.3. 研究範圍與限制……………………………………………………..…………………..3 第二章 文獻回顧……………………………………………………………..………………4 2.1 統包之定義……………………………………………………………………………….4 2.1.1國外文獻………………………………………………………………………...........4 2.1.2 國內文獻……………………………………………………………………………..5 2.2 統包工程基本理念及優缺點………………………………………….….……………...6 2.2.1 統包基本理念…………………………………………………….….………………6 2.2.2 統包工程之優缺點及特性…………………………………….………….…………7 2.3工程設計管理………………………………………………………….…….……………9 2.3.1 統包建築工程設計進度相關文獻回顧………………………….…………………10 2.4工程施工管理相關文獻……………………………………………….…………………11 2.5工程界面管理………………………………………………………….…………………12 2.5.1.界面之定義…………………………………………………………….…………….12 2.5.2.界面管理問題分析………………………………………………….……………….12 2.5.3.工程技術界面問題……………………………………………….………………….12 2.6小結……………………………………………………………………….………………13 第三章 研究模式……………………………………………………………….……………14 3.1. 研究方法與流程………………………………………………………….……………..14 3.2統包工程進度常見缺失………………………………………………….………………17 3.2.1統包工程進度常見缺失………………………………………….………………….17 3.2.2 統包工程專家訪談進度延誤原因彙整……………………….……………………18 3.3構面之建立………………………………………………………….……………………18 3.4問卷設計及統計分析……………………………………………….……………………21 3.4.1問卷設計方式………………………………………………….…………………….21 3.4.2 AHP統計分析方法說明…………………………………….………………………21 3.5序位法問卷方法說明………………………………………………….…………………25 3.6小結…………………………………………………………………….…………………25 第四章 問卷分析說明…………………………………………………….…………………27 4.1問卷數量及對象分析說明………………………………………….……………………27 4.1.1 AHP問卷數量及對象分析表……………………………….…………………….27 4.1.2 序位問卷數量及對象分析表………………………………………………….……27 4.2 AHP問卷結果分析說明………………………………………………………………....28 4.2.1 構面第一層履約各階段之權重分析說明………………………………………….. ..29 4.2.2 統包工程細部設計及開工前之準備工作-基地調查及障礙排除………………...30 4.2.3 統包工程履約各階段之協調整合…………………………………….……………32 4.2.4 細部設計階段問卷結果分析說明……………………………………………….…33 4.2.5 細部設計階段進度控管綜合分析……………………………………….…………36 4.2.6 施工履約(開工前)階段問卷結果分析說明………………………….…………….37 4.2.7 施工履約(施工中)階段問卷結果分析說明…………………….………………….40 4.2.8 施工履約(竣工驗收)階段問卷結果分析說明………………………….………….44 4.2.9 施工履約(工程接管)階段問卷結果分析說明………………………….………….45 4.2.10 AHP問卷結果整體分析………………………………………………….………..46 4.3序位法問卷結果分析…………………………………………………………………….47 4.3.1. 細部設計階段……………………………………………………………………....47 小結…………………………………………………………………………………….…..64 第五章 案例探討……………………………………………………………………….……67 5.1實例探討分析………………………………………………………………………….…67 5.1.1實例探討一…………………………………………………………………….…….67 5.1.2實例探討二………………………………………………………………….……….72 5.1.3實例探討三………………………………………………………………….……….75 5.2小結…………………………………………………………………………….…………78 第六章 結論與建議………………………………………………………………….………80 6.1結論…………………………………………………………………….…………………80 6.2本研究之貢獻………………………………………………………….…………………85 6.3對本研究之建議………………………………………………………….………………85 6.3.1. 統包商應具備條件之建議………………………………………….……………...85 6.3.2. 對統包工程推展之建議…………………………………………….……………...86 6.3.3.統包商對建照申請有關之審查進度控管之建議…………………….…………….87 6.4 對後續研究之建議………………………………………………………….…………...87 參考文獻……………………………………………………………………….……………..89 附錄…………………………………………………………………………….……………..91 簡歷 | |
dc.language.iso | zh-TW | |
dc.title | 統包工程進度之因素分析-以建築工程為例 | zh_TW |
dc.title | Factor Analysis of the Schedule of Design-Build Construction-An Example of Architectural Construction | en |
dc.type | Thesis | |
dc.date.schoolyear | 94-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 林國峰,廖宗盛,陳永祥 | |
dc.subject.keyword | 1.統包工程,2.層級分析法,3.序位法,4.里程碑, | zh_TW |
dc.subject.keyword | 1.Design-Build construction,2. AHP(Analysis Hierarchy Process), | en |
dc.relation.page | 106 | |
dc.rights.note | 有償授權 | |
dc.date.accepted | 2006-07-20 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-95-1.pdf 目前未授權公開取用 | 712.66 kB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。