請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/30446完整後設資料紀錄
| DC 欄位 | 值 | 語言 |
|---|---|---|
| dc.contributor.advisor | 許銘熙 | |
| dc.contributor.author | Shih-Feng Chung | en |
| dc.contributor.author | 鍾世豐 | zh_TW |
| dc.date.accessioned | 2021-06-13T02:03:58Z | - |
| dc.date.available | 2008-07-16 | |
| dc.date.copyright | 2007-07-16 | |
| dc.date.issued | 2007 | |
| dc.date.submitted | 2007-07-04 | |
| dc.identifier.citation | 參考文獻
1. Chiang, Y. M., Chang, L. C., and Chang, F. J., 2004, Comparison of static-feedforward and dynamic-feedback neural networks for rainfall-runoff modeling, Journal of Hydrology, volume 290, pp.297-311. 2. Chang, F. J., Chang, L. C., and Chiang, Y. M., 2005, Reply on ‘Comparison of static-feedforward and dynamic-feedback neural networks for rainfall-runoff modeling’ by Y.M. Chiang, L.C. Chang and F.J. Chang, 2004, Journal of Hydrology 290, 297-311., Journal of Hydrology, volume 314, pp.204-206. 3. Chang, F. J. and Chang, Y. T., 2006, Adaptive neuro-fuzzy inference system for prediction of water level in reservoir, Advances in Water Resources, volume 29, pp.1-10. 4. Forster, S., Kneis, D., Gocht, M., and Bronstert, A., 2005, Flood risk reduction by the use of retention areas at Elbe River, Journal of Hydraulic Research de Recherches Hydrauliques, volume 3, Issue 1, pp.21-29. 5. Franchini, M. and Lamberti, P., 1994, A flood routing Muskingum type simulation and forecasting model based on level data alone, Water Resources Research, volume 30, Issue 7, pp.2183-2196. 6. Helmio, T., 2005, Unsteady 1D flow model of a river with partly vegetated flood plains-application to Rhine River, Environmental Modelling& Software, volume 20, pp.361-375. 7. Hsu, M. H., Fu, J. C., and Liu, W. C., 2003, Flood routing with real-time stage correction method for flash flood forecasting in the Tanshui River,Taiwan, Journal of Hydrology, volume 283, pp.267-280. 8. Hsu, M. H., Fu, J. C., and Liu, W. C., 2006 ,Dynamic routing model with real-time roughness updating for flood forecasting, Journal of Hydraulic Engineering, volume 132, Issue 6, pp.605-619. 9. Hydrological Engineering Center, 2005, Hydrologic Modeling System HEC-HMS Users Manual, U.S. Army Crops of Engineers, California, USA. 10. Khatibi, R. H., Williams, J. J. R., and Wormleaton, P. R., 2000, Friction parameters for flows in nearly flat tidal channels, Journal of Hydraulic Engineering, volume 126, Issue 10, pp.741-749. 11. Maden, H. and Skotner, C., 2005, Adaptive state updating in real-time river flow forecasting-a combined filtering and error forecasting procedure, Journal of Hydrology, volume 308, pp302-pp312. 12. Sturm, T. W., 2001, Open channel hydraulics, McGraw-Hill series in water reasources and environmental engineering. 13. Wong, T. S. W., and Zhou, M. C., 2003, Kinematic wave parameters and time of travel in circular channel revisited, Advances in Water Resources, volume 26, pp.417-425. 14. 王如意、易任,1979,應用水文學上下冊,國立編譯館。 15. 王如意、游保杉、許銘熙、陳增壽,2004,即時洪水預報模式之研究與應用(I),行政院國家科學委員會專題研究計畫成果報告。 16. 王如意、游保杉、許銘熙、陳增壽,2005,即時洪水預報模式之研究與應用(II),行政院國家科學委員會專題研究計畫成果報告。 17. 江衍銘、張麗秋、張斐章,2002,回饋式類神經網路於二階段即時流量預測,臺灣水利,第五十卷,第二期,pp.15-21。 18. 吳建均,2005,河川洪水位演算模式之研究,國立台灣大學生物環境系統工程學研究所碩士論文。 19. 易任,1974,渠道水力學上下冊,東華書局。 20. 商家瑞,2003,河系ㄧ維變量流結合卡門濾波回饋演算模式,國立台灣大學土木工程研究所碩士論文。 21. 張斐章、張麗秋,2005,類神經網路,東華書局。 22. 張智星,2004,Matlab 程式設計,清蔚科技、鈦思科技。 23. 梁晉銘,2002,複合型類神經網路架構集水區水文模式之研究,國立台灣大學生物環境系統工程學研究所博士論文。 24. 許銘熙,1984,河川變量流非線性隱式法模式之穩定性,國立台灣大學土木工程學研究所博士論文。 25. 許銘熙,2003,台灣地區洪水災害及防治策略,工程環境特刊,第十 期,pp.3-19。 26. 許銘熙、傅金城,1999,參數及時修正河川洪水預報模式,臺灣水利,第四十七卷,第一期,pp.8-18。 27. 許銘熙、傅金城、林洙宏,2000,河川動力波洪水預報模式,中國土木水利工程學刊,第十二卷,第三期,pp.561-571。 28. 陳昶憲、陳建宏,1999,類神經模糊邏輯法應用於洪水位預報,中國土木水利學刊, 第十一卷,第二期,pp.317-326。 29. 陳昶憲、黃尹龍、吳青俊、蔡曜隆,2001,應用倒傳遞與反傳遞類神經網路模式於洪流量之預測,臺灣水利,第五十二卷,第三期,pp.65-77。 30. 陳昶憲、蔡國慶、黃尹龍,2001,模糊類神經網路應用於集水區出流量之預測,中國土木水利學刊,第十三卷,第二期,pp.395-403。 31. 陳莉、簡大為,2001,逕流量推估之研究, 臺灣水利,第四十九卷,第四期,pp.55-67。 32. 陳信中,2006,蘭陽溪洪水預報模式之研究,國立台灣大學生物環境系統工程學研究所碩士論文。 33. 傅金城,1997,淡水河洪水預報模式參數即時修正之研究,國立台灣大學農業工程學研究所碩士論文。 34. 傅金城,2003,即時回饋演算之河川洪水預報模式,國立台灣大學生物環境系統工程學研究所博士論文。 35. 黃尹龍,2000,類神經網路架構颱洪流量預測模式,私立逢甲大學土木及水利工程研究所碩士論文。 36. 葉怡成,1995,類神經網路-模式應用與實作,儒林圖書有限公司。 37. 葉怡成,1999,應用類神經網路,儒林圖書有限公司。 38. 蔡亞欣,2003,模糊範例學習推論系統於水位預測之研究,國立台灣大學生物環境系統工程學研究所碩士論文。 39. 蔡松家,2002,洪水預警系統及資料庫建置與管理之研究,國立成功大學水利及海洋工程研究所碩士論文。 40. 羅華強,2005,類神經網路-Matlab的應用,高立圖書有限公司。 | |
| dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/30446 | - |
| dc.description.abstract | 台灣屬於海島型氣候國家,夏秋兩季因颱風之侵襲造成許多重大災害。有效利用氣象及水文資訊以提高洪水預報的精確度做為減災及應變之用就顯得相當重要。傳統洪水預報系統(降雨-逕流-洪水預報)常受限於較複雜的降雨-逕流預報的估算方法。故為能簡單快速的獲得邊界條件,直接採用類神經網路預報上游邊界及河段內部水文站之水位,並利用水文監測資料即時修正洪水預報之初始值,配合洪水演算模式做為河川各斷面之洪水位預報。為驗證模式的效能,本文針對淡水河系,以近年來紀錄較完整之三場颱洪事件進行模式測試,並探討動力波模式與初始值修正、及類神經網路之洪水演算之間的差異,從中探討預報未來一至三小時水位變化較精確之方式。
由模擬結果顯示動力波模式受限於上下游邊界預報值、側入流及抽水站流量影響,而初始值修正之動力波演算,可有效改善預報第一、二小時之精度,但第三小時之改善程度較有限,在類神經網路之洪水演算中,其側入流及抽水站影響較小,受水位站預報精度影響較大,但預報未來一至三小時可獲得較精確之水位值。由本文所建立淡水河之河川洪水預報模式測試結果,確可在颱洪期間提供合理及準確的河川洪水資訊,以供應變決策之參考。 | zh_TW |
| dc.description.abstract | Taiwan located at the sub-tropic monsoon climate area. Typhoon occurrences often cause huge damages in summers and autumns. Flood forecasting model is a useful tool to capture precise meteorological and hydrological information for flood mitigations and responses emergency. Traditional flood forecasting model using the rainfall-runoff forecasting technique was limited to long time computation due to complicated approach. In order to obtain hydrological information in upriver rapidly, this study uses artificial neural networks (ANN) model to predict the stage of upriver in observed stations along a river. Moreover, for the sake of forecasting the stage of each section in the river, this study utilizes real-time observed stage to correct the initial stage with the incorporation of flood routing process for flood forecasting. Three typhoon events were simulated to confirm the accuracy of the forecasting model. The results are compared among dynamic routing, initial stage correction for forecasting, and integrated flood forecasting model with ANN, so as to obtain the suitable approach from three methods.
The results reveal that the accuracy of dynamic routing is seriously influenced by predicting stage in upriver, lateral inflow discharge, and pumping stations discharge. The initial stage of forecasting is able to well predict the stage for the lead time of two hours, but less performance after three hours. Moreover, the accuracy of predicting stage at stage stations has significant influence on integrated flood forecasting model with ANN, which the lateral inflow discharge and pumping stations discharge become less influence. By referencing the above forecasting information, better decisions can be made by the emergency operation agency during storm occurrences. | en |
| dc.description.provenance | Made available in DSpace on 2021-06-13T02:03:58Z (GMT). No. of bitstreams: 1 ntu-96-R94622002-1.pdf: 4040223 bytes, checksum: 6a1244c819af4661ed6b054b143f57a4 (MD5) Previous issue date: 2007 | en |
| dc.description.tableofcontents | 誌 謝 i
摘 要 ii Abstract iii 目 錄 iv 表目錄 vi 圖目錄 viii 第一章 緒 論 1 1.1 前言 1 1.2 研究方法 2 1.3 本文組織 3 第二章 相關研究概述 5 2.1 類神經網路模式之相關研究 5 2.2 河川變量流模式之相關研究 7 第三章 模式理論 11 3.1 類神經網路水位預報 11 3.1.1 倒傳遞類神經網路 11 3.1.2 資料正規化 11 3.2 河川洪水位預報模式 16 3.2.1 動力波演算模式 16 3.2.2 動力波演算模式之初始值修正 21 3.2.3 整合類神經網路水位預報之洪水演算模式 24 第四章 研究區域 25 4.1 研究區域簡介 25 4.2 地文資料 26 4.2.1 河道斷面 26 4.2.2 堤防高程 27 4.2.3 曼寧係數 27 4.2.4 水文測站 27 4.3 水文資料 28 4.3.1 上游邊界 28 4.3.2 河段內部水位站 28 4.3.3 下游河口潮位 28 第五章 結果與討論 29 5.1 水文站之水位預報 29 5.1.1上游邊界水位預報 29 5.1.2河段內部水位預報 31 5.2 河川洪水位預報模式 35 5.2.1 艾利颱風之預報模擬 36 5.2.2 海棠颱風之預報模擬 39 5.2.3 海馬颱風之預報模擬 41 第六章 結論與建議 45 6.1 結論 45 6.2 建議 47 參考文獻 48 | |
| dc.language.iso | zh-TW | |
| dc.subject | 類神經網路 | zh_TW |
| dc.subject | 動力波 | zh_TW |
| dc.subject | 洪水位預報 | zh_TW |
| dc.subject | 整合類神經網路水位預報 | zh_TW |
| dc.subject | 初始值修正 | zh_TW |
| dc.subject | flood forecasting | en |
| dc.subject | Dynamic routing model | en |
| dc.subject | Artificial Neural Network | en |
| dc.subject | integrated flood forecasting model with ANN | en |
| dc.subject | initial stage of forecasting | en |
| dc.title | 類神經網路在洪水演算及預報之應用 | zh_TW |
| dc.title | Application of Artificial Neural Networks on Flood Routing and Forecasting | en |
| dc.type | Thesis | |
| dc.date.schoolyear | 95-2 | |
| dc.description.degree | 碩士 | |
| dc.contributor.oralexamcommittee | 王如意,游保杉,葉克家 | |
| dc.subject.keyword | 動力波,初始值修正,整合類神經網路水位預報,洪水位預報,類神經網路, | zh_TW |
| dc.subject.keyword | Dynamic routing model,initial stage of forecasting,integrated flood forecasting model with ANN,Artificial Neural Network,flood forecasting, | en |
| dc.relation.page | 125 | |
| dc.rights.note | 有償授權 | |
| dc.date.accepted | 2007-07-04 | |
| dc.contributor.author-college | 生物資源暨農學院 | zh_TW |
| dc.contributor.author-dept | 生物環境系統工程學研究所 | zh_TW |
| 顯示於系所單位: | 生物環境系統工程學系 | |
文件中的檔案:
| 檔案 | 大小 | 格式 | |
|---|---|---|---|
| ntu-96-1.pdf 未授權公開取用 | 3.95 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。
