請用此 Handle URI 來引用此文件:
http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/24148
標題: | 標準成本與作業基礎成本制在半導體公司運用的差異-以個案公司為例 The application differences of stanadrd cost and activity-based costing in a semiconductor company- case study |
作者: | YI-MING CHEN 陳益明 |
指導教授: | 李書行 |
關鍵字: | 作業基礎成本制, Activity-based costing, |
出版年 : | 2006 |
學位: | 碩士 |
摘要: | 半導體業在過去這幾年,雖然仍保持8%成長左右的成長,但高利潤卻是不復存在,歸咎其因實由於價格下降速度大於成本下降速度,其中晶圓代工業亦不能倖免。
晶圓代工管理階層無不絞盡腦汁善加運用成本資訊,除了原有標準成本,個案公司亦引進作業基礎成本制(ABC)來,惟兩種管理成本的制度各有擅長,本研究指出,ABC在客戶獲利分析專案(Customer Profitability Project) 績效評估(review actual performance)及作業基礎預算制”(Activity Based Budgeting)有其優勢,但標準成本在主要在定價策略上有其彈性。 Semiconductor enjoyed a 8% combined growth rate in the past years. However the Profit is getting worse as the cost improvement is less than price erosion. The pure foundry is one of the aforesaid profit trends. The management team of pure foundries dedicated to utilizing cost information. In addition to standard cost, activity based cost was introduced in semiconductor industry. Each of cost information had their roles. The research pointed out activity based cost information is useful in Customer Profitability Project, actual performance review and activity based budgeting. Standard cost information is useful mainly in Pricing strategy. |
URI: | http://tdr.lib.ntu.edu.tw/jspui/handle/123456789/24148 |
全文授權: | 未授權 |
顯示於系所單位: | 會計與管理決策組 |
文件中的檔案:
檔案 | 大小 | 格式 | |
---|---|---|---|
ntu-95-1.pdf 目前未授權公開取用 | 1.77 MB | Adobe PDF |
系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。