請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/29526
完整後設資料紀錄
DC 欄位 | 值 | 語言 |
---|---|---|
dc.contributor.advisor | 曾惠斌 | |
dc.contributor.author | Tsung-ming Wu | en |
dc.contributor.author | 吳聰敏 | zh_TW |
dc.date.accessioned | 2021-06-13T01:09:26Z | - |
dc.date.available | 2007-07-24 | |
dc.date.copyright | 2007-07-24 | |
dc.date.issued | 2007 | |
dc.date.submitted | 2007-07-19 | |
dc.identifier.citation | 一. 英文部分:
1. Abba, W. F., Earned Value Management-Reconciling Government and Commercial Practices. PM. Manager, January-February 1997, p.58~63. 2. Abba, W., How Earned Value Got to Prime Time: A Short Look Back and Glance Ahead, EVMS Track Presentations from PMI connections, 2000, Houston. 3. “Abba, W., Keynote Address, the 15th Annual International college of Performance Management Conference, St. Paul, Minnesota, May, 1999. 4. Alexander, S., Earned Value Management Systems (EVMS): Basic Concepts, Project Management Institute, 1998, Washington, DC Chapter. 5. Australian Cost Schedule Control Systems Criteria-Implementation Guide, Australian Defence Standard DEF(AUST5657, March, 1994. 6. Australian Cost/Schedule Control Systems Criteria, Australian Defence Standard DEF(AUST)5655, October, 1992. 7. AVM Brian J. Graf, The Development of C/SCSC, Using Performance Measures as an Agent of Change in Mining Conference, 1997, Sydney. 8. Avraham Shtub, Jonathan F. Bard, Shlomo Globerson, “Project Management Processes, Methodologies and Economic” ,Pearson Education.Inc.2005,2e. 9. Blackmore, M. EVM-The UKMoD Perspective, Management of Projects Seminar, Stockholm, June8-9, 1998, Sweden. 10. Christensen, D. S., The Costs and Benefits of the Earned Value Management Process, Acquisition Review Quarterly, Fall 1998, p373~386. 11. Cited in William G. Wells,Jr.,“ From the Editor ”Project management Journal, December 1998, vol. 29, no.4 p4~6. 12. Cleland, D. I. and king, W. R.. Systems Analysis and Project Management, McGraw-Hill, 3rd ed, 1983, New York. 13. Drucker, P. Management Tasks, Responsibilities Practices Harper & Row, 1973, New York. 14. David I. Cleland & Lewis R. Ireland.. Project management: Strategic design and implementation, 2004. 15. David S. Christensen,“ Using the Earned Value Cost Management Report to Evaluate the Constructor,s Estimate at Completion”, Acquisition Review Quarterly, summer, 1999. 16. David S.Christensen,“The Costs and Benefits of the Earned Value Management Process”, Acquisition Review Quarterly, fall,1998. 17. Earned Value Management Systems maturity Model (EVMS-MM), Version1.5, Defense contract Management Agency, April, 2000. 18. Erik W. Larsom and David H. Gobeli, “Significance of Project Management Structure on Development Success” IEEE Transactions on Engineering Management, vol.36on 2, May 1989, p.119~125. 19. Earned Value Management, Acquisition Management System. Version 3.3, Ministry of Defence, October 2000, United Kingdom. 20. EVMS Guidebook, Defense Contract Management Command, August, 2000. 21. Fleming, Q.W., and Koppelman, J. M., Earned Value Project Management: A Powerful Tool for Software Projects, CROSSTALK, The Journal of Defense Software Engineering, Vol. 10. NOo7, July 1998, p19~23. 22. Farid F.and Karshenas.,“C/SCS Criteria for Measuring Progress under Inflation” ,Project Management Institute Seminar/Symposium, Montreal,Canada, September 1986. 23. Gansler, J. S., Industry Standard “Earned Value Management Standard”, Policy Memorandum, Undersecretary of Defense (Acquisition and Technology), August 17, 1999. 24. Garold D. Oberlender., “Project Management for Engineering and Construction”,2e,2000. 25. Harold kerzner. “Project management: A systems approach to planning, scheduling, and con- trolling”, 8th ed., 2003. 26. Haupt, E., “Basic Earned Value Management for Program Managers”, 2002. 27. Henry Fayol, General and Industrial Management. London Pitman, 1949, p6. 28. Herbert Strauss , David McClure , Rick White Ⅲ. “What Every Government IT Professional Should Know About Earned Value Management”, Gartner, January 2006. 29. James P. Lewis., “Project Planning, Scheduling ﹠control”, McGraw-Hill International editions ,New York 3 e, 2003. 30. Kathy Schwable, “Information Technology Project Management”, 2004. 31. Kerzner, H.. Project Management: A Systems Approach to Planning, Scheduling and Controlling, 8th ed. John Wiley & Sons, Inc, 2001. 32.Mandatory Procedures for Major Defense Acquisition Programs (MDAPs) and Major Automated Information System(MAIS) Acquisition Programs, DoD Regulation 5000. 2-R(change 2), October 6, 1997, Appendix VI. 33.Mandatory Procedures for Major Defense Acquisition Programs (MDAPs) and Major Automated. Information System(MAIS) Acquisition Programs, DoD Interim Regulation 5000.2, January 4, 2001, Appendix D. 34.Meredith, J. R. and Mantel, S. I.. Project Management, John Wiley & Sons, Inc., 1989, New York. 35.Nicholas John M.. “Managing Business and Engineering Projects Concept and Implementation” N.J.,Prentice-Hall,1990. 36.Sean Alexander, “Earned Value Management System Basic Concept” ,Meridan Consulting Group, Inc./ March 1998. 37. Project Management Institute Standards Committee. “A Guide to the Project Management Body of Knowledge ”,3rd Edition, 2004. 38.Paraphrased from “Industry Standard Guidelines for Earned Value Management Systems.” National Security Industrial Association Subcommittee, EVMS Work Team, August 8, 1996. 39.Paraphrased from “Industry Standard Guidelines for Earned Value Management Systems,” National Security Industrial Association Subcommittee, EVMS Work Team, August 8, 1996. 40.Paraphrased from David S. Christensen, Ph.D, “The Costs and Benefits of the Earned Value Management Process” Acquisition Review Quarterly, Fall 1998, p.373-385 41.Project Performance Management, Candian General Standard Board CGSB-187.2-99, 1999. 42.Ralph Currier Davis, The Foundations of Top Management ,New York, Harper, 1951, p269. 43.Rory Burke,” Project Management-Planning and Control Techniques(3rd),” John Wiely & Sons, Ltd, 1999. 44.Rakos, J.J.. Software Project Management for Small to Medium Sized Projects, Prentice Hall, Englewood Cliffs, NJ, 1990. 45.Reeser, C.. Management: Function and Modern Concepts, Foreman and Company, Scott, 1973. 46.Robert K. Wysocki & Rudd McGary. “Effective Project Management, 3e”, 2005. 47.Sieli, E. M.. Managing a Project as a Process, AT&T Technical Journal, Mar./Apr., 1991, p.33~39. 48.Smith, B.. Project concepts, in Effective Project Administration, Institution of Mechanical Engineers, 1985. 49.The Cost/Schedule Performance Management Standard (C/SPMS), Canadian General Standard Board CGSB-187.1-93, 1993. 50.Top 10 Benefits of EVM, The Air Force Acquisition Reform Newsletter, Vol.3, No.1, January/February 2000. 51.Wysocki, Robert K., Robert Beck, Jr., and David B. Crane. Effective Project Management: How to Plan, Manage, and Deliver Projects on Time and within Budget, New York. John Wiley & Sons, 1995, p.38. 52.Wysocki, Robert K., Robert Beck, Jr., and David B. Crane. Effective Project Management: How to Plan, Manage, and Deliver Projects on Time and within Budget, New York, John Wiley & Sons, 1995, p.38. 53.William H. Newman, E. Kirby Warren, and Adrew R. McGill. The Process of Management: Strategy, Action, Results, 6th ed. Englewood Cliffs, NJ: Prentice Hall 1987, p.140 Reprinted by permission. 54.Yin,R.K. Case Study Research Design and Methods, SAGE Publications, Inc, 1985. 二. 中文部分: 55.王雪明,中科院推行實獲值管理系統 ( EVMS ) 研究報告,2002。 56.王慶富,「專案管理」,台北聯經,1996,P.1~18,192~205。 57.王裴生,「實獲值在專案管理上運用之設計─以某國營事業為例」,國防大學後勤管理研究所碩士論文,2003。 58.王名玉,「公共建設計畫績效預測與評估」,台灣科技大學營建工程學系碩士論文,2003。 59.毛格明,「多專案實獲值績效分析機制之建立」,逢甲大學工業工程學原碩士論文,2004。 60.江俊謀,「公共工程執行績效評估制度與考評指標之研究」,國立台灣工業技術學院營建工程研究所碩士論文,1997。 61.于至忠,「實獲值 ( Earned Value )於工程管理上的應用」,國立中央大學館理學院碩士論文,2003。 62.何沿昌,「整合性成本管理系統的初步研究」,國立台灣工業技術學院工程技術研究所碩士論文,1992。 63.何沿昌,「整合成本管理系統的初步研究」,國立台灣工業技術學院營建工程技術研究所碩士論文,1993。 64.沈明思,「實獲值管理 ( EVM ) 在大型研發組織導入之研究─以中科院試行規劃為例」,國防大學後勤管理研究碩士論文,2004。 65.林佑澤,「專案形成與執行階段績效之預測與影響因素評估」,國立台灣科技大學營建工程系碩士論文,2004。 66.林蒼裕,「實獲值管理在工程專案管理之應用─以A機電工程公司工程專案為例」,國立中央大學館理學院碩士論文,2006,06。 67.林金波,「風險管理應用在專案成本管理之研究」國立台灣科技大學營建工程系碩士論文,2003。 68.林耀煌,「營建工程施工規劃與管理控制」,長松出版社,2001,第七版。 69.周祥東,「實獲值管理:基礎篇」中華專案管理學會電子管理學會電子報專案管理專欄,第37期,2003。 70.侯佩君,「專案工程設計層面導入EVMS之研究」國立台灣科技大學營建工程系碩士論文,2001。 71.許光華、何文榮,「專案管理─理論與實務」,台北華泰書局,1998。 72.許成績,「現代專案管理教材」,博碩文化(股)公司,2005,初版二刷。 73.許光華,「專案管理知識體系的觀點」,華泰文化事業(股),2006。 74.許光華、龔旭元、沈肇基“專案管理”,2003。 75.許士輝,「走向創新時代的組織績效評估,哈佛商業評論:績效評估」,天下遠見出版(股)公司,2000。 76.黃介成,「時程管理體系整合做法」,國立成功大學土木研究所碩士論文,2000。 77.張金輝,「承包商執行專案工程績效評估之研究」國立台灣工業技術學院營建工程研究所碩士論文,2002。 78.張行道等,「建置公共工程施工績效評估機制」,行政院公共工程委員會,研究報告174,2002。 79.粘倬南,「營建業經營績效評估之研究」,國立台灣工業技術學院營建工程技術研究所碩士論文,1993。 80.陳禱安,「專案成本及進度執行績效預測與影響因素評估」國立台灣科技大學營建工程系碩士論文,2004。 81.陳進樹,「專案績效管理模式建構之研究」,國立台灣科技大學營建工程系碩士論文,2005。 82.熊培霖、范淼、黃哲明、周詳東、陸正平,「專案管理基礎知識與應用實務─專案管理入門寶典」,博鴻國際專案管理顧問(股)公司,2006。 83.魯平,「提升公共工程執行績效之研究」,台灣工業技術學院營建工程學系研究所碩士論文,1998。 84.劉福勳,「營建管理概論」,漢天下工程管理顧問有限公司,2001,第七版。 85.鍾智安,「專案要經特性對實獲值管理影響之研究」,國防大學後勤管理研究所碩士論文,2004。 86.韓國詳,「完成實質管理系統 (EVMS ) 在專案管理應用之研究─以高雄捷運某服務合約為例」,2006。 87.戴久永,「專案管理的特色」,標竿學院,2002。 三. 網站部分: 88. http://evm.nasa.gov/definitionla.html(2006) 89. http://www.acq.osd.mil/pm/(2006) 90. http://www.pmi.org(2006) 91. http://www.earnedvalue.com/(2006) 92. http://www.evms.doe.gov/(2006) 93. http://www.acg.osd.mil/pm/historical/timeline/ev%20.timeline.htm(2006) 94. http://www.dau.mil/pubs/pm/pmpdf02/fle-ma2.pdf(2006) 95. www.cnsqa.com/spw2006/jsp/html/spw/download/SPWPROSIM2006PPT/2A/EV.pdf(2006) 96. www.cio.noaa.gov/itmanagement/evaslides.ppt(2006) 97. http://www.google.com.tw/search?q=earned+value&complete=1&hl=zh-TW&start=40&sa=N(2006) 98. www.usaid.gov/our_work/economic_growth_and_trade/info_technology/tech_series/EVM_508.pdf(2006) 99. www.kcpmichapter.org/speakerpresentations/lomax.ppt(2006) 100. www.ewh.ieee.org/r10/kerala/paper/EVMS.ppt (2006) 101. www.pittsburghpmi.org/documents/meetings/presentations/Earned_Value_Management.pdf(2007) 102. www.ece.vt.edu/swe/lwa/memo/lwa0066.pdf(2007) 103. http://www.psig.com.tw/intelligence/article11.htm(2007) 104. http://www.npma.org.tw/newsletter/article/EVMS_1.pdf(2007) 105. http://eca2.mis.au.edu.tw/check/paper/IE1/IE1_4.doc(2007) | |
dc.identifier.uri | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/29526 | - |
dc.description.abstract | 實獲值管理 ( Earned Value Management;EVM ) 是一種整合時程與成本兩構面的專案績效評量系統 ( Performance measurement system ) ,它以能滿足專案需求的工作包 ( work packages ) 來代表性能績效的達成,因此,它是一種整合時程�成本�性能的整合式專案績效評量的工具。它在美國、澳大利亞、加拿大、瑞典、英國、日本等國家已被成熟的運用和公認為專案管理的最佳實務 ( best practice )。EVM提供專案計畫完成的部份即計畫值 ( Planned Value;PV )、實際已完成的部份即實獲值 ( Earned Value;EV ) 與已完成部份所投入的成本即實際成本 (Actual Cost;AC ) 等三個讓專案經理了解專案現況的測量值,並且提供整合式的績效評量指標,以便在專案進行期間而非之後,作為有效的績效管控的回饋工作。
本研究應用EVM、專案管理五大過程組之管理循環模式和引用工程專案成本管理之管理語言,建構營建工程專案成本管控架構模式,並探討營建工程專案績效評量基準模式與EVM的完工預測技術效能。同時利用個案分析深入探討EVM落實在營建工程專案管控上的可行性和其價值意義,且透過「EVM」和「統計製程管制圖」的結合,建立視覺化的績效評量基準與衡量指標管制上、下限度,以利有效掌握專案整體功能,實現「更快 ( Faster )、更好 ( Better )、更便宜 ( Cheaper )」的營建目標。 最後以個案分析的方式來驗證,獲致的結果為:營建工程專案的成敗,主宰於訂立有效益的績效評量基準和有效率的績效執行控管;EVM整合時程�成本�性能的專案績效指標,在可靠性與正確性上是最具科學的好方法;EVM藉由透明化和正確的專案績效訊息,確實具有早期預警與預測的效能;訂立營建工程專案績效指標的統計管制圖,作為專案績效具體量化的控管,有利於提昇營建專案執行效率。 | zh_TW |
dc.description.abstract | Earned Value management ( EVM ) is a kind of performance measurement system which integrates time and cost. It expresses the achieved of capable achievement by the satisfied work package which is accomplished. Therefore it is an instrument for integrating time, cost and behavior. In America, Australia, Canada, Sweden, England, and Japan, it was used maturely and regards as the best practice of project management. EVM provides three measurement values: planned value, actual value and actual cost of project. These measurement values can help project manager to realize the present condition and provide a conformable measurement value. It can make effective control during the project afoot.
This study used EVM, five processes of project construction management, adduced and established cost controlling of project construction management. To make a assessment for benchmark of project’s results and estimate the art of accomplishable efficiency. By using case study to treat the feasibility and meaning of practicing EVM to control project construction management. Per the combination of EVM and statistical control graphs, we can erect achievements audit and evaluate the index’s upper and lower limit. By this way, we can control whole project, to realize the targets: Faster, Better, and Cheaper. Eventually, adopted case study to test above-mentioned, the results are as follow. First, make effective standards performance evaluation and execute efficiency predominate project construction management is successful or fail. Second, combined the index of time, cost, and performance, EVM is the best method. Third, EVM provided crystalline and correct information of project, can predict the effectiveness. Fourth, makes statistics control diagram of project performance for controlling the project, is good for promoting effectiveness of executing project. | en |
dc.description.provenance | Made available in DSpace on 2021-06-13T01:09:26Z (GMT). No. of bitstreams: 1 ntu-96-P93521708-1.pdf: 2829432 bytes, checksum: 98bc878f8741854b61cfab4103a1fd0c (MD5) Previous issue date: 2007 | en |
dc.description.tableofcontents | 論文口試審定書 ………………………………………………………I
誌謝 ……………………………………………………………………II 摘要 ……………………………………………………………………III Abstract ………………………………………………………………IV 目錄 ……………………………………………………………………V 圖目錄 …………………………………………………………………XI 表目錄 ………………………………………………………………XIV 參考文獻 …………………………………………………………文獻-1 附錄 ………………………………………………………………附錄-1 目錄 第一章 緒論 1.1 研究背景 ………………………………………………………1-1 1.2 研究動機 ………………………………………………………1-2 1.3 研究目的………………………………………………………1-3 1.4 研究方法 ………………………………………………………1-5 1.5 研究對象與範圍 ………………………………………………1-6 1.6 研究限制 ………………………………………………………1-7 1.7 研究流程 ………………………………………………………1-8 第二章 文獻回顧 2.1 專案與專案管理 ………………………………………………2-1 2.1.1 專案管理起源 ………………………………………………………2-1 2.1.2 專案的定義 …………………………………………………………2-1 2.1.3 專案的特性 …………………………………………………………2-3 2.1.4 專案管理的定義……………………………………………………2-4 2.1.5 成功的專案管理 ……………………………………………………2-4 2.2專案管理的組織 ………………………………………………2-6 2.2.1 專案組織 ……………………………………………………………2-6 2.2.2 有效率的矩陣組織之特性 …………………………………………2-7 2.2.3 組織結構對專案的影響 …………………………………………...2-8 2.3專案管理過程組 …………………………………………........2-8 2.3.1 專案管理過程 …………………………………….………………...2-8 2.3.2 起始過程組 ………………………………………………………....2-9 2.3.3 規劃過程組 ………………………………………………………..2-10 2.3.4 執行過程組 ……………………………………………………….2-12 2.3.5 控管過程組 ………………………………………………………2-12 2.3.6 結束過程組 ………………………………………………………2-14 2.3.7 過程間的相互聯繫與交互作用 ………………………………......2-14 2.4 專案成本管理 ………………………………………………...2-15 2.4.1 專案成本管理的定義 ……………………………………………..2-15 2.4.2 專案成本管理 ……………………………………………………..2-16 2.4.3 成本估算 …………………………………………………………..2-17 2.4.4 成本預算 …………………………………………………………..2-17 2.4.5 成本控制 …………………………………………………………..2-18 2.5 專案管理技術發展與應用領域 ……………………………..2-18 2.5.1 計畫評核術 ………………………………………………….........2-19 2.5.2 要徑法 ……………………………………………………………..2-20 2.5.3 甘特圖.…….....……………………………………………………2-21 2.5.4 工程進度的計算方法 ……………………………………………..2-21 2.6 實獲值管理 …………………………………………………..2-23 2.6.1 實獲值管理的發展 ………………………………………………..2-23 2.6.2 實獲值管理的研究和應用方向 …………………………………..2-25 2.6.3 實獲值管理的名詞 ………………………………………………..2-28 2.6.4預測技術 …………………………………………………………...2-30 2.6.5實獲值管理的優點與特徵………………………………………...2-31 2.6.6 世界各國實獲值管理應用概況 …..……………………………...2-33 2.7 小結 …………………………………………………………..2-35 第三章 研究方法之探討與應用 3.1基本構想與研究設計………………………………………….3-1 3.1.1基本構想 …………………………………………………………….3-1 3.1.2研究設計 …………………………………………………………….3-2 3.2實獲值管理 …………………………………………………….3-3 3.2.1實獲值名詞定義…………………………………………………….3-3 3.2.2實獲值參數的判讀………………………………………………….3-4 3.2.3整合時程/成本/性能的績效評量指標………………………..…….3-6 3.2.4完工預測 ……………………………………………………..…….3-10 3.2.5完工預測實獲值管理圖 …………………………………………...3-11 3.3專案績效評量管理………………..…………………………...3-12 3.3.1專案績效控制之PDCA循環 ..……………………………………3-12 3.3.2專案績效評量主要功能 …………………………………………...3-13 3.3.3專案基準評量……………………………………………….……..3-14 3.3.4偏差管理 …………………………………………………….……..3-14 3.4建立工程PV、EV基準和管制範圍 ………...………………3-15 3.4.1建立D/S工程PV基準與EV績效基準 …………………………3-16 3.4.2建立D/S工程PV基準管制範圍 ………………………………...3-19 3.4.3建立D/S工程EV績效管制範圍 ………………………………...3-20 3.4.4建立行政辦公工程PV基準與EV績效基準管制範圍………….3-21 3.4.5建立行政辦公工程PV基準管制範圍 …...………………………3-24 3.4.6建立行政辦公工程EV績效基準管制範圍 ……………………...3-25 3.4.7PV/EV統計標準差 ………………………………………………...3-26 3.5建立績效指標管制範圍 ……………………………………..3-29 3.5.1SPI績效管制範圍 ………………………………………………….3-29 3.5.2CPI績效管制範圍 …………………………………………………3-30 3.5.3CR績效管制範圍 ………………………………………………….3-32 3.6小結 ………………………………….………………………..3-33 第四章 營建工程專案成本管控架構模式之研究 4.1 建構實獲值管理系統架構模式………………………………4-1 4.1.1實獲值管理系統規劃的順序…………………….…………………4-1 4.1.2 建立營建工程專案成本管控架構模式…..……………..…………4-2 4.2 起始過程組 ……………………………………………………4-5 4.2.1 定義營建工程專案範疇 ……………………………………………4-5 4.2.2界定營建工程專案成本範圍 ……………………………………….4-6 4.3 規劃過程組 ……………………………………………………4-8 4.3.1建立工作分解結構 ………………………………………………….4-8 4.3.2 建立組織分解結構 ………………………………………………..4-14 4.3.3 建立責任指派矩陣 ………………………………………………..4-16 4.3.4 細分、排程工作及分派資源 ……………………………………..4-18 4.3.5 撰寫工作分解結構字典 …………………………………………..4-18 4.3.6計算合約成本 ……………………………………………………...4-19 4.4 執行過程組 …………………………………………………...4-20 4.4.1 建立績效評量基準 ………………………………………………..4-21 4.4.2 計算實獲值及實際成本 …………………………………………..4-22 4.4.3 計算變異及績效指標 ……………………………………………..4-24 4.4.4 執行過程組之過程模式 …………………………………………..4-25 4.5 控管過程組 …………………………………………………...4-25 4.5.1 繪製實獲值績效圖 ………………………………………………..4-26 4.5.2 績效評估…………………………………………………………..4-26 4.5.3 完工預測 …………………………………………………………..4-27 4.5.4 撰寫實獲值管理報告 ..……………………………………………4-28 4.5.5 變更績效評量標準 ………………………………………………..4-28 4.5.6 控管過程組之過程模式 …………………………………………..4-29 4.5.7 專案控管週期實獲值管理績效表 ………………………………..4-29 4.6 結束過程組 …….……………………………………………..4-29 4.6.1 營建工程專案結束 ………………………………………………..4-30 4.6.2 結束過程組之過程模式 …………………………………………..4-31 4.7 小結 ………………………………….………………………..4-31 第五章 個案實例探討與實證分析 5.1D/S工程失敗個案分析 ………………………………………..5-2 5.1.1案例A計畫值(PV)基準分析 ………………………………………5-2 5.1.2案例A實獲值(EV)績效分析 ………………………………………5-5 5.1.3案例A進度績效指標(SPI)績效分析 ……………………………...5-7 5.2行政辦公工程失敗個案分析 ……………………………….5-10 5.2.1案例B計畫值(PV)基準分析 ……………………………………..5-12 5.2.2案例B實獲值(EV)績效分析 ……………………………………..5-13 5.2.3案例B進度績效指標(SPI)績效分析 …………………………….5-14 5.3成功個案分析 ………………………………………………...5-17 5.3.1案例C個案摘要 …………………………………………………..5-17 5.3.2案例C實獲值分析 ………………………………………………..5-20 5.3.3案例C績效分析 …………………………………………………..5-23 5.3.4案例C實獲值管理15%法則完工預測驗証 ……………………..5-30 5.4案例D導入EVMS個案分析 ……………………………….5-31 5.4.1案例D起始過程組 ………………………………………………..5-31 5.4.2案例D規劃過程組 ………………………………………………..5-32 5.4.3案例D執行過程組 ………………………………………………..5-35 5.4.4案例D控管過程組 ………………………………………………..5-38 5.4.5案例D完工預測…… ……………………………………………..5-48 5.5 營建工程專案成本超支原因與因應策略…………………..5-51 5.5.1 營建工程專案成本超支原因分析………………………………5-51 5.2.2 專案成本超支因應策略………………………………………...5-52 5.6小结 …………………………………………………………..5-55 第六章 結論與建議 6.1結論 …………………………………………………………….6-1 6.2建議 …………………………………………………………….6-4 圖目錄 圖 1.1研究流程圖………………………………………………………………….1-8 圖 2.1期望、交付標的及結果之決策樹………………………………………….2-5 圖 2.2基本專案-功能矩陣組織...………………………………………………….2-7 圖 2.3專案管理過程圖....………………………………………………………….2-9 圖 2.4起始過程組..……………………………………………………………….2-10 圖 2.5規劃過程組..……………………………………………………………….2-11 圖 2.6執行過程組..……………………………………………………………….2-12 圖 2.7控管過程組..……………………………………………………………….2-13 圖 2.8結束過程組..……………………………………………………………….2-14 圖 2.9專案過程組的相互作用..………………………………………………….2-15 圖 2.10專案成本管理過程流程圖……………………………………………….2-16 圖 2.11成本估算過程模式……………………………………………………….2-17 圖 2.12成本預算過程模式……………………………………………………….2-18 圖 2.13成本控制過程模式……………………………………………………….2-18 圖 2.14實獲值管理流程………………………………………………………….2-28 圖 2.15實獲值管理圖…………………………………………………………….2-31 圖 3.1CaseⅠ 進度超前且成本節餘詮釋圖...…………………………………….3-6 圖 3.2CaseⅡ 進度落後但成本節餘詮釋圖...…………………………………….3-7 圖 3.3CaseⅢ 進度落後且成本超支詮釋圖...…………………………………….3-7 圖 3.4CaseⅢ 進度超前但成本超支詮釋圖...…………………………………….3-7 圖 3.5SPⅠ/CPⅠ績效象限圖……..……………………………………………….3-8 圖 3.6完工預測實獲值管理圖……………………….………………………….3-11 圖 3.7專案績效控制之PDCA循環…………………………………………….3-12 圖 3.8D/S工程個案PV曲線………………………………….………………….3-16 圖 3.9D/S工程個案EV曲線……………………………….…………………….3-17 圖 3.10D/S工程個案PV統計曲線……………………………………………….3-17 圖 3.11D/S工程個案EV統計曲線……………………………………………….3-18 圖 3.12D/S工程個案實獲值分析曲線………………………….……………….3-18 圖 3.13D/S工程PV基準管制圖………………………………...……………….3-19 圖 3.14D/S工程EV績效管制圖………………………………………………….3-20 圖 3.15行政辦公工程個案PV曲線………………………….….……………….3-21 圖 3.16行政辦公工程個案EV曲線…………………………….……………….3-22 圖 3.17行政辦公工程個案PV統計曲線……………………….……………….3-22 圖 3.18行政辦公工程個案EV統計曲線……………………….……………….3-23 圖 3.19行政辦公工程個案實獲值分析曲線…………………...…….………….3-23 圖 3.20行政辦公工程PV基準管制圖………………………….……………….3-24 圖 3.21行政辦公工程EV基準管制圖………………………….……………….3-25 圖 3.22SPI統計管制範圍圖…………………………………….…….………….3-30 圖 3.23CPI統計管制範圍圖…………………………………….……………….3-31 圖 3.24CR統計管制範圍圖……………………………………...…...………….3-32 圖 4.1營建工程專案成本管控層面導入EVMS之架構圖..…………………….4-4 圖 4.2專案成本管控起始過程組……………………………..….……………….4-5 圖 4.3定義營建工程範疇過程模式……………………………...……………….4-6 圖 4.4營建工程專案成本之主要組成架構……………………...……………….4-6 圖 4.5界定營建工程專案成本範圍過程模式…………………...……………….4-7 圖 4.6專案成本管控的規劃過程組……………………………...……………….4-8 圖 4.7WBS的分層分解……….…………………….…………….……………….4-9 圖 4.8WBS之分解流程……………………………..…………...……………….4-10 圖 4.9某偵察機之WBS及編碼………………………………….………..…….4-12 圖 4.10某交通專案的WBS及編碼……………………………………………..4-13 圖 4.11建立工作分解結構等過程模式……………………..….………………..4-14 圖 4.12功能式組織結構………………………………………...………………..4-15 圖 4.13專案式組織結構…………………………………..…….………………..4-15 圖 4.14矩陣式組織結構………………………………………...………………..4-16 圖 4.15NN建築工程WBS範例………………………………………………….4-17 圖 4.16MM公司OBS範例………………………………………...……………..4-17 圖4.17責任指派矩陣 ( WBS/OBS整合 )範例……….……….………………..4-17 圖 4.18合約成本結構…………………………………………...………………..4-19 圖 4.19計算合約成本過程模式………………………………...………………..4-20 圖 4.20專案成本管控執行過程組………………….……………..……………..4-20 圖 4.21現金流量、成本基準和出資金額……………………………………….4-22 圖 4.22專案工程O之工作分解結構示意圖…………………………………….4-24 圖 4.23執行過程組之過程模式………………………………...………………..4-25 圖 4.24專案成本管控的控管過程組…………………………...……………….4-25 圖 4.25實獲值管理圖……………………………………..…….……………….4-26 圖 4.26管控過程組之過程模式………………………………...……………….4-29 圖 4.27專案成本控管的結束過程組…………………………...………………4-30 圖 4.28專案結束過程組的過程模式………………………..….……………….4-31 圖 5.1案例A實獲值分析成果圖………………………………......…………….5-2 圖 5.2案例A計畫值 ( PV )曲線套繪圖……………………….….…………….5-4 圖 5.3案例A實獲值 ( EV )績效曲線套繪圖………………….….…………….5-6 圖 5.4案例A進度績效指標執行成果管制圖…………………………………...5-8 圖 5.5案例B實獲值分析成果圖……………………………….……………….5-10 圖 5.6案例B計畫值 (PV ) 曲線套繪圖……………………...….…………….5-12 圖 5.7案例B實獲值 (EV ) 績效曲線套繪圖………………………………….5-13 圖 5.8案例B進度績效指標 ( SPI ) 績效成果管制圖……….….…….……….5-15 圖 5.9案例C實獲值分析成果圖……………………………………….……….5-21 圖 5.10案例C進度績效指標 ( SPI ) 績效成果管制圖…….……...….……….5-25 圖 5.11案例C成本績效指標 ( CPI ) 績效成果管制圖…….………………….5-27 圖 5.12案例C當月SPI/當月CPI分佈趨勢圖………………….……………….5-28 圖 5.13案例C關鍵比率 ( CR ) 績效成果管制圖…………….……….……….5-29 圖 5.14案例D工作分解結構圖………………………………...……….……….5-33 圖 5.15案例D組織分解結構圖………………………………...……….……….5-34 圖 5.16案例D責任指派矩陣圖………………………………...……….……….5-35 圖 5.17案例D計畫值 ( PV ) 基準圖………………….………..……………….5-37 圖 5.18案例D計畫值 ( PV )曲線套繪圖………………….………………..….5-37 圖 5.19案例D實獲值管理成果圖………………….……………..…………….5-39 圖 5.20案例D實獲值 ( EV ) 曲線套繪圖………………….…..………………5-40 圖 5.21案例D進度績效指標 ( SPI ) 績效成果管制圖…….………………….5-42 圖 5.22案例成本績效指標 ( CPI )績效成果管制圖………….………………...5-44 圖 5.23案例D當月SPI/當月CPI執行成果分布圖…………..………………..5-45 圖 5.24案例C關鍵比率 ( CR ) 績效成果管制圖…………….………………..5-47 圖 5.25案例D實獲值管理15%法則完工預測圖…….……………..………….5-49 圖 5.26案例D時程13個月實獲值管理完工預圖…….……………..………….5-50 圖 5.27營建工程專案成本超支的特性要因圖………………...………………..5-54 表目錄 表 2.1專案的定義………………………………………..……………..………….2-2 表 2.2專案的特性…….…………………………………….…………..………….2-3 表 2.3專案管理的定義…….………………………………….………..………….2-4 表 2.4組織架構對專案的影響…….……………………….…………..………….2-8 表 2.5專案成本管理的定義……..………………………………..…..………….2-15 表 2.6國內對實獲值的研究與應用方向……..………………..……..………….2-26 表 2.7國外對實獲值的研究與應用方向……………………………..………….2-27 表 2.8實獲值管理的參數定義說明表………………………………..………….2-29 表 3.1Casel~CaseIV所代表意義詮釋表……………….……………..…………...3-9 表 3.2D/S工程個案PV與EV統計曲線之標準差表………………..…………..3-27 表3.3行政辦公工程個案PV與EV統計曲線之標準差表…………..………….3-28 表 3.4 2004~2005年專案之SPI及CPI表…………….……………..………….3-34 表 3.5 2004~2005年的102個專案之CR表…………..……………..………….3-35 表 4.1總計算表………………………………………………………..………….4-32 表4.2主分項計算表…………………………………….……………..………….4-33 表 4.3次分項計算表…………………………………………………..………….4-34 表 4.4細分項計算表…………………………………………………..………….4-35 表 4.5實獲值管理績效報告書………………………………………..………….4-36 表 5.1案例A實獲值參數表…………………………….……………..………….5-3 表 5.2案例B實獲值參數表…………………………...……………..…………..5-11 表 5.3案例C因續接可能衍生問題與因應對策表…………………..………….5-19 表 5.4案例C主要工程項目數量表…………………...……………..…………..5-20 表 5.5案例C實獲值參數表…………………………...……………..………….5-22 表 5.6案例D實獲值參數表…………………………...……………..………….5-36 | |
dc.language.iso | zh-TW | |
dc.title | 實獲值管理應用於營建工程專案成本管控之研究 | zh_TW |
dc.title | The Research of Earned Value Management for Applications of Construction Project Cost Controlling | en |
dc.type | Thesis | |
dc.date.schoolyear | 95-2 | |
dc.description.degree | 碩士 | |
dc.contributor.oralexamcommittee | 李建中,高聰忠,尹衍樑 | |
dc.subject.keyword | 實獲值,專案管理,專案成本管控,專案績效, | zh_TW |
dc.subject.keyword | Earned value management,project management,cost control of project,performance of project, | en |
dc.relation.page | 225 | |
dc.rights.note | 有償授權 | |
dc.date.accepted | 2007-07-23 | |
dc.contributor.author-college | 工學院 | zh_TW |
dc.contributor.author-dept | 土木工程學研究所 | zh_TW |
顯示於系所單位: | 土木工程學系 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-96-1.pdf 目前未授權公開取用 | 2.76 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。