請用此 Handle URI 來引用此文件: http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/30146
完整後設資料紀錄
DC 欄位值語言
dc.contributor.advisor荷世平(Shih Ping Ho)
dc.contributor.authorYi-Ling Chouen
dc.contributor.author周易陵zh_TW
dc.date.accessioned2021-06-13T01:39:21Z-
dc.date.available2007-07-26
dc.date.copyright2007-07-26
dc.date.issued2007
dc.date.submitted2007-07-13
dc.identifier.citation1.行政院公共工程委員會,「政府採購法令彙編」,2006
2.行政院公共工程委員會,「公共建設工程經費估算編列手冊」,2001
3.行政院公共工程委員會,「公共工程專業營建管理服務費用編列辦法之研究」,1996
4.行政院公共工程委員會,「公共工程專業營建管理服務費用編列第二期研究」,1997
5.行政院公共工程委員會,「機關委託工程技術服務費率調整之研究」,2005
6.黃依婷、李建中,「機關委託工程技術服務費率調整之研究」,國立中央大學營建管理研究所碩士論文,2006
7.李岱原、王明德,「公共工程採行專業營建管理制度經濟性分析與運作模式之研究」,國立台灣大學土木工程學系碩士論文,1996
8.林益源、王明德,「公共工程技術顧問評選決標方式之研究」,國立台灣大學土木工程學系碩士論文,1997
9.黃賢炳、楊智斌,「公共工程專案管理服務費用編列問題之分析」,中華大學營建管理研究所碩士論文,2005
10.楊智斌、黃賢炳,「專案管理廠商服務成本調查分析」,營建管理,第65期,第1~5頁,2005
11.蕭建和、鄭紹材、高士偉,「鐵路立體化工程施工風險因子探討」,工程,第78期,第128~137頁,2005
12.姚乃嘉、王國平,「公共工程專案管理廠商責任之探討-以建築工程為例」,營建管理,第53期,第16~26頁,2002
13.郭斯傑,「工程風險與保險機制」,中國土木水利工程學會,公共建設風險管理研討會講義,2005
14.黃文吉、林茂成,「國內大型公共建設之特質與現況(下)」,現代營建,第300期,第68~78頁,2004
15.交通部鐵路改建工程局、交通部高速鐵路工程局、高雄捷運股份有限公司,專案管理計畫相關合約
16.交通部,「交通政策白皮書:運輸」,2002
17.呂欽文,「公共工程品質的十大殺手」,營建知訊,第284期,第38~42頁,2006
18.交通部台北市區地下鐵路工程處,台北市區鐵路地下化東延南港工程–南港紀要 V.1–第一輯(80.7∼86.6),1999
19.A Guide to the Project Management Body of Knowledge (PMBOK Guide) Third Edition,2004 Project Management Institute
20.中華民國統計資訊網,http://61.60.106.82/pxweb/Dialog/statfile9L.asp
21.交通部鐵路改建工程局網站,http://www.rbtr.gov.tw/index1.asp
dc.identifier.urihttp://tdr.lib.ntu.edu.tw/jspui/handle/123456789/30146-
dc.description.abstract自民國88年「機關委託技術服務廠商評選及計費辦法」發布實施以來,當中規定了四種服務費用計算方式:(1)服務成本加公費法;(2)建造百分比法;(3)按月、按日或按時計酬法;(4)總包價法或單價分析法,但大部分之主辦機關不就工程性質、服務內容及工程複雜度與否,為容易編列預算,大多採用建造百分比法為計算基準,此舉已有失該辦法當初訂定四種計費方式的原意,再加上專案管理技術服務費率已近十年未做過任何的調整,隨著國內經濟環境的變化,各專案營建管理(PCM)廠商在此種環境之下,公司的營運已日趨窘困;且主辦機關對PCM廠商要求的服務品質及內容卻是不斷的增加,故為符合公平原則,確保工程品質,並保障廠商之權利,現行規定中之工程專案管理技術服務之建造百分比費率有其調整之必要性及急迫性。
本研究以鐵路地下化工程為探討對象,該類工程為土木工程中最困難工程之一,因為它有著必須在現有鐵路營運狀況下進行相關工程之特性,但技術服務費率卻是與一般土木工程相當,對PCM廠商而言,實屬不合理,故本研究根據以往之研究提出建議之專案管理人月計算式,加入工程種類校正係數之修正因子,並以國內的鐵路地下化工程為案例進行實際計算,及以歷年之服務費率調整研究案加以驗證該式之合理性,結果顯示該計算式對於鐵路地下化工程而言,當其工程種類校正係數為1.79時,所計算出之結果與歷年之研究案所建議之調整費率值接近,故屬一合理之計算式,但卻高於目前技服辦法規定之費率,足見現行費率有往上修正之空間。
zh_TW
dc.description.abstractSince 「Regulations for Selection and Fee Calculation of Technical Services Providers Entrusted by Entities」Promulgated by Public Construction Commission Executive Yuan in 1999. The calculation of service fees shall be selected among the following methods:(1)Cost plus fee, (2) A percentage to construction expense, (3) Monthly, daily or hourly payment, (4) Consolidated pricing or unit pricing methods. But the entity applies the method of a percentage to construction expense for work usually for easy budget. It had violated the original intension of the regulation. And the technical services fees for professional construction management were not adjusted for 10 years nearly. Along with economic environment change and the increase of services quality and contents requested by the entity, the business of professional construction management (PCM) firms was in distress day by day. Therefore, for conforms to the fair principle, ensure the quality of work and right of the safeguard PCM firms, the current regulation of percentage of the technical services fees to construction expense for professional construction management current regulation has to adjust necessarily and urgently.
The thesis takes the railway underground project as the example to discuss the reasonable technical services fees to construction expense for professional construction management. The railway underground project is one of the most difficult civil works. It has a unique characteristic- Must in not affect the existing railway transportation under each railway reconstruction project. The degree of difficulty is very high, but the technical services fees are the same as other civil construction. It is not fair to PCM firm. Therefore for enable the entities understand clearly the PCM firms carry out this type project to need the cost reasonably, the thesis suggests a calculation of professional construction management of technical services and takes two railway underground projects as examples. When the project type correction factor is 1.79, the result is close to other researches over the years, and higher than the regulations. It proves that the suggestive calculation is reasonable and the regulations have the revised range.
en
dc.description.provenanceMade available in DSpace on 2021-06-13T01:39:21Z (GMT). No. of bitstreams: 1
ntu-96-P93521707-1.pdf: 1171176 bytes, checksum: 1659248f2962f397527b0d106519a450 (MD5)
Previous issue date: 2007
en
dc.description.tableofcontents誌謝 i
摘要 ii
Abstract iii
第一章 緒論 1
1.1 研究動機 1
1.2 研究目的與限制 2
1.3 研究方法 2
1.4 研究流程 2
第二章 文獻回顧 4
2.1 國內相關文獻 4
2.2 國外相關文獻 17
第三章 機關委託專案管理技術服務現況探討 21
3.1 現行規定之服務項目及費率 21
3.2 近十年國內經濟變化 25
3.3 品質與價格之關係 31
3.3.1 效用函數 31
3.3.2 工程生命週期 33
3.3.3 公共工程品質 34
3.4 鐵路地下化工程之特性 35
第四章 廠商執行專案管理成本案例之分析 42
4.1 服務人月數之計算方式 42
4.2 A計畫之合理服務費用 52
4.2.1 A計畫之合約規定 52
4.2.2 A計畫所需之合理服務人月數 56
4.2.3 A計畫所需之合理服務費 63
4.3 A計畫與現行法規及各研究計畫之比較 64
4.4 B計畫之合理服務費用 67
4.4.1 B計畫之合約規定 67
4.4.2 B計畫所需之合理服務人月數 69
4.4.2 B計畫所需之合理服務費 71
4.5 B計畫與現行法規及各研究計畫之比較 71
第五章 結論與建議 73
5.1 結論 73
5.2 建議 73
參考文獻 75
附錄A 非建築物工程技術服務建造費用百分比表 A-1
附錄B 工程專案管理技術服務(不含施工監造)建造費用百分比上限表 B-1
附錄C 工程專案管理技術服務(含非建築物施工監造)建造費用百分比上限表 C-1
dc.language.isozh-TW
dc.subject人月zh_TW
dc.subject專案管理zh_TW
dc.subject鐵路地下化zh_TW
dc.subject建造百分比zh_TW
dc.subjectrailway undergrounden
dc.subjectfee rateen
dc.subjectPCMen
dc.title機關委託專案管理技術服務費之研究-以鐵路地下化工程為例zh_TW
dc.titleA study for Selection and Fee Calculation of Technical Services Providers Entrusted by Entities- Take the Railway Underground Project as the Exampleen
dc.typeThesis
dc.date.schoolyear95-2
dc.description.degree碩士
dc.contributor.oralexamcommittee李建中,陳介豪
dc.subject.keyword專案管理,鐵路地下化,人月,建造百分比,zh_TW
dc.subject.keywordPCM,railway underground,fee rate,en
dc.relation.page90
dc.rights.note有償授權
dc.date.accepted2007-07-13
dc.contributor.author-college工學院zh_TW
dc.contributor.author-dept土木工程學研究所zh_TW
顯示於系所單位:土木工程學系

文件中的檔案:
檔案 大小格式 
ntu-96-1.pdf
  未授權公開取用
1.14 MBAdobe PDF
顯示文件簡單紀錄


系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。

社群連結
聯絡資訊
10617臺北市大安區羅斯福路四段1號
No.1 Sec.4, Roosevelt Rd., Taipei, Taiwan, R.O.C. 106
Tel: (02)33662353
Email: ntuetds@ntu.edu.tw
意見箱
相關連結
館藏目錄
國內圖書館整合查詢 MetaCat
臺大學術典藏 NTU Scholars
臺大圖書館數位典藏館
本站聲明
© NTU Library All Rights Reserved